Unit Commitment and Economic Dispatch for Operations Planning of Power Systems with Significant Installed Wind Power Capacity
Keyword(s):
Keyword(s):
2013 ◽
Vol 4
(1)
◽
pp. 250-261
◽
Keyword(s):
Keyword(s):
2015 ◽
Vol 734
◽
pp. 744-747
Keyword(s):