Assessment and prioritisation of project risk in the oil and gas industry using fuzzy TOPSIS method
2016 ◽
Vol 6
(4)
◽
pp. 363
Keyword(s):
2016 ◽
Vol 6
(4)
◽
pp. 363
Keyword(s):
Keyword(s):
2020 ◽
2020 ◽
2020 ◽
Vol 15
(2)
◽
pp. 171
Keyword(s):
2013 ◽
Vol 2
(4)
◽
pp. 79-101