scholarly journals Theoretical Analysis of Sodium Removal from Fast Flux Test Facility Fuel Subassemblies

Author(s):  
R. R. Borisch
1986 ◽  
Vol 30 (9) ◽  
pp. 885-889 ◽  
Author(s):  
Paul M. Lewis ◽  
Dan J. Swaim

In April 1985, the operating crews at the Fast Flux Test Facility near Richland, Washington, changed their rotating shift schedule from an 8- to a 12-hour/day work schedule. The primary purpose of the change was to reduce the attrition of operators by increasing their job satisfaction. Eighty-four percent of the operators favored the change. A program was established to evaluate the effects on plant performance, operator alertness, attrition, sleep, health, job satisfaction, and off- the-job satisfaction. Preliminary results from that evaluation program indicate that the 12-hour shift schedule is a reasonable alternative to an 8-hour schedule at this facility.


1988 ◽  
Vol 110 (4) ◽  
pp. 450-455 ◽  
Author(s):  
A. Fourmaux ◽  
R. Gaillard ◽  
G. Losfeld ◽  
G. Meauze´

This paper presents the ONERA contribution in a joint experimental program on the aerodynamics of supersonic airfoil cascades. The first part deals with the specific ONERA way of running cascade tests: description of the test facility, the test model, the instrumentation, and data reduction. Then, after a brief theoretical analysis of the ARL 19 cascade, some experimental results are presented and discussed.


Sign in / Sign up

Export Citation Format

Share Document