scholarly journals Development of High-voltage Testing System Based on Power Frequency Converter Used in Partial Discharge Tests of Potential Transformers

2020 ◽  
Vol 32 (2) ◽  
pp. 573 ◽  
Author(s):  
Tongpian Prombud ◽  
Peerawut Yutthagowith
Energies ◽  
2021 ◽  
Vol 14 (7) ◽  
pp. 2014
Author(s):  
Banyat Leelachariyakul ◽  
Peerawut Yutthagowith

This paper presents application of a resonant power frequency converter for high-voltage (HV) and partial discharge (PD) test of a voltage transformer. The rating voltage, power, and frequency of the system are 70 kVrms, 40 kVA, and 200 Hz, respectively. The testing system utilized the converter feeding to an HV testing transformer connected to a conventional partial discharge detection system. The converter system comprising a rectifier and insulated-gate bipolar (IGBT) switches with the H-bridge configuration was applied as a low-voltage source instead of a conventional motor-generator test set which requires large space and high cost. The requirements of the test according to the standards are quality of the test voltage and the background noise level. The required voltage must have the different voltage (DV) and total harmonic distortion (THDv) in the acceptable values of less than 5%. The DV is defined as the difference of the root mean square and peak voltages in percent. The required background noise level must be lower than 2.5 pC. Simulations and experiments were performed for verification of the developed system performance in comparison with those of the previously developed system based on the pulse width modulation converter. It is found that the developed system can provide the testing voltage with the DV and the THDv of lower than 1% and the background noise level of lower than 1 pC. Considering this achievement of promising performance, the developed system is an attractive choice for the HV and PD testing of voltage transformers in real practice.


Author(s):  
Mr. Shaik Mohammad Tayyab ◽  
◽  
Prof. K. Chandra Sekhar ◽  

The Transmission part of the power sector is very much important as it deals with the huge losses of the complete power sector. Transmission substations play a key role in the power transmission process since the power generation at the power plants to the final stage at the consumer end utilization. The utmost care should be taken to protect these transmission substations as same as the care is taken to reduce the losses. The substation needs to be protected from blackouts which is the big problem of substations. For this, the substation high voltage equipment’s like GIS & Power Transformers are to be properly installed & energized according to the standards & care is taken for its maintenance. So, during the commissioning process which is after installation & before energization, there are different tests which are performed on high voltage equipment’s, especially the Gas Insulated Switchgear, in which the High Voltage & Partial discharge has huge impact as the ageing and the life time of GIS can be easily assessed & the GIS can be saved from the damage, tripping and the blackout of a substation. The procedure of the high voltage test and the partial discharge tests are clearly explained in this paper.


Sign in / Sign up

Export Citation Format

Share Document