Performance of an Internally Braced Slurry-Diaphragm Wall for Excavation Support

Author(s):  
NA Bono ◽  
TK Liu ◽  
C Soydemir
Complexity ◽  
2020 ◽  
Vol 2020 ◽  
pp. 1-11
Author(s):  
Linlong Mu ◽  
Jianhong Lin ◽  
Zhenhao Shi ◽  
Xingyu Kang

Potential damages to existing tunnels represent a major concern for constructing deep excavations in urban areas. The uncertainty of subsurface conditions and the nonlinear interactions between multiple agents (e.g., soils, excavation support structures, and tunnel structures) make the prediction of the response of tunnel induced by adjacent excavations a rather difficult and complex task. This paper proposes an initiative to solve this problem by using process-based modelling, where information generated from the interaction processes between soils, structures, and excavation activities is utilized to gradually reduce uncertainty related to soil properties and to learn the interaction patterns through machine learning techniques. To illustrate such a concept, this paper presents a simple process-based model consisting of artificial neural network (ANN) module, inverse modelling module, and mechanistic module. The ANN module is trained to learn and recognize the patterns of the complex interactions between excavation deformations, its geometries and support structures, and soil properties. The inverse modelling module enables a gradual reduction of uncertainty associated with soil characterizations by accumulating field observations during the construction processes. Based on the inputs provided by the former two modules, the mechanistic module computes the response of tunnel. The effectiveness of the proposed process-based model is evaluated against high-fidelity numerical simulations and field measurements. These evaluations suggest that the strategy of combining artificial intelligence techniques with information generated during interaction processes can represent a promising approach to solve complex engineering problems in conventional industries.


2015 ◽  
Vol 777 ◽  
pp. 8-12 ◽  
Author(s):  
Lin Zhen Cai ◽  
Cheng Liang Zhang

HuJiaDi tunnel construction of Dai Gong highway is troublesome, the surrounding-rock mass give priority to full to strong weathering basalt, surrounding rock integrity is poor, weak self-stability of surrounding rock, and tunnel is prone to collapse. In order to reduce disturbance, taking advantage of the ability of rock mass, excavation adopt the method of "more steps, short footage and strong support". The excavation method using three steps excavation, The excavation footage is about 1.2 ~ 1.5 m; The surrounding rock bolting system still produce a large deformation after completion of the first support construction, it shows that the adopted support intensity cannot guarantee the stability of the tunnel engineering. Using ABAQUS to simulate tunnel excavation support, optimizing the support parameters of the tunnel, conducting comparative analysis with Monitoring and Measuring and numerical simulation results, it shows that the displacement - time curves have a certain consistency in numerical simulation of ABAQUS and Monitoring and Measuring.


2012 ◽  
Vol 34 (4) ◽  
pp. 3-16 ◽  
Author(s):  
Karolina Gorska ◽  
Marek Wyjadłowski

Abstract The article presents back analysis to estimate geotechnical parameters of fill layer. The agreement between field measurements and theoretical calculations was examined. Displacements of a cantilever CFA bored pile wall were monitored. The inclinometric measurements were taken directly after pile construction and according to excavation process. Over 200 calculation series were performed, with changing fill parameters. The calculations employed the actual geometric and material parameters of the pile wall, as well as geotechnical parameters of layered soil. The parameters estimated through back analysis were the angle of internal friction and Young’s modulus of fill layer. In the case discussed, pile wall cap displacement was the response of the system, and soil medium parameters were the input data. The agreement between theoretical calculations and inclinometer measurements was assessed in accordance with two functions. The measured horizontal displacements of excavation support structure assumed different values at the two inclinometer sites analysed. Back analysis results for these sites are approximately convergent for a final excavation depth.