Extending The Range Of Multiphase Metering To Challenging High Water Cut Gas-Lifted Wells: TOTAL ABK Field Application
Keyword(s):
2021 ◽
Vol 781
(2)
◽
pp. 022028
2021 ◽
Vol 783
(1)
◽
pp. 012008
2021 ◽
Vol 692
(4)
◽
pp. 042096