scholarly journals THE RECONSTRUCTION OF ON-SHORE PUMPING STATION COMBINED WITH A WATER INLET WITHOUT A STOP OF WORK OF CHELYABINSK METALLURGICAL PLANT

Author(s):  
I Arkanova ◽  
◽  
A Noskov ◽  

The plan of reconstruction of an on-shore pumping station combined with a water inlet of Chelyabinsk Metallurgical Plant (CMP) is developed. The authors give characteristics of the quality and amount of water, needed for the main production of CMP. The inspection of the on-shore pumping station combined with the water inlet of CMP is carried out. The need for reconstruction for reliability control and compliance with modern requirements of water intake of an industrial enterprise, which in turn is connected with the expansion of production at CMP is proven. The basic equipment is specified. It leads to the enlargement of the pumping station itself.

Author(s):  
V. F. Bezjazychnyi ◽  
E. V. Kiselev ◽  
V. A. Troshkin

Improvement of modern management systems for industrial enterprises involves the active use of risk management methods that are accompanied by their activities. Issues of production risks and their place in the General enterprise management system are discussed in the article. There is a classification of the main production risks and possible risk management methods applicable in the activities of an industrial enterprise.


Metallurgist ◽  
1981 ◽  
Vol 25 (5) ◽  
pp. 179-181
Author(s):  
A. L. Daiker ◽  
A. I. Veis ◽  
V. N. Pal'ko ◽  
A. D. Bogatyrev ◽  
G. Ya. Morozov ◽  
...  

2020 ◽  
Vol 63 (1) ◽  
pp. 71-77
Author(s):  
K. O. Vinogradov ◽  
A. L. Smyslova

During the study of technological data of the process of liquid iron transportation, it was found that the number of locomotives and mixers depending on the duration of operations and especially on the inter-operational downtime does not always ensure normal rhythm of the main production. It leads to significant production losses, therefore, the work of the producing and transport complex is not effective enough. The authors have developed a simulation model of a logistics system for transporting liquid iron at a metallurgical plant. The study and construction of the model was performed using AnyLogic. Real data from production, namely the schedule of blast furnace smelting for a three-week period, was used as the initial data. To prove adequacy of the model, the results were compared with the actual tact of the mixers movement, as well as with the theoretical need of the converter shop. Values of the liquid iron weight delivered to the converter shop were obtained during the simulation and were related to the theoretical ones. Efficiency of the model is achieved by automatically collecting in real time of statistical values of the parameters of simulation objects. The system analyzes the collected data and makes decisions based on them for a short period of time (less than one second). In default operation mode of the simulation model, motion of the mixers is controlled automatically without participation of the dispatcher, which improves efficiency, as well as decision-making speed. Such model provides simulation of failures in operation of the converter shop. According to the simulation results, it can be concluded that the system delivers less liquid iron to a converter shop, but retains its rhythm. After resuming the operation of all converters, the tact of transportation reaches the required level.