scholarly journals The device layers and transport facilities of hemihydrate phosphogypsum (waste byproduct of the production of nitrogen-phosphorus fertilizers)

2019 ◽  
Vol 6 (1) ◽  
Author(s):  
Andrey Kochetkov ◽  
Natal’ya Shchegoleva ◽  
Sergey Korotkovskiy ◽  
Victor Talalai ◽  
Yury Vasilyev ◽  
...  

The implementation of the proposed innovative project on the use of phosphogypsum waste in road construction will: solve the problem of recycling and processing of phosphogypsum by using it as a local by-material for the construction of roadbed and foundations of roads; replace natural gypsum with cheaper raw materials for cement, construction and road industry; reduce the cost of construction of roads and extend the turnaround time by improving the quality of their properties. Road with the use of phosphogypsum is cheaper by 30 % than roads with traditional technologies. In the swampy area due to the characteristics of the material, combining solidity and lightness, phosphogypsum is not interchangeable at all. It allows you to make reliable and durable roads. The design is obtained up to five times stronger than the required standards. At the same time, at the first stage of construction of the road, it is possible to make an intermediate type, making the bases of phosphogypsum, and later laying the remaining structural layers of crushed stone and asphalt. In this case, the coating of technical gypsum is not destroyed, even with the passage of heavy tracked vehicles and at low temperatures.

2019 ◽  
Vol 6 (3) ◽  
Author(s):  
Kabanov Aleksandr ◽  
Irina Kolos ◽  
Viktoriya Chernyaeva ◽  
Aleksey Ilin ◽  
Olga Medvedeva ◽  
...  

This article discusses the problems that arise in the operation of road structures. One of the most important is rutting. Indicators of resistance to rutting depend on the method of design of non-rigid pavement and operational parameters, which allows to obtain the applied method of volumetric design of asphalt mix «Superpave» (SP-19), which in our country was called «SPAS». The authors, together with the staff of the laboratory of asphalt Concrete plant – 1, monitored asphalt concrete mixtures designed according to the «Superpave» system on the asphalt mixing plant. Then tests were carried out according to the method of PNST 181-2016 on the susceptibility of asphalt concrete materials to shear deformations arising under the action of repeated passes of the loaded wheel at ambient temperature. The result of the study of rutting showed that the mixture SP-19 have predominantly traditional. More detailed research results are presented in this article. Based on the data obtained from the results, conclusions were formulated: the Studies show that the method of «Superpeyv» is updated to the requirements of technical supervision at the objects of the road complex of the Russian Federation. In conclusion, the authors have formulated conclusions on the research: a comparison of physical and mechanical performance of asphalt concrete mix SP-19 on PNST 114 and fine-grained asphalt concrete mix type A brand I shows that the shear stability in terms of the average depth of the track is higher for the brand SP-19 by 38 %; set the required mixing temperature and compaction of asphalt concrete mixture on the system «Superpeyv»; the release of a pilot batch of asphalt concrete mix of SP-19 brand at the production site of JSC «ABZ-1» showed that the recipe selected in the laboratory is reproduced in the ABZ; cores selected within the framework of technical supervision from the experimental coating and tested in the laboratory showed corresponding to the requirements of ODM 218.4.038-2017; assessment of economic efficiency at the cost of asphalt concrete mix of SP-19 brand showed a decrease of 2.2 % relative to the cost of fine-grained asphalt concrete mix; the increase in the service life of the road surface h 30–50 % by reducing rutting increases its turnaround time. At the same time, economic efficiency can reach 50 % per m2.


Author(s):  
Eva Rita

In development and reconstruction of roads frequent changes work items, affecting the cost, turnaround time and quality of work. In order to determine what factors cause of the technical justification has conducted a study of eight packages of road construction and eight packages of reconstruction road capacity of West Sumatra in the unit Implementation of National Road Region I and Region II under  theNational Road Agency of West Sumatera Province. The work packages studied wasthe work conducted in 2009 to 2015. The method used was descriptive-evaluative research. Results of the study found the 7 causal factors do technical justification that the initial design of the contract is not in accordance with the results of the engineering field, not taking into account the design life of the road, , has not been calculated in detail the volume and the price for each item of work, do not pay attention to Standard Directorate general of Highways Ministry of public Works, the land is not available when the project is implemented, the results of field surveys for planning is not complete, and the occurrence of overlapping projects between the state and local budgets. To eliminate the occurrence of increased costs due to technical justification is necessary to complete the field survey by calculating in detail the volume and the price for each work item.


