Evaluation of a Farmstead Drinking Water Quality Decision Support System

1994 ◽  
Vol 10 (6) ◽  
pp. 863-869
Author(s):  
K. M. Embleton ◽  
B. A. Engel ◽  
D. D. Jones
2020 ◽  
Vol 81 (8) ◽  
pp. 1778-1785 ◽  
Author(s):  
Lluís Godo-Pla ◽  
Pere Emiliano ◽  
Santiago González ◽  
Manel Poch ◽  
Fernando Valero ◽  
...  

Abstract Drinking water treatment plants (DWTPs) face changes in raw water quality, and treatment needs to be adjusted to produce the best water quality at the minimum environmental cost. An environmental decision support system (EDSS) was developed for aiding DWTP operators in choosing the adequate permanganate dosing rate in the pre-oxidation step. To this end, multiple linear regression (MLR) and multi-layer perceptron (MLP) models are compared for choosing the best predictive model. Besides, a case-based reasoning (CBR) model was approached to provide the user with a distribution of solutions given similar operating conditions in the past. The predictive model consisted of an MLP and has been validated against historical data with sufficient good accuracy for the utility needs (R2 = 0.76 and RSE = 0.13 mg·L−1). The integration of the predictive and the CBR models in an EDSS gives the user an augmented decision-making capacity of the process and has great potential for both assisting experienced users and for training new personnel in deciding the operational set-point of the process.


2009 ◽  
Vol 60 (8) ◽  
pp. 2077-2084 ◽  
Author(s):  
G. Stuart ◽  
A. Hollingsworth ◽  
F. Thomsen ◽  
S. Szylkarski ◽  
S. Khan ◽  
...  

Gold Coast Water is responsible for the management of the water, recycled water and wastewater assets of the City of the Gold Coast on Australia's east coast. Excess treated recycled water is released at the Gold Coast Seaway, a man-made channel connecting the Broadwater Estuary with the Pacific Ocean, on an outgoing tide in order for the recycled water to be dispersed before the tide changes and re-enters the Broadwater estuary. Rapid population growth has placed increasing demands on the city's recycled water release system and an investigation of the capacity of the Broadwater to assimilate a greater volume of recycled water over a longer release period was undertaken in 2007. As an outcome, Gold Coast Water was granted an extension of the existing release licence from 10.5 hours per day to 13.3 hours per day from the Coombabah wastewater treatment plant (WWTP). The Seaway SmartRelease Project has been designed to optimise the release of the recycled water from the Coombabah WWTP in order to minimise the impact to the receiving estuarine water quality and maximise the cost efficiency of pumping. In order achieve this; an optimisation study that involves intensive hydrodynamic and water quality monitoring, numerical modelling and a web-based decision support system is underway. An intensive monitoring campaign provided information on water levels, currents, winds, waves, nutrients and bacterial levels within the Broadwater. This data was then used to calibrate and verify numerical models using the MIKE by DHI suite of software. The Decision Support System will then collect continually measured data such as water levels, interact with the WWTP SCADA system, run the numerical models and provide the optimal time window to release the required amount of recycled water from the WWTP within the licence specifications.


Sign in / Sign up

Export Citation Format

Share Document