Determination of selected impurities in primary circuit waters during normal operation of nuclear power plants Oznaczanie wybranych zanieczyszczeń obecnych w wodach obiegu pierwotnego podczas normalnej eksploatacji elektrowni jądrowej

2016 ◽  
Vol 1 (5) ◽  
pp. 60-63
Author(s):  
Ewelina Chajduk
Author(s):  
Michel Bie`th

Decisions regarding the verification of design plant lifetime and potential license renewal periods involve a determination of the component and circuit condition. In Service Inspection of key reactor components becomes a crucial consideration for continued safe plant operation. The determination of the equipment properties by Non Destructive Techniques during periodic intervals is an important aspect of the assessment of fitness-for-service and safe operation of nuclear power plants The Tacis and Phare were established since 1991 by the European Union as support mechanisms through which projects could be identified and addressed satisfactorily. In Nuclear Safety, the countries mainly concerned are Russia, Ukraine, Armenia, and Kazakhstan for the Tacis programme, and Bulgaria, Czech Republic, Hungary, Slovak Republic, Lithuania, Romania and Slovenia for the Phare programme. The Tacis and Phare programs concerning the Nuclear Power Plants consist of: • On Site Assistance and Operational Safety, • Design Safety, • Regulatory Authorities, • Waste management, and are focused on reactor safety issues, contributing to the improvement in the safety of East European reactors and providing technology and safety culture transfer. The main parts of these programmes are related to the On-Site Assistance and to the Design Safety of VVVER and RBMK Nuclear power plants where Non Destructive Techniques for In Service Inspection of the primary circuit components are addressed.


ANRI ◽  
2020 ◽  
pp. 31-44
Author(s):  
Aleksey Ekidin ◽  
Aleksey Vasil'ev ◽  
Maksim Vasyanovich ◽  
Evgeniy Nazarov ◽  
Mariya Pyshkina ◽  
...  

The article presents the results of field studies in the area of the Belarusian NPP in the pre-operational period. The «background» contents of gamma-emitting radionuclides in individual components of the environment are determined. The main array of dose rate measurements in the area of the NPP construction site is in the range 0.048 ÷ 0.089 μSv/h. External radiation in the surveyed area is formed at 96% due to 40K, 226Ra and 232Th. The information obtained can be used to correctly interpret the data of future radiation monitoring during normal operation of nuclear power plants.


Environments ◽  
2019 ◽  
Vol 6 (11) ◽  
pp. 120
Author(s):  
Luca Albertone ◽  
Massimo Altavilla ◽  
Manuela Marga ◽  
Laura Porzio ◽  
Giuseppe Tozzi ◽  
...  

Arpa Piemonte has been carrying out, for a long time, controls on clearable materials from nuclear power plants to verify compliance with clearance levels set by ISIN (Ispettorato Nazionale per la Sicurezza Nucleare e la Radioprotezione - National Inspectorate for Nuclear Safety and Radiation Protection) in the technical prescriptions attached to the Ministerial Decree decommissioning authorization or into category A source authorization (higher level of associated risk, according to the categorization defined in the Italian Legislative Decree No. 230/95). After the experience undertaken at the “FN” (Fabbricazioni Nucleari) Bosco Marengo nuclear installation, some controls have been conducted at the Trino nuclear power plant “E. Fermi,” “LivaNova” nuclear installation based in Saluggia, and “EUREX” (Enriched Uranium Extraction) nuclear installation, also based in Saluggia, according to modalities that envisage, as a final control, the determination of γ-emitting radionuclides through in situ gamma spectrometry measurements. Clearance levels’ compliance verification should be performed for all radionuclides potentially present, including those that are not easily measurable (DTM, Difficult To Measure). It is therefore necessary to carry out upstream, based on a representative number of samples, those radionuclides’ determination in order to estimate scaling factors (SF), defined through the logarithmic average of the ratios between the i-th DTM radionuclide concentration and the related key nuclide. Specific radiochemistry is used for defining DTMs’ concentrations, such as Fe-55, Ni-59, Ni-63, Sr-90, Pu-238, and Pu-239/Pu-240. As a key nuclide, Co-60 was chosen for the activation products (Fe-55, Ni-59, Ni-63) and Cs-137 for fission products (Sr-90) and plutonium (Pu- 238, Pu-239/Pu-240, and Pu-241). The presence of very low radioactivity concentrations, often below the detection limits, can make it difficult to determine the related scaling factors. In this work, the results obtained and measurements’ acceptability criteria are presented, defined with ISIN, that can be used for confirming or excluding a radionuclide presence in the process of verifying clearance levels’ compliance. They are also exposed to evaluations regarding samples’ representativeness chosen for scaling factors’ assessment.


1979 ◽  
Vol 101 (1) ◽  
pp. 130-140 ◽  
Author(s):  
Z. P. Tilliette ◽  
B. Pierre ◽  
P. F. Jude

The advantages of gas turbine power plants in general and closed cycle systems under gas pressure in particular for waste heat recovery are well known. A satisfactory efficiency for electric power generation and good conditions to obtain a significant amount of hot water above 100°C lead to a high fuel utilization. However, as in most of projects, it is not much possible to produce high temperature steam or water without significantly decreasing the electricity production. A new method for an additional generation of high quality process or domestic heat is proposed. The basic feature of this method lies in arranging one or two steam generators or preheaters in parallel with the low pressure side of the recuperator. The high total efficiency and the noteworthy flexibility of this system are emphasized. This arrangement is suitable for any kind of heat source, but the applications presented in this paper are related to helium direct cycle nuclear power plants the main features of which are a single 600 MW(e) turbomachine, a turbine inlet temperature of 775°C, no or one intermediate cooling and a primary circuit fully integrated in a pre-stressed concrete reactor vessel.


2019 ◽  
Vol 61 (3) ◽  
pp. 352-364 ◽  
Author(s):  
A. A. Ekidin ◽  
K. L. Antonov ◽  
M. E. Vasyanovich ◽  
I. A. Kapustin ◽  
I. Yu. Filatov

2014 ◽  
Vol 302 (1) ◽  
pp. 41-47 ◽  
Author(s):  
T. C. Oliveira ◽  
R. P. G. Monteiro ◽  
G. F. Kastner ◽  
F. Bessueille-Barbier ◽  
A. H. Oliveira

Sign in / Sign up

Export Citation Format

Share Document