2020 ◽  
Vol 3 (1) ◽  
pp. 62-69 ◽  
Author(s):  
I. Odenbah

this article discusses some new modern technologies in the construction of highways. The paper analyzes the use of such innovations as: various modifiers added to bitumen; advanced technologies of engineering surveys and computer-aided design of highways; geosynthetic materials for reinforcing the roadbed and asphalt concrete pavement; PBB; bituminous polymer road belts; geotextile; foam-glass rubble; rubber crumb. The advantages of using innovations in road construction are highlighted. Obstacles to the use of certain technologies are noted, taking into account the Russian reality. The author concludes that the use of innovative materials becomes economically justified at the stage of construction and subsequent operation of the road surface. New technologies can not only improve the quality of roads, but also improve road safety. Innovations lead to progressive changes and ensure the dynamic development of the construction industry, primarily by reducing the cost and timing of construction, improving the quality of constructed facilities, and improving the comfort of living and operation. The paper discusses classical methods for the design works of the foundation and the GM made a review of modern structures and technologies on their device. In order to assess the possibility of using linear calculation for sheet piling fences, deep pit modeling was performed in the SCAD and PLAXIS software systems. The results of the work are the following conclusions: 1. the method of increasing the efficiency of technologies at the device walling of the pit is proposed; 2. a finite element model of soil and GM collaboration was created. To evaluate the effectiveness of the options, we used decision-making methods based on optimization criteria, taking into account the degree of risks involved in the work. It is established that the necessary factor is the geotechnical support of technological impacts, which allows monitoring of works on the degree of safety and impact on highways.


2017 ◽  
pp. 139-145
Author(s):  
R. I. Hamidullin ◽  
L. B. Senkevich

A study of the quality of the development of estimate documentation on the cost of construction at all stages of the implementation of large projects in the oil and gas industry is conducted. The main problems that arise in construction organizations are indicated. The analysis of the choice of the perfect methodology of mathematical modeling of the investigated business process for improving the activity of budget calculations, conducting quality assessment of estimates and criteria for automation of design estimates is performed.


2021 ◽  
Vol 2021 (23) ◽  
pp. 31-42
Author(s):  
Anatolii Tsynka ◽  
◽  
Andrii Hrinchuk ◽  
Ivan Rakovych ◽  
◽  
...  

Introduction. In the modern conditions of the pricing system in the construction of Ukraine, the key value have the estimated norms, which are presented in separate collections, the main purpose of which is to determine the standard quantity of resources required to perform a particular type of work as a basis for the transition to the cost indicators. In order to determine the cost of road work objectively and accurately, it is essential that the indicators of estimated norms meet the requirements of regulatory documents and modern methods of execution of road works.Problematics. In connection with the active improvement of the regulatory base of the road construction industry, permanent upgrade of road organizations technique fleet, the introduction of new technologies and materials in construction and operation of roads, improving the methods of work there is a discrepancy between the existing resource element of estimated norms and the actual conditions of work in terms of built-up labor costs, the operation time of machines and mechanisms and the range of materials. Accordingly, it affects the reliability and accuracy of determining the cost of road works.Purpose. Improvement and harmonization with actual working conditions and requirements of regulatory documents of industry regulatory and estimate base of resource elementary estimated norms for work performed during construction, reconstruction, repair and operational maintenance of roads and bridges to ensure reliable and valid technical, economic and estimated calculations.Materials and methods. During work performance the analysis of the regulatory documentation, establishing the requirements to the technology of road works and materials has been carried out. A number of chronometric observations with the measurement of time of road works in full-scale conditions was carried out. The obtained data were summarized, averaged and on their basis the indicators of the resource element of the estimated norms were estimated.Results. A review of the main amendments and additions, which came into force after the approval of Amendment No 2 SOU 42.1-37641918-035:2018 [1] and Amendment No 2 SOU 42.1-37641918-071:2018 [2], which were developed to improve the regulatory-estimate base for the calculation of road works, taking into account the requirements and provisions of existing regulatory documents taking into account the current state of scientific and technological progress in the road sector.Conclusions. The above analysis of the amendments that came into force with the approval of [1]. and [2] will systematize the innovations provided by the requirements of current regulatory documents on the calculation of the cost of road works and the development of relevant documents at all stages of the investment process, planning and organization of road works, as well as the writing-off of material resources. Review and systematization of recent improvements in the estimated regulatory documents for road works will provide an opportunity to optimally plan the use of available material, labor and financial resources, often limited.Keywords: public road, operational maintenance, investment documentation, overhaul and current repairs, machine, mechanism, regulatory document, resource element estimate norm, Standard of Organization of Ukraine.


2021 ◽  
Vol 6 (2) ◽  
pp. 70-77
Author(s):  
Ari Siswanto ◽  
◽  
Ira Kusumawaty ◽  

Water functions are very diverse for humans for daily needs such as drinking water, bathing, agriculture, development, aesthetics, and lower temperatures. Palembang is a lowland area dominated by wetlands, tidal swamps, and rivers. The types of houses on stilts on the banks of the Musi river are limas, Gudang, and Chinese stilt houses which are always associated with the water environment. The construction of roads replacing the role of rivers has realized people that the water environment has an important meaning for the house on stilts. The research objective was to explore the meaning of the water environment from various aspects for residents, stilt houses, and their environment. This research method is a case study with data collection through interviews, observation, measurements, and taking photos. Data and findings were analyzed and juxtaposed with images in the field. The road construction has eliminated part of the function of the river and influenced the change in orientation of the house on stilts. In conclusion, respect for the water environment including rivers has decreased, causing the quality of the river to decline, and the house on stilts cannot take advantage of the existence of the water environment optimally


