Uncertainty and Risk in Generation Scheduling

2017 ◽  
pp. 27-52 ◽  
Author(s):  
Rabih A. Jabr
1991 ◽  
Vol 138 (1) ◽  
pp. 39 ◽  
Author(s):  
R.E. Rice ◽  
W.M. Grady ◽  
W.G. Lesso ◽  
A.H. Noyola ◽  
M.E. Connolly

Water ◽  
2019 ◽  
Vol 11 (7) ◽  
pp. 1392 ◽  
Author(s):  
Iram Parvez ◽  
JianJian Shen ◽  
Mehran Khan ◽  
Chuntian Cheng

The hydro generation scheduling problem has a unit commitment sub-problem which deals with start-up/shut-down costs related hydropower units. Hydro power is the only renewable energy source for many countries, so there is a need to find better methods which give optimal hydro scheduling. In this paper, the different optimization techniques like lagrange relaxation, augmented lagrange relaxation, mixed integer programming methods, heuristic methods like genetic algorithm, fuzzy logics, nonlinear approach, stochastic programming and dynamic programming techniques are discussed. The lagrange relaxation approach deals with constraints of pumped storage hydro plants and gives efficient results. Dynamic programming handles simple constraints and it is easily adaptable but its major drawback is curse of dimensionality. However, the mixed integer nonlinear programming, mixed integer linear programming, sequential lagrange and non-linear approach deals with network constraints and head sensitive cascaded hydropower plants. The stochastic programming, fuzzy logics and simulated annealing is helpful in satisfying the ramping rate, spinning reserve and power balance constraints. Genetic algorithm has the ability to obtain the results in a short interval. Fuzzy logic never needs a mathematical formulation but it is very complex. Future work is also suggested.


2011 ◽  
Vol 347-353 ◽  
pp. 1370-1373
Author(s):  
Jiao Zheng ◽  
Kan Yang ◽  
Ran Zhou ◽  
Yong Huai Hao ◽  
Guo Shuai Liu

The short-term joint optimal operation simulation of Three Gorges cascade hydropower system aiming at maximum power generation benefit is proposed. And a new method for optimizing cascade hydropower station based on Adaptive Genetic Algorithm (AGA) with trigonometric selective operators is presented. In this paper, the practical optimal operation in power market is described. The temporal-spatial variation of flow between cascade hydropower stations is considered, and time of use (TOU) power price is also taken into account. Moreover, a contrast between Tangent-roulette selection operator and traditional one is made. To a certain degree, the results of simulative optimal operation based on several representative hydrographs show that Tangent-roulette wheel selection operator can find a more excellent solution, because the Tangent-roulette one can overcome the fitness requirements of non-negative. The research achievements also have an important reference for the compilation of daily generation scheduling of Three Gorges cascade hydropower system in the environment of power market.


1998 ◽  
Vol 13 (3) ◽  
pp. 857-863 ◽  
Author(s):  
G. Demartini ◽  
T.R. De Simone ◽  
G.P. Granelli ◽  
M. Montagna ◽  
K. Robo

2015 ◽  
Vol 30 (4) ◽  
pp. 2100-2109 ◽  
Author(s):  
Ali Jahanbani Ardakani ◽  
Francois Bouffard

2020 ◽  
Vol 11 (1) ◽  
pp. 15-26 ◽  
Author(s):  
Mingfei Ban ◽  
Jilai Yu ◽  
Mohammad Shahidehpour ◽  
Danyang Guo ◽  
Yiyun Yao

Sign in / Sign up

Export Citation Format

Share Document