Using Connection Technology to Further Enhance Fast Slim Hole Drilling - Case Histories and Lessons Learned

2011 ◽  
Author(s):  
Douglas Farquhar ◽  
Guillaume Plessis ◽  
Jeff Wood
2021 ◽  
Author(s):  
Hector Hugo Vizcarra Marin ◽  
Alex Ngan ◽  
Roberto Pineda ◽  
Juan Carlos Gomez ◽  
Jose Antonio Becerra

Abstract Given the increased demands on the production of hydrocarbons and cost-effectiveness for the Operator's development wells, the industry is challenged to continually explore new technology and methodology to improve drilling performance and operational efficiency. In this paper, two recent case histories showcase the technology, drilling engineering, and real-time optimization that resulted in record drilling times. The wells are located on shallow water in the Gulf of Mexico, with numerous drilling challenges, which typically resulted in significant Non-Productive Time (NPT). Through close collaboration with the Operator, early planning with a clear understanding of offset wells challenges, well plan that minimize drilling in the Upper Cretaceous "Brecha" Formation were formulated. The well plan was also designed to reduce the risk of stuck pipe while meeting the requirements to penetrate the geological targets laterally to increase the area of contact in the reservoir section. This project encapsulates the successful application of the latest Push-the-Bit Rotary Steerable System (RSS) with borehole enlargement technology through a proven drilling engineering process to optimize the drilling bottomhole assembly, bit selection, drilling parameters, and real-time monitoring & optimization The records drilling times in the two case histories can be replicated and further improved. A list of lessons learned and recommendations for the future wells are discussed. These include the well trajectory planning, directional drilling BHA optimization, directional control plan, drilling parameters to optimize hole cleaning, and downhole shocks & vibrations management during drilling and underreaming operation to increase the drilling performance ultimately. Also, it includes a proposed drilling blueprint to continually push the limit of incremental drilling performance through the use of RSS with hydraulics drilling reamers through the Jurassic-age formations in shallow waters, Gulf of Mexico.


2021 ◽  
Author(s):  
Marco A Aburto Perez ◽  
Anurag S Yadav ◽  
Steven R Farley

Abstract Based on input from key operators in the Middle East region, a new rotary steerable system (RSS) was launched after a compressed development schedule. This paper describes the development and introduction of the larger tool sizes needed for both onshore and offshore hole sections, including hole sizes from 12 in. and up, in the Middle East. It also outlines the deliberate design of the tool for local assembly and repair. Large diameter (9-1/2 and 11 in.) RSS designs used an existing, smaller design for Middle East applications in both offshore and onshore wells as a basis. When designing these new sizes, engineers took note of lessons learned with smaller sizes of the tool and incorporated design elements for local manufacturing, assembly, and repair. The resulting simple, modular construction enables increased levels of local content and provides for significant reductions in transportation, and therefore associated emissions. Of course, although local content and sustainability are highly desirable, performance is essential, and this paper describes case histories demonstrating how well the new tool worked in real-world Middle East applications. In one notable example, the newly introduced 9 1/2-in. diameter RSS was used to drill an offshore section in the Gulf of Arabia. The tool was mobilized after two older generation RSS had become stuck for days. Consisting primarily of argillaceous limestone, the formation had a history of stuck-pipe events. The new RSS was recommended for this application because of a slicker construction, with a fully rotational bias unit, minimal bottom hole assembly (BHA) stabilization, and an optimized junk slot area, which together help to reduce stuck-pipe risks. The tool drilled to the target depth in a single run, thereby achieving all directional requirements. Notably, after reaching the target depth, the assembly was tripped out of the hole without any requirement for backreaming. This seamless exit, in turn, indicated achieving a smooth wellbore. Other case histories demonstrate results with both new sizes of this tool. The paper also discusses in detail the ability to repair locally and engage the local supply chain. Specifically with Middle East applications in mind, a new, simple RSS design in large diameter versions has demonstrated success in offshore and onshore applications across the region. The design has also proven capabilities for manufacturing and repair local to operations, which enables maximizing in-country value, optimizing use of the tools, and energizing local supply chains.


Author(s):  
Warren Brown ◽  
Geoff Evans ◽  
Lorna Carpenter

Over the course of the past 20 years, methods have been developed for assessing the probability and root cause of bolted joint leakage based on sound engineering assessment techniques. Those methods were incorporated, in part, into ASME PCC-1-2010 Appendix O [7] and provide the only published standard method for establishing bolted joint assembly bolt load. As detailed in previous papers, the method can also be used for troubleshooting joint leakage. This paper addresses a series of actual joint leakage cases, outlines the analysis performed to determine root cause of failure and the actions taken to successfully eliminate future incidents of failure (lessons learned).


2002 ◽  
Vol 42 (1) ◽  
pp. 113
Author(s):  
P. Behrenbruch

Uncertainty in petroleum development projects is most often associated with petroleum reserves. It is the limited amount of subsurface data typically available during the time of development planning that creates this situation. Risks are associated not only with reservoir uncertainty but also with wells and production facilities. Risks for offshore projects, as compared to those onshore, are further compounded by very large capital expenditures and less flexibility in catering for subsurface surprises, or remedial action in case of engineering blunders.These concepts are illustrated using case histories of successful and failed projects. Lessons learned from these and other projects are then summarised and processes for uncertainty and risk management are outlined. Risk and uncertainty cover a wide range of issues, and relate to geoscience, reservoir engineering, well technology, facilities engineering, operations, and project planning and evaluation.


2017 ◽  
Author(s):  
R. B. Vadinal ◽  
F. Fabri ◽  
G. T. Teixeira ◽  
K. A. Gonzaga ◽  
P. H. P da Silva

2011 ◽  
Vol 30 (2) ◽  
pp. 143-147 ◽  
Author(s):  
Xiaole Yang ◽  
Linh T.T. Dinh ◽  
Diana Castellanos ◽  
Carmen H. Osorio Amado ◽  
Dedy Ng ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document