2019 ◽  
Vol 27 (2) ◽  
pp. 115-132
Author(s):  
Hanan Abdullah Hassan Al-Amar ◽  
Qasim Ali Omran Al-Bayati ◽  
Huda Jabbar Kadhum Al-Haiyali

The financial operations which carried out by economic unity are proven treatment and documenting and continuous down to makers decision by relevance objective and time and then to reflect on the decision maker in any center of responsibility. That ’s provided by the system accounting information where the source is the basis for producing important accounting information, And the cost accounting information systems of the most important information systems that deal with data processing and conversion to information of relative importance to the beneficiaries. Which is consist with The objective of the research that emphasize the importance of accounting systems in general and systems cost in particular to achieve the highest c The research has led to a number of results, the most important of which is the difficulty in controlling quality costs as well as the waste of economic resources in the company. The researchers recommended adherence to the technical standards to achieve the quality of performance as well as conducting a thorough examination of samples and focusing on the quality of raw materials and testing before use to reduce the proportion Damage.


Author(s):  
Т. Дмитриева ◽  
T. Dmitrieva ◽  
Н. Куцына ◽  
N. Kucyna ◽  
А. Безродных ◽  
...  

The paper discusses the main aspects of soil reinforcement in road construction by adding a binder component to them. The use of this technology allows to solve the problem of high-quality raw materials shortage while improving the physicomechanical characteristics or keeping them at the same level, as well as to increase labor productivity and reduce production costs. The technogenic raw materials for the production of soil concrete were studied, the main physicomechanical characteristics and requirements that must be taken into account when selecting the composition of the soil concrete mixture were analyzed. The paper compares the physicomechanical characteristics of the road composite, reveals the advantages and disadvantages of introducing binder components of various types: cement, cement with modifier and a complex binder. It has been established that the introduction of a complex binder or cement with modifier contributes to the improvement of the physicomechanical characteristics while reducing the consumption of cement in the composition of the soil-concrete mixture compared to traditional soil-concrete with cement.


2019 ◽  
Vol 2 (1) ◽  
pp. 75
Author(s):  
Philipus Resato Nahak ◽  
Yosef Cahyo ◽  
Sigit Winarto

The increase in traffic volume will cause a decrease in service due to decreased road capacity due to an increase in side constraints and due to the increase in traffic volume itself, which will ultimately cause the level of road saturation to increase. The situation occurred in the Umasukaer road section of the Malacca Regency. Therefore it is necessary to address improvements in the quality of the road in order to meet the feasibility of transportation facilities by taking into account the existing technical requirements. The results of planning found that through the 2015 LHR survey data with a prediction of an increase in traffic density of 6% per year, the LHR was obtained with a planned age of 7 years = 2540.7 vehicles/day/department and a 20-year plan life LHR = 5419.1 ked/day / major. The results of a gradual construction planning pavement study can be concluded that the planning model that has been designed is effective in strengthening road construction in accordance with existing technical requirements and efficient in terms of financing. The final results of gradual construction pavement thickness results are: Ashburton thickness (MS 744) = 8 cm, Ashburton (MS 744) = 13 cm, broken stone (CBR 100) = 20 cm, Sirtu (CBR 50) = 10 cm and CBR subgrade 5%. Pertambahan volume lalu lintas akan menyebabkan penurunan layanan diakibatkan menurunnya kapasitas jalan karena adanya peningkatan hambatan samping maupun karena beratambahnya volume lalu lintas itu sendiri yang pada akhirnya akan meyebabkan tingkat kejenuhan jalan meningkat. Keadaan tersebut terjadi ruas jalan Umasukaer Kabupaten Malaka, oleh karena itu perlu adanya penanganan perbaikan kualitas jalan agar memenuhi segi kelayakan sarana transportasi dengan memperhatikan syarat-syarat teknik yang ada. Hasil perencanaan didapatkan bahwa melalui data survey LHR tahun 2015 dengan prediksi peningkatan kepadatan lalu lintas sebesar 6% pertahun maka didapatkan LHR dengan umur rencana 7 tahun = 2540,7 kend/hr/jurusan dan LHR umur rencana 20 tahun = 5419,1 ked/hr/jurusan. Hasil studi perencanaan perkerasan konstruksi bertahap dapat diambil kesimpulan bahwa model perencaaan yang telah dirancang efektif dalam memperkerasa konstruksi jalan sesuai dengan syarat teknis yang ada serta efisien dalam hal pembiayaan. Hasil akhir tebal perkerasan konstruksi bertahap diperoleh hasil: Ketebalan Asbuton (MS 744) = 8 cm, Asbuton (MS 744) = 13 cm, batu pecah (CBR 100) = 20 cm, Sirtu (CBR 50) = 10 cm dan CBR tanah dasar 5%.


Sign in / Sign up

Export Citation Format

Share Document