scholarly journals Formation Mechanism and the Height of the Water-Conducting Fractured Zone Induced by Middle Deep Coal Seam Mining in a Sandy Region: A Case Study from the Xiaobaodang Coal Mine

2021 ◽  
Vol 2021 ◽  
pp. 1-11
Author(s):  
Xiaoshen Xie ◽  
Enke Hou ◽  
Shuangming Wang ◽  
Xueyang Sun ◽  
Pengfei Hou ◽  
...  

The height of the water-conducting fractured zone (WCFZ) is a basic parameter related to water protection in coal mines and is also crucial for aquifer protection and mine safety. In order to accurately detect the height and shape and reveal the formation mechanism of the WCFZ, which is caused by middle-deep coal seam mining in a sandy region, the 112201 coalface at the 1# coal mine of Xiaobaodang was taken as a case study. Filed measurements including fluid leakage, borehole TV, and similar simulation were adopted to analyze the regularity of the WCFZ in this area. The detection results of field measurements showed that the maximum height of the WCFZ was 177.07 m in a borehole near the open-off cut, and the ratio of the height of the water-conducting fractured zone divided by the mining thickness was 30.53. The WCFZ acquired an inward-convergent saddle shape, which was inclined to the goaf. The saddle bridge was located at the boundary of the goaf, and the saddle ridge was located at the center of the goaf. Also, through analyzing the results of similar simulations, we found that, in the process of mining, separation cracks and the beam structure were the main forms of overburden disturbance transmitting upward and ahead of mining, respectively. The main cause of the increase in height of the WCFZ was the connection of the separation cracks and vertical cracks caused by fractures of beam structures. The development of the WCFZ was divided into five stages: incubation stage, development stage, rapidly increasing stage, slowly increasing stage, and stable stage. Moreover, the duration of each stage was related to the lithology and mining technology. This research can provide significant theoretical insights for the prediction of the WCFZ, enabling the prevention of water hazards on mine roofs and assisting with water resources protection.

Author(s):  
Wenquan Zhang ◽  
Xintao Wu ◽  
Jianli Shao ◽  
Yanghui Ren ◽  
Zaiyong Wang
Keyword(s):  

2020 ◽  
Vol 27 (34) ◽  
pp. 43163-43176
Author(s):  
Qixiong Gu ◽  
Zhen Huang ◽  
Shijie Li ◽  
Wei Zeng ◽  
Yun Wu ◽  
...  

2021 ◽  
Author(s):  
Chang Liu ◽  
Pingsong Zhang ◽  
Duoxi Yao ◽  
Yuancaho Ou ◽  
Yutong Tian

Abstract Detecting the development height of water flowing fractured zone in the roof of coal seam is of great significance for the roof safety of working face with developed sandstone and thick loose layer. This paper analyzes the influence of the induced polarization effect of electrode on the traditional single-mode parallel electrical method. In order to avoid this interference, the dual-mode parallel electrical method is applied to monitor the roof deformation and failure of a coal mine in Ordos Basin. The monitoring results show that: under the influence of mining, the change of geoelectric field of coal seam roof is dynamic, the apparent resistivity of initial mining fracture is high, the apparent resistivity of surrounding rock water filling mining fracture is low, and the apparent resistivity of fracture water flowing to goaf is high again. According to the characteristics of geoelectric field, the maximum height of water flowing fracture zone is 122 M; The average mining coal thickness of the working face is 11 m, and the fracture / mining thickness ratio is 11.1. The results of plastic zone show that the maximum height of water flowing fractured zone above the working face is 122 m, which is consistent with the test results. The vertical stress response characteristics of roof monitoring points are zonal. Under the influence of mining, the loose layer near the surface above the working face is cracked. The edge type ground fissures exist for a long time, and there are a series of geological problems such as soil erosion, ground subsidence.


2013 ◽  
Vol 295-298 ◽  
pp. 2980-2984
Author(s):  
Xiang Qian Wang ◽  
Da Fa Yin ◽  
Zhao Ning Gao ◽  
Qi Feng Zhao

Based on the geological conditions of 6# coal seam and 8# coal seam in Xieqiao Coal Mine, to determine reasonable entry layout of lower seam in multi-seam mining, alternate internal entry layout, alternate exterior entry layout and overlapping entry layout were put forward and simulated by FLAC3D. Then stress distribution and displacement characteristics of surrounding rock were analyzed in the three ways of entry layout, leading to the conclusion that alternate internal entry layout is a better choice for multi-seam mining, for which makes the entry located in stress reduce zone and reduces the influence of abutment pressure of upper coal seam mining to a certain extent,. And the mining practice of Xieqiao Coal Mine tested the results, which will offer a beneficial reference for entry layout with similar geological conditions in multi-seam mining.


2021 ◽  
Vol 2021 ◽  
pp. 1-12
Author(s):  
Lei Zhang ◽  
