Mine Facility Location Selection in open-pit mines using a new multistep-procedure

Author(s):  
G. N. Shapovalenko ◽  
S. N. Radionov ◽  
V. V. Gorbunov ◽  
V. A. Khazhiev ◽  
V. Yu. Zalyadnov ◽  
...  

Chernogosky open pit mine integrates truck-and-shovel system of mining with overburden rehandling to internal dump with a set of walking excavators for rehandling of overburden to mined-out area of the pit. It is possible to improve efficiency of stripping in the conditions of Chernogorsky OPM by reducing percentage of stripping with more expensive handling system. The relevant research and solutions to this effect are presented in this article. Comparative characterization of mining conditions and parameters of mining systems applied is given for open pit mines Chernogorsky, Turnui, Nazarovsky, Vostochno-Beisky and Izykh. The comparative analysis points at the need to account for difficulty of mining and process sites in comparison of equipment productivity. High concentration of mining machines, which is conditioned by narrow mining front and simultaneous operation of five faces, as well as blasting operation implemented every 1-2 days, are recognized as the main constraints of excavator capacity in mining with direct dumping in Chernogorsky open pit mine. The management and engineering solutions implemented in the mine and resulted in higher efficiency of draglines are described.


2018 ◽  
Vol 5 ◽  
pp. 59-64
Author(s):  
P.A. Prokhorov ◽  
◽  
Val.V. Sencus ◽  
A.L. Mansurov ◽  
◽  
...  

2019 ◽  
Vol 4 ◽  
pp. 152-160
Author(s):  
L.I. Kantovich ◽  
◽  
O.I. Litvin ◽  
A.A. Khoreshok ◽  
E.A. Tyuleneva ◽  
...  

2021 ◽  
Vol 13 ◽  
pp. 184797902110308
Author(s):  
Md Nazmul Hasan Suman ◽  
Nagib MD Sarfaraj ◽  
Fuad Ahmed Chyon ◽  
Md Rafiul Islsm Fahim

The furniture industry is growing to a great extent in Bangladesh. Many market researchers believe that the industry has enormous potentiality. However, the expansion of this industry may face complexities within a few years. Due to the wrong selection of facilities, many organizations failed to earn profit as expected. It also needs a large investment. Selecting a suitable place for a new facility is going to be the biggest question of upcoming years. This study aimed to analyze Bangladesh’s furniture industry, address the facility location problem, and provide a constructive solution to the decision-makers. In this study, seven criteria were considered: availability of raw materials, transportations, skilled labor, proximity to customers, energy availability, economic zone facility, and environmental impact, and five ideal locations or alternatives: Khulna, Chattogram, Bogura, Gazipur, and Manikganj. Thirty-four experts took part in the survey to analyze the significant criteria for selecting a furniture industry’s facility location and alternatives or potential locations for the facility. The Analytical Hierarchy Process (AHP) and Fuzzy AHP methods (FAHP), two MCDM techniques, were used to analyze the data set. A sensitivity analysis was done to determine the model’s robustness for any critical changes in the real world. The result showed that ‘energy availability is the most significant criterion to select a facility location for the furniture industry, where it got 35.1% criteria weight in AHP and 33.9% in FAHP. ‘Chattogram’ was selected as the most suitable place containing 33.74% normalized weight in AHP and 33.81% normalized weight in FAHP.


2021 ◽  
Vol 13 (12) ◽  
pp. 6971
Author(s):  
Mikhail Zarubin ◽  
Larissa Statsenko ◽  
Pavel Spiridonov ◽  
Venera Zarubina ◽  
Noune Melkoumian ◽  
...  

This research article presents a software module for the environmental impact assessment (EIA) of open pit mines. The EIA software module has been developed based on the comprehensive examination of both country-specific (namely, Kazakhstan) and current international regulatory frameworks, legislation and EIA methodologies. EIA frameworks and methods have been critically evaluated, and mathematical models have been developed and implemented in the GIS software module ‘3D Quarry’. The proposed methodology and software module allows for optimised EIA calculations of open pit mines, aiming to minimise the negative impacts on the environment. The study presents an original methodology laid out as a basis for a software module for environmental impact assessment on atmosphere, water basins, soil and subsoil, tailored to the context of mining operations in Kazakhstan. The proposed software module offers an alternative to commercial off-the-shelf software packages currently used in the mining industry and is suitable for small mining operators in post-Soviet countries. It is anticipated that applications of the proposed software module will enable the transition to sustainable development in the Kazakh mining industry.


2019 ◽  
Vol 18 (1) ◽  
pp. 25-30
Author(s):  
Adila Nurić ◽  
Samir Nurić