Building of a Multiple Layer Oil and Gas Condensate Field Integrated Simulation Model (Russian)

2014 ◽  
Author(s):  
M.A. Kuzevanov ◽  
S.V. Buchinskiy ◽  
D.N. Glumov ◽  
E.A. Reitblat
2014 ◽  
Author(s):  
M.A. Kuzevanov ◽  
S.V. Buchinskiy ◽  
D.N. Glumov ◽  
E.A. Reitblat

2017 ◽  
Vol 11 (12) ◽  
pp. 2793-2808 ◽  
Author(s):  
Julien Tremblay ◽  
Etienne Yergeau ◽  
Nathalie Fortin ◽  
Susan Cobanli ◽  
Miria Elias ◽  
...  

2014 ◽  
Author(s):  
R.. Hosein ◽  
R.. Mayrhoo ◽  
W. D. McCain

Abstract Bubble-point and dew-point pressures of oil and gas condensate reservoir fluids are used for planning the production profile of these reservoirs. Usually the best method for determination of these saturation pressures is by visual observation when a Constant Mass Expansion (CME) test is performed on a sample in a high pressure cell fitted with a glass window. In this test the cell pressure is reduced in steps and the pressure at which the first sign of gas bubbles is observed is recorded as bubble-point pressure for the oil samples and the first sign of liquid droplets is recorded as the dew-point pressure for the gas condensate samples. The experimental determination of saturation pressure especially for volatile oil and gas condensate require many small pressure reduction steps which make the observation method tedious, time consuming and expensive. In this study we have extended the Y-function which is often used to smooth out CME data for black oils below the bubble-point to determine saturation pressure of reservoir fluids. We started from the initial measured pressure and volume and by plotting log of the extended Y function which we call the YEXT function, with the corresponding pressure, two straight lines were obtained; one in the single phase region and the other in the two phase region. The point at which these two lines intersect is the saturation pressure. The differences between the saturation pressures determined by our proposed YEXT function method and the observation method was less than ± 4.0 % for the gas condensate, black oil and volatile oil samples studied. This extension of the Y function to determine dew-point and bubble-point pressures was not found elsewhere in the open literature. With this graphical method the determination of saturation pressures is less tedious and time consuming and expensive windowed cells are not required.


2021 ◽  
Author(s):  
Mohamed Ibrahim Mohamed ◽  
Ahmed Mahmoud El-Menoufi ◽  
Eman Abed Ezz El-Regal ◽  
Ahmed Mohamed Ali ◽  
Khaled Mohamed Mansour ◽  
...  

Abstract Field development planning of gas condensate fields using numerical simulation has many aspects to consider that may lead to a significant impact on production optimization. An important aspect is to account for the effects of network constraints and process plant operating conditions through an integrated asset model. This model should honor proper representation of the fluid within the reservoir, through the wells and up to the network and facility. Obaiyed is one of the biggest onshore gas field in Egypt, it is a highly heterogeneous gas condensate field located in the western desert of Egypt with more than 100 wells. Three initial condensate gas ratios are existing based on early PVT samples and production testing. The initial CGRs as follows;160, 115 and 42 STB/MMSCF. With continuous pressure depletion, the produced hydrocarbon composition stream changes, causing a deviation between the design parameters and the operating parameters of the equipment within the process plant, resulting in a decrease in the recovery of liquid condensate. Therefore, the facility engineers demand a dynamic update of a detailed composition stream to optimize the system and achieve greater economic value. The best way to obtain this compositional stream is by using a fully compositional integrated asset model. Utilizing a fully compositional model in Obaiyed is challenging, computationally expensive, and impractical, especially during the history match of the reservoir numerical model. In this paper, a case study for Obaiyed field is presented in which we used an alternative integrated asset modeling approach comprising a modified black-oil (MBO) that results in significant timesaving in the full-field reservoir simulation model. We then used a proper de-lumping scheme to convert the modified black oil tables into as many components as required by the surface network and process plant facility. The results of proposed approach are compared with a fully compositional approach for validity check. The results clearly identified the system bottlenecks. The model can be used to propose the best tie-in location of future wells in addition to providing first-pass flow assurance indications throughout the field's life and under different network configurations. The model enabled the facility engineers to keep the conditions of the surface facility within the optimized operating envelope throughout the field's lifetime.


Author(s):  
M. O. Fedorovich ◽  
◽  
A. Yu. Kosmacheva ◽  

The present paper describes the DIONISOS software package (Beicip-Technologies), where the reconstruction of the accumulation conditions and facies modeling of sand reservoirs Yu10, Yu9, Yu8, Yu7 and Yu6 of the Tyumenskaya Formation and carbonaceous-clay members acting as fluid seals within the Gerasimovskoye oil and gas condensate field located in the south of the Parabel district of the Tomsk region. Reconstructions of facies environments make it possible to consistently restore conditions and create a general principled model of the accumulation of sandy-argillaceous deposits of the Middle Jurassic PP in a given territory. Polyfacies deposits of the Bajocian are represented by sands of distributaries and stream-mouth bars, underwater slope of delta, above-water and underwater delta plains, argillaceous-carbonaceous sediments of floodplain lakes, bogs, marshes and lagoons, clays formed at the border of the above-water and underwater deltaic plains, silt deposits of above-water and underwater delta plains, prodelta clays. As a result of the 3D facies model construction, it is shown that the subcontinental sedimentary environments of sand reservoirs Yu10–Yu8 are replaced by deltaic and floodplain-lacustrine-boggy ones, and the formation of Yu7–Yu6 reservoirs occurs in conditions of coastal plain, periodically flooded by the sea. In total, 5 lithotypes of sand deposits have been identified, 1 – argillaceous-carbonaceous, 2 – argillaceous and 1 – silty. Computer facies 3D modeling of the sand bodies assemblage (hydrocarbon reservoirs) of the Bajocian age for the Gerasimovskoye oil and gas condensate field has been performed.


Sign in / Sign up

Export Citation Format

Share Document