Testing and long term monitoring of a pre-cast pre-stressed concrete girder bridge
2011 ◽
Vol 33
(10)
◽
pp. 2861-2869
◽
Keyword(s):
2008 ◽
Vol 2
(2)
◽
pp. 91-98
Keyword(s):
2012 ◽
Vol 33
◽
pp. 13-37
◽
1997 ◽
Vol 103
(1)
◽
pp. 116
2021 ◽
Vol 26
(3)
◽
pp. 05020013
Keyword(s):
2007 ◽
Vol 68
(1)
◽
pp. 3
Keyword(s):
Keyword(s):