The EPA defines a small municipal waste combustor (MWC) Class II facility as having an aggregate plant capacity of 250 tons per day (TPD) or less. Some commercial Waste-to-Energy (WTE) operators consider that there is an economy of scale required that is much greater. So what about small facilities? Can public entities or private companies make the economics work? This paper will offer a status of existing small facilities, available combustion technologies and identify known planned expansions or new facilities. The paper will feature one such facility with an interesting past and a bright future including plans for expansion: the Perham Resource Recovery Facility in Perham, Minnesota. This cogeneration facility plans to increase its capacity from 112 TPD to 200 TPD along with adding upfront processing to improve fuel quality.


Author(s):  
Ramana K. Rao ◽  
Brian L. Stormwind ◽  
Ishrat Chaudhuri ◽  
Marcus Garcia

Following a 1986 decision by Montgomery County in Maryland to construct a municipal waste resource recovery facility near the town of Dickerson, the local community expressed concern regarding the potential human health effects from air emissions of dioxins and trace metals released through the stack of the proposed facility. To address this concern, the County conducted health risk studies and ambient monitoring programs before and after the facility became operational. The purpose of the health risk studies was to determine potential cancer and non-cancer risks to the nearby residents from the operations of the facility. The purpose of the ambient monitoring programs was to determine if any changes would occur in the ambient levels of certain target chemicals in the environmental media, and if such changes can be attributed to the operations of the facility. Accordingly, the County conducted a multiple pathway health risk assessment in 1989 prior to the construction of the facility. The pre-operational health risk assessment was based on estimated stack engineering parameters and available stack emissions data from municipal waste resource recovery facilities that were operating in the United States, Canada and Europe during the 1980’s. The health risk assessment used established procedures that were accepted by the U.S. Environmental Protection Agency (U.S. EPA) and many state agencies at that time. The Montgomery County Resource Recovery Facility (RRF) became operational in the spring of 1995. The facility is equipped with the state-of-the-art air pollution control (APC) equipment including a dry scrubber-fabric filter baghouse system to control organics and trace metals, ammonia injection system to control nitrogen oxides, and activated carbon injection system to control mercury. In 2003, the County retained ENSR International to update the 1989 health risk assessment study. In the 2003 operational-phase update, as-built engineering data and measured stack emissions data from a total of eighteen quarterly stack emissions tests were used. The study was conducted in accordance with the U.S. EPA’s Human Health Risk Assessment Protocol for Hazardous Waste Combustion Facilities published in 1998 [1], and an Errata, published in 1999 [2]. Both the 1989 study and the 2003 study demonstrated that there is a very low chance (less than one chance in a million) for occurrence of cancer and no adverse non-cancer health effects to the nearby community as a result of exposure to facility-related emissions. The multi-media ambient monitoring programs were conducted in abiotic and biotic environmental media. These programs included an air-monitoring component and a non-air monitoring component. The pre-operational phase of the air media and non-air media monitoring was conducted in 1994–1995. The pre-operational program was designed to produce baseline data for target chemicals in both air and non-air media. The operational-phase air media monitoring was conducted in 1997 and 2003. The operational-phase non-air media monitoring was conducted in 1997 and 2001. Target chemicals monitored in both air and non-air media included polychlorinated dioxins and furans (PCDDs/PCDFs) and selected toxic metals (arsenic, beryllium, cadmium, chromium, lead, mercury, and nickel). The non-air media included crops, farm pond surface water and fish tissue, and cow’s milk. The ambient levels of target chemicals monitored in the operational phase of the facility (1997, 2001 and 2003) demonstrated no measurable difference from the ambient levels of these chemicals monitored in the pre-operational phase (1994–95) of the facility, in both the air media and non-air media. The results of the health risk studies and ambient monitoring programs demonstrate that municipal waste combustion facilities that are equipped with the state-of-the-art air pollution control equipment pose no significant health risk to the population.


Author(s):  
Virbala Sharma ◽  
Anand Giri ◽  
Shabnam Thakur ◽  
Deepak Pant

Author(s):  
L. L. Sutter ◽  
G. R. Dewey ◽  
J. F. Sandell

Municipal waste combustion typically involves both energy recovery as well as volume reduction of municipal solid waste prior to landfilling. However, due to environmental concerns, municipal waste combustion (MWC) has not been a widely accepted practice. A primary concern is the leaching behavior of MWC ash when it is stored in a landfill. The ash consists of a finely divided fly ash fraction (10% by volume) and a coarser bottom ash (90% by volume). Typically, MWC fly ash fails tests used to evaluate leaching behavior due to high amounts of soluble lead and cadmium species. The focus of this study was to identify specific lead bearing phases in MWC fly ash. Detailed information regarding lead speciation is necessary to completely understand the leaching behavior of MWC ash.