Compulsory Land Acquisition and Compensation in Botswana: The Case of Pitsane-Tlhareseleele Road Project.

2018 ◽  
Author(s):  
N. Lekgori ◽  
P. Paradza
2020 ◽  
Vol 25 (2) ◽  
pp. 191
Author(s):  
Ovie Lativatul Khofiyah ◽  
Ida Ayu Ari Angreni

Land acquisition for Cinere-Jagorawi toll road section II B should be completed in 2010, but till now (status 15 June 2017) from the need of 17.6 HA, only 16,1353 HA or 91,677% are free. Progress of land acquisition resulted in progress deviation of construction. This study aims to analyze the effect of land acquisition which is resulted in the performance of Cinere-Jagorawi toll road project of section II B late. Data was collected by spreading questionnaires related to the stages and technical implementation of land acquisition, internal factors and external factors inhibiting land acquisition to respondents from Ministry of PUPR, BPN Depok, and community. The result of analysis using regression analysis obtained X15, X17, and X33 as the best variable. The conclusion is, X15 (Funding for public procurement is sourced from the State Budget) with a coefficient of 0.34 as the first influential factor, X17 (Data collection of land status and its document) with the coefficient of 0.257 as the second influential factor, and X33 (Limitations of time for BPN in handling land procurement due to the amount of land to be acquired) with the coefficient of 0.146 as the third influential factor.


2019 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Ajit Kumar Sinha ◽  
Kumar Neeraj Jha

Purpose The purpose of this paper is to identify the problems faced by banks, lenders, financial institutions, public authority, developers and concessionaires in course of financing of public‒private partnership (PPP) road projects. Subsequently, the reasons that contribute to these problems were analyzed to come up with recommendations for mitigation of these problems. Design/methodology/approach The methodology adopted is based on identification of financing problems and the reasons thereof, from a systematic and critical review of literature. Financing details including problems faced and reasons behind were extracted from details of one port, one airport and one road project. Data pertaining to financing of PPP road projects have been collected for completed (five projects) as well as projects under implementation (five projects) during a time interval of four months, starting from December 2018 to March 2019. The chosen three projects for case studies were executed in airport project at Kolkata in four years, offshore container terminal at Mumbai port in six years and Tuni Ankapali road project in three years. This period attains importance, as simultaneous progressive development and innovation in the PPP mode of project execution was taking place rapidly. Findings The commercial banks in India dominate in providing debt to the PPP infrastructure projects, especially in the road sector. The non-banking financial companies and other intermediaries were still in their infancy then, and a corporate bond market was growing steadily, though slowly. Financing problems faced by the developers resulted in unwarranted time and cost overruns emanating from delay in land acquisition and grant of approvals, with these being the two major barriers to private sector participation. Even schedule overrun finally resulted in increased construction and financing cost. Originality/value Demand for upgradation, building and expansion of transportation infrastructure (roads) exists to keep pace with economic development. Problems like lack of a developed market for financing, inadequate institutional capacity, lack of personnel having domain expertise and absence of exclusive legislation to govern the implementation of PPP road projects are encountered by the sponsors and developers. Delay in land acquisition and environment clearance inhibits any decisive action by the lenders and investors, as these two are integrally linked to the decisions to be taken with respect to the financing of projects. Investors and bankers are generally apprehensive of their investment getting locked in or ending up as non-performing assets. Identification and proposed mitigation of these problems may likely smoothen the rough edges for the financing of projects, resulting in smoother implementation.


2019 ◽  
Vol 18 (1) ◽  
pp. 133-158
Author(s):  
Do Hyun Ju ◽  
Jaewoong Won ◽  
Jae Su Lee ◽  
Jae Bum Jun ◽  
Myeong Hwan Cho
Keyword(s):  

Author(s):  
أ.د.حميد شهاب احمد ◽  
م.م.زيدون سلمان محمد

China's economic policy and its huge capabilities operate according to an expansion strategy, especially in investing foreign projects, as the past ten years have witnessed a major development in the elements of comprehensive strength, especially in the economic field, in 2014 China launched the largest initiative in the world, represented by the Belt and Road Project (BRI), which links nearly 70 countries, through this project, a very important region has emerged, which is (the port of cadres) in Pakistan, as China has headed towards that region and given the highest importance that is in its interest in the first place regardless of the great Pakistani interest, This is consistent with its future aspirations, especially after breaking the economic monopoly of the West, specifically (the United States), as it is a force in a state of decline and is no longer the dominant force economically. Which, in turn, led to the generation of an obsession with fear of this power and what it poses from a potential threat to the entire global economy, and what it seeks in the future to employ cadres not only to develop its economy and compete with other countries commercially , rather it takes another place aimed at increasing the Chinese military presence in the region, especially as China continues to work to develop everything available to its pioneering path in the international system in order to distinguish China as a major country and perhaps a superpower.


