High-Rate Gas Well Completions in Egypt's Mediterranean Sea: Tao Field Development Strategy and Case Histories

2010 ◽  
Author(s):  
Mohammed Abd Elwahab Mekawy ◽  
Vincent Fabien Rodet ◽  
Reza Kemal Mered ◽  
Ricardo Andres Gomez ◽  
Mehmet Parlar
2021 ◽  
Author(s):  
Aqib Qureshi ◽  
Kushal Gupta ◽  
Salim Abdalla Al Ali ◽  
Yoshito Uchiyama ◽  
Rohit Singh Negi

Abstract In multilayered reservoirs, major focus has been on the usage of smart well completion technologies to help improve recoveries, particularly with technological improvements and an increasing expanse of opportunities in more challenging and rewarding assets. The fundamental focus has been to design well completions that integrate several surface/subsurface sub zones and automate the flow control from each zone. In Multi zone Smart Completion Wells where significant investment is made to complete smart wells with remotely controlled inflow control valves (ICV), reservoir sweep & drain accessibilities becomes decisive when evaluating the efficiency of recovery and long-term field development strategy. Smart completion designs for multi-lateral wells present many challenges in terms of completion deployment and interventions in life of well. The complexity of operations increases with deviation, type of completion equipment, number of zones and planned interventions. In offshore, UAE a similar multilateral well was designed to be completed with 4 zone smart completion and had a mandatory requirement of accessibility to lower most drain (for future interventions) with the ability to plug the lower drain till future requirements arises. A solution is to utilize nipple & blanking plug in lower most drain, which was implemented in this well. Upon successful deployment of completion, plug was retrieved on coil tubing and lower drain accessibility was confirmed. However, during re-installation of blanking plug on coil tubing in deviated section, issues were encountered to pass through the ICV profiles. In attempts to pass through ICV profiles, blanking plug and running tool got disconnected from coil tubing, leaving the fish inside one of ICV valve. Several attempts were made to retrieve the blanking plug with rig on coil tubing without success by using thru-tubing fishing equipment options available in country. Well was suspend to work-out fishing strategy & evaluate availability of fishing equipment worldwide. Consideration was done for design and manufacture application specific fishing tools to perform workover with barge for such smart completion, as it includes a number of downhole components that makes its retrieval more challenging, and there are no standard procedure or provision in place to retrieve such complex completions in highly deviated section. A barge was mobilized with coil tubing, which performed the fishing operation as planned. Careful selection of equipment's, BHA and operational parameters resulted in successful retrieval of blanking plug & running tools. Accessibility to well was gain and confirmed. This paper presents the situation that was faced, the remedial work done to complete well, fishing operations and the subsequent factors considered for choice of equipment and operation on well. This paper concludes a detailed account of factors to consider for planning smart completions in horizontal multilateral wells & the successful fishing operation – an excellent example of how careful planning, dedicated project management, specialized design fishing tools, experienced personnel and a collaborative relationship between team's leads to a successful operation and prevented an extremely expensive workover of a high technology completion well.


Author(s):  
R.A. Gasumov ◽  
◽  
E.R. Gasumov ◽  

The article discusses the modes of movement of gas-liquid flows in relation to the operating conditions of waterlogged gas wells at a late stage of field development. Algorithms have been developed for calculating gas well operation modes based on experimental work under conditions that reproduce the actual operating conditions of flooded wells of Cenomanian gas deposits. The concept of calculating the technological mode of operation of gas wells with a single-row elevator according to the critical velocity of the upward flow is considered based on the study of the equilibrium conditions of two oppositely directed forces: the gravity of water drops directed downward and the lifting force moving water drops with a gas flow directed upward. A calculation was made according to the method of the averaged physical parameters of formation water and natural gas in the conditions of flooded Cenomanian gas wells in Western Siberia. The results of a study of the dependence of the critical flow rate of Cenomanian wells on bottomhole pressure and diameter of elevator pipes are presented.


2017 ◽  
Author(s):  
Robert Dixie Haymes ◽  
Khalid Imtiaz ◽  
Carlo Mazzella
Keyword(s):  

2018 ◽  
Author(s):  
Humoud Almohammad ◽  
Abdullah Al-Derbass ◽  
Abdulaziz Alsubaie ◽  
Mohammed Bumajdad ◽  
Abdulaziz Al-Khamis ◽  
...  

2006 ◽  
Author(s):  
C.Y. McCants ◽  
Richard Hall ◽  
Brock Tuppeny ◽  
Keith Collins ◽  
Mohd. Khalid Jamiran and Stan Rae

Sign in / Sign up

Export Citation Format

Share Document