Despite an international consensus for housing to be “built back better” (BBB) following disasters, and the considerable resources expended on reconstruction efforts globally, the management of post-disaster housing reconstruction programmes often leaves much to be desired. This research presents a framework for the management of post-disaster housing reconstruction in developing countries based on a comprehensive identification of the issues affecting the management of reconstruction programmes and the management measures which have proved effective in mitigating these issues and achieving the desired BBB outcomes. The framework highlights the strategic importance of preparedness measures that should be taken before the next disaster strikes and the cross-cutting nature of capacity building and beneficiary community engagement measures that are essential to all stages of the post-disaster reconstruction process. The research findings are limited to developing countries, as the evidence on which they are based is almost entirely from post-disaster housing experiences in the developing world. The framework may, however, be adapted to different, specific post-disaster reconstruction contexts. This research has compiled, extended and up-dated current knowledge regarding the management of housing reconstruction programmes and it provides practical guidance for policy makers and practitioners.


2017 ◽  
Vol 1 (2) ◽  
pp. 19-29 ◽  
Author(s):  
Tetiana Kryvomaz ◽  
Dmytro Varavin

As a result of research into the state of the housing stock in Kiev and the prospects for its reconstruction, the main levels of implementation of eco-energy-efficient measures have been identified, taking into account the increasing cost / effectiveness ratio, which will include problem assessment, optimizing energy costs, eco-energy efficient housing reconstruction, application of innovative technologies. Based on the national and international experience of reconstruction and overhaul, the 6E concept is proposed, which focuses on energy efficiency, environmental safety, economy, ecology, ergonomics and aesthetics of the reconstruction process. Compliance with the basic requirements of eco-energy efficiency in the process of housing reconstruction will ensure the comfort of residents and will improve the level of environmental safety of our country. Introduction of the principles of energy efficiency in the process of reconstruction of housing stock is an integral part of Ukraine's environmental and national security, as it ensures a reduction in the negative impact on the environment and people, and also significantly reduces the waste of the construction industry.


2021 ◽  
Vol 26 (2) ◽  
pp. 183-210
Author(s):  
Nour Saleh ◽  
Adnan Enshassi ◽  
Matthias Sundermeier

Resourcing post-disaster housing reconstruction (PDHR) entails many drawbacks creating bottlenecks to reconstruction projects. Understanding these vulnerable issues is of utmost to identify the appropriate interventions to mitigate their effects. The devastating aggression in 2014 in Gaza Strip served as a typical example of resources hampers. Based on the quantitative approach, the research employed a self-administrated questionnaire survey to identify the most significant challenges hindering the resourcing for post-2014 aggression housing reconstruction. The questionnaire targeted 55 of the key people in the implementing agencies of post-2014 aggression housing reconstruction. The data collected was analysed using descriptive statistics, through frequency distribution and effect index (EI); and using inferential statistics through one sample Wilcoxon signed rank test. Findings indicated that the challenges related to political issues have the most significant effect on resourcing the PDHR. The main key challenges are: (1) Difficulties to obtain permits from the Israeli side to flow the reconstruction materials into the Gaza Strip, (2) Insufficient funds for reconstruction efforts and (3) Refusal of the international community to contact the local de facto government. This research fills the knowledge gap relating to Gaza and provides the basis for more research on resourcing problems. This research has also extended, updated and confirmed the current knowledge regarding challenges hindering the resourcing for PDHR. The results draw attention of the implementing agencies in Gaza to the factors that creating bottlenecks to resource the reconstruction projects in order to overcome them and to mitigate their negative effects.


2010 ◽  
Vol 38 (3) ◽  
pp. 247-264 ◽  
Author(s):  
Yan Chang ◽  
Suzanne Wilkinson ◽  
Regan Potangaroa ◽  
Erica Seville

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Nimasha Dilukshi Hulathdoowage ◽  
Chandanie Hadiwattage

Purpose The sluggish progression of disaster-induced housing reconstruction (DHR) in Sri Lanka provoked the assessment of drywall technologies as a mode of improving efficiency. The purpose of this paper is to investigate the applicability of drywall technologies to adopt a technical solution to DHR. Design/methodology/approach The research contextualized a mixed research design via a case-study strategy integrating semi-structured interviews, documentary reviews and observations. Two cases based on the 2016 Samasarakanda landslide were investigated. Within-case-analysis and cross-case-analysis were performed to derive conclusions. Findings Enablers for drywall technologies application are time saving, cost-saving, less water consumption and logistical easiness. Less strength of drywall technologies will not be a critical obstruction owing to the expected disaster resilience from the concrete frame and the subsequent requirement of non-load bearing walls for landslide DHR. Labor source, community acceptance, durability are potential settings of barriers. Observing model houses, researching the resistance of drywall technologies to landslide-induced vibrations and impulsive waves are some further research areas discovered. Research limitations/implications Empirical findings are centered on the 2016 Samasarakanda DHR. Practical implications Because of many issues in updating guidelines, drawings and BOQs, a protocol should be gazetted in the parliament to improve its updating flexibility allowing provisions to apply novel technologies for DHR. Originality/value Being one of the very first of this kind of research, contextually, the research is original. This study provokes insightful investigation of drywall technologies for DHR beyond its overlooked properties. This study reveals many wall construction challenges of the 2016 Samasarakanda DHR which have not yet been explored in research.