Author(s):  
Yogi Maron ◽  
Ismansyah Ismansyah ◽  
Azmi Fendri

<p align="center"> </p><p><em>As happened to the Notary Eli SatriaPilo, S.H, Mkn, who was appointed as the Notary who made the Deed of Relinquishment of Land Rights in the Land Acquisition activities for the Construction of Campus III of the State Islamic Institute (IAIN) of Padang which was located in Sungai Bangek District, Padang</em><em> </em><em>in 2010. The method used was descriptive, in which describing the applicable legislation associated with legal theory in the facts and realities about the Notary’s Responsibility in Making Deed of Land Acquisition for the construction of Campus III of IAIN Padang in Sungai</em><em> </em><em>Bangek. This study used a Normative Juridical approach, in which researching by using and processing secondary data or literature related to the</em><em> </em><em>study. The data collected were in the form of primary data obtained from the District Court of Padang, secondary data obtained from secondary legal materials and primary legal materials. Based on the study, it was found that the role of Notary Eli</em><em> </em><em>Satria</em><em> </em><em>Pilo, in the land acquisition of campus III IAIN was proven to have misused the authority resulting in violation of the Notary Ethics Code and was responsible for accepting termination disrespectfully. Furthermore, he was also shown to be committing a Criminal Corruption made based on the Deed of Relinquishment of Land Rights in the land acquisition for the construction of Campus III of IAIN Padang, so that the State incurred losses of Rp. 1</em><em>.</em><em>946</em><em>.</em><em>701</em><em>.</em><em>050 (one billion nine hundred forty-six million seven hundred one thousand and fifty rupiahs). And he was responsible for receiving and carrying out the sentence that had been handed down by the District Court of Padang, a prison sentence of 4 (four) years, and paying a fine of Rp. 200</em><em>.</em><em>000</em><em>.</em><em>000 (two hundred million rupiahs)</em><em>.</em></p><p> </p>


2020 ◽  
Vol 6 (1) ◽  
Author(s):  
Priyo Katon Prasetyo ◽  
Rosye Villanova Christine ◽  
Sudibyanung Sudibyanung

Abstract: Based on Law Number 2 of 2012 concerning Land Acquisition for Development in the Public Interest, the Openness Principle is one of the ten principles as the basis of the implementation of development. This principle is significant because its complex role can lead to conflicts and disputes. In this paper, discussions are divided into two parts: 1) how the implementation is expected to be applied according to the acquisition procedure in theory; and 2) the reality that occurs in the field. The first discussion was conducted by reviewing the applicable regulations and the methods or concepts of development of the openness principle. Meanwhile, the second discussion about the reality on the field was conducted by elaborating case studies regarding problems in land acquisition. The results of this study indicate that there are gaps in the implementation of the openness principle between theory and reality in regards of land scarcity, economic inequality, and information asymmetry among the involved parties. In conclusion, the implementation of the openness principle is significant with the role of information in land acquisition.Intisari: Berdasarkan Undang Undang Nomor 2 Tahun 2012 tentang Pengadaan Tanah Bagi Pembangunan Untuk Kepentingan Umum, Asas Keterbukaan adalah salah satu dari sepuluh asas yang menjadi dasar pelaksanaannya. Asas ini menjadi signifikan karena perannya yang kompleks dapat menimbulkan konflik dan sengketa. Artikel ini akan membagi pembahasan menjadi dua bagian: pertama, bagaimana implementasi yang seharusnya diterapkan pada prosedur pengadaan secara harapan, dan kedua, membahas mengenai realita yang terjadi di lapangan. Secara harapan pembahasan dilakukan dengan melakukan library research atau studi terhadap peraturan yang berlaku dan metode-metode atau prinsip perkembangan dari asas keterbukaan. Realitas di lapangan akan dielaborasi dari studi kasus mengenai permasalahan dalam pengadaan tanah. Hasil dari penelitian ini menunjukkan ada gap dalam implementasi asas keterbukaan antara harapan dan realitas di lapangan yang bersumber dari kelangkaan sumber daya/tanah, ketimpangan ekonomi dan asimetri informasi di antara para pihak yang terlibat. Tulisan ini menyimpulkan bahwa implementasi asas keterbukaan signifikan dengan peran informasi dalam pengadaan tanah. 