scholarly journals Setting Control Limits in a Multivariate Exponentially Weighted Moving Likelihood Control Chart

2021 ◽  
Vol 6 (3) ◽  
pp. 84-90
Author(s):  
Takumi SARUHASHI ◽  
Masato OHKUBO ◽  
Yuma UENO ◽  
Yasushi NAGATA
2022 ◽  
Vol 4 (1) ◽  
Author(s):  
Wibawati Wibawati ◽  
Widya Amalia Rahma ◽  
Muhammad Ahsan ◽  
Wilda Melia Udiatami

In the industrial sector, the measurement results of a quality characteristic often involve an uncertainty interval (interval indeterminacy). This causes the classical control chart to be less suitable for monitoring quality. Currently, a control chart with a neutrosophic approach has been developed. The neutrosophic control chart was developed based on the concept of neutrosophic numbers with control charts. One of the control charts that have been developed to monitor the mean process is the Neutrosophic Exponentially Weighted Moving Average (NEWMA) X control chart. This control chart is a combination of neutrosophic with classical EWMA control chart.  The neutrosophic control chart consists of two control charts, namely lower and upper, each of which consists of upper and lower control limits. Therefore, NEWMA X is more sensitive to detect out-of-control observations. In this research, the NEWMA X control chart will be used to monitor the average process of the thickness of the panasap dark grey 5mm glass produced by a glass industry. Through the analysis in this research, it was found that by using weighting λN [0, 10; 0, 10] and constant value kN [2, 565; 2, 675], the average process of the thickness of panasap dark grey 5mm glass has not beet controlled statistically because 21 observations were identified that were outside the control limits (out of control). When compared with the classical EWMA control chart with the same weighting λ, 17 observations were detected out of control. This proves that the NEWMA X control chart is more sensitive in detecting observations that are out of control because the determination of the in-control state is based on two values, lower and upper, both at the lower and upper control limits.


2020 ◽  
Vol 2020 ◽  
pp. 1-9
Author(s):  
Johnson A. Adewara ◽  
Kayode S. Adekeye ◽  
Olubisi L. Aako

In this paper, two methods of control chart were proposed to monitor the process based on the two-parameter Gompertz distribution. The proposed methods are the Gompertz Shewhart approach and Gompertz skewness correction method. A simulation study was conducted to compare the performance of the proposed chart with that of the skewness correction approach for various sample sizes. Furthermore, real-life data on thickness of paint on refrigerators which are nonnormal data that have attributes of a Gompertz distribution were used to illustrate the proposed control chart. The coverage probability (CP), control limit interval (CLI), and average run length (ARL) were used to measure the performance of the two methods. It was found that the Gompertz exact method where the control limits are calculated through the percentiles of the underline distribution has the highest coverage probability, while the Gompertz Shewhart approach and Gompertz skewness correction method have the least CLI and ARL. Hence, the two-parameter Gompertz-based methods would detect out-of-control faster for Gompertz-based X¯ charts.


2018 ◽  
Vol 7 (1) ◽  
pp. 23-32
Author(s):  
Adestya Ayu Maharani ◽  
Mustafid Mustafid ◽  
Sudarno Sudarno

Water is one of the most important elements for human life, water treatment is done for human consumption and must fulfill the health requirements with the levels of certain parameters. Quality of Water Treatment II is the second water purification installation owned by PDAM Tirta Moedal Semarang City with production capacity of 60 l/s. Variables used in the water treatment process are correlated with each other, so used multivariate control chart. The Multivariate Exponentially Weighted Moving Average control chart is used for monitoring process mean, and the Multivariate Exponentially Weighted Moving Variance control chart is used for monitoring process variability. The variables used are colour, turbidity, organic substance, manganese and the total dissolved solid. MEWMA control chart with λ = 0.5, showed that the process mean is controlled statistically. MEWMV control chart showed that variability is controlled statistically in λ = 0.4, ω = 0.2 and L = 3.3213. MEWMA and MEWMV control chart showed that the process is not capable because it obtained the value of process capability index less than 1. Keywords: Water, Multivariate Exponentially Weighted Moving Average, Multivariate Exponentially Weighted Moving Variance, process capability.


2020 ◽  
Vol 1 (1) ◽  
pp. 9-16
Author(s):  
O. L. Aako ◽  
J. A. Adewara ◽  
K. S Adekeye ◽  
E. B. Nkemnole

The fundamental assumption of variable control charts is that the data are normally distributed and spread randomly about the mean. Process data are not always normally distributed, hence there is need to set up appropriate control charts that gives accurate control limits to monitor processes that are skewed. In this study Shewhart-type control charts for monitoring positively skewed data that are assumed to be from Marshall-Olkin Inverse Loglogistic Distribution (MOILLD) was developed. Average Run Length (ARL) and Control Limits Interval (CLI) were adopted to assess the stability and performance of the MOILLD control chart. The results obtained were compared with Classical Shewhart (CS) and Skewness Correction (SC) control charts using the ARL and CLI. It was discovered that the control charts based on MOILLD performed better and are more stable compare to CS and SC control charts. It is therefore recommended that for positively skewed data, a Marshall-Olkin Inverse Loglogistic Distribution based control chart will be more appropriate.


2018 ◽  
Vol 17 (1) ◽  
Author(s):  
Darmanto Darmanto

<p><em>The manufacturing production process that is currently trend is short-run. Short-run process is a job shop and a just in-time. These causes the process parameters to be unknown due to unavailability of data and generally a small amount of product. The control chart is one of the control charts which  designed for the short run. The procedure of the control chart follows the concept of succesive difference and under the assumption of the multivariate Normal distribution. The sensitivity level of a control chart is evaluated based on the average run length (ARL) value. In this study, the ARL value was calculated based on the shift simulation of the average vector by recording the first m-point out of the control limits. The average vector shift simulation of the target () is performed simultaneously with the properties of a positive shift (=+ δ). Variations of data size and many variables in this study were m = 20, 50 and p = 2, 4, 8, respectively. Each scheme (a combination of δ, m and p) is iterated 250,000 times. The simulation results show that for all schemes when both parameters are known ARL<sub>0 </sub>≈ 370. But, when parameters are unknown, ARL<sub>1</sub> turn to smaller. This conclusion also implied when the number of p and n are increased, it reduce the sensitivity of the control chart.</em></p>