Optimizing Selective Stimulation Treatments Using Coiled Tubing and Fluidic Oscillator Yields Additional Oil Production From Carbonate Formations in Southern Mexico: Case Studies

2009 ◽  
Author(s):  
Juan Jose De la Fuente Rodriguez ◽  
Francisco Garcia Torres ◽  
Joel Vladimir Ulloa Gutierrez ◽  
J. Eduardo Soriano ◽  
Carlos Caballero
2014 ◽  
Author(s):  
Packirisamy Packirisamy ◽  
H. Al-Bader ◽  
Y. Al-Salali ◽  
Vidya Sagar Vidyasagar ◽  
A. Manimaran ◽  
...  

Author(s):  
Marcos Faerstein ◽  
Paulo Couto ◽  
José Alves

This paper discusses the impacts that rock wettability may have upon the production and recovery of oil with waterflooding in carbonate reservoirs and how it should be modeled. A broad review of the state of the art has been conducted surveying existing disagreements and knowledge gaps, basic definitions, as well as the correct understanding of the physical phenomena and identification of the characteristics of the various wettability scenarios. Case studies conducted with a black oil reservoir simulator evaluated the impact of different wettability scenarios on oil production and recovery. A comprehensive approach considering all the parameters involved in the wettability modeling was applied to the case studies, showing how the behavior of the reservoir varies as a function of their wettability. This paper shows how relative permeability and capillary pressure should be varied to correctly represent different wettability scenarios and consequently assess its impacts on oil production and recovery. The case studies show that the evaluation of the volume of oil in the reservoir is impacted by wettability through the irreducible water saturation and primary drainage capillary pressure and must be considered in the analyses. In long term analyses, mixed-wet scenarios have a higher oil production and recovery. In medium and short term, the water-wet scenarios have the higher recovery, but in relation to oil production, these scenarios are negatively influenced by the smaller volume of oil in place. The main contribution of this paper is the simultaneous analyses of all the parameters involved in the modeling of wettability showing how they impact the behavior of a reservoir. It shows how the parameters must be varied in a heterogeneous reservoir and how heterogeneity impacts the relevance of wettability in the studies.


2021 ◽  
Author(s):  
Oleksandr Spuskanyuk ◽  
David C Haeberle ◽  
Brandon Max Baumert ◽  
Brian Matthew King ◽  
Benjamin T Hillier

Abstract The growing number of upcoming well abandonments has become an important driver to seek efficiencies in optimizing abandonment costs while establishing long term well integrity and complying with local regulatory requirements. With an increasing global inventory of Plug and Abandonment (P&A) candidates, Exxonmobil has been driven to look for the most reliable, safe, and cost-efficient P&A technologies. ExxonMobil's P&A guidelines are consistent with and often more stringent than the local regulatory requirements but are also achievable, at least in part, with rigless technologies, leading to a more cost-efficient approach while ensuring well integrity. The objective of this paper is to demonstrate the success of rigless abandonments and their benefits compared to rig-based solutions. When developing a well abandonment plan, it is essential to consider a number of factors. These include local regulations, identification of zones to be isolated and suitable caprocks, and recognition of constraints including well history, conditions and uncertainties. Teams should begin with low cost operations without a rig if possible, estimate costs and effectiveness to achieve the barrier requirements, and evaluate batch operation opportunities for multi-well programs. ExxonMobil case studies are shown to help describe in detail how to make decisions about applicability of rigless abandonment options and how to properly execute such abandonments to achieve compliance with the barrier requirements. It has been demonstrated that significant cost savings can be achieved by staging the abandonment program in a way that lower cost technologies are utilized during the early stages of well abandonment, starting with wireline where possible, followed by coiled tubing and finally by a pulling unit, as appropriate. P&A execution could be achieved without a rig in a majority of cases, including most offshore wells, with the need to use a rig only in special circumstances or phases of execution. It is important to note that the barrier placement and safety of rigless P&A execution will not be compromised, as compared to the rig-based P&As. Additional cost savings could be achieved by further optimizing P&A design at the well design stage, ensuring that there are no built-in limiters that would prevent rigless P&A execution at the end of well life. Several case studies from ExxonMobil's global offshore experience demonstrate the feasibility and effectiveness of rigless P&A operations, with significant cost savings compared to rig-based P&As. It has been evident that rigless P&A choice is applicable to the variety of ExxonMobil's P&A projects of different complexities, with the same or superior quality of abandonment and safety record.


2015 ◽  
Author(s):  
O. Jimenez Bueno ◽  
A. F. Mejia Nava ◽  
H. Hernandez Leyva ◽  
C. A. Mendoza Ortega ◽  
P. Ramondenc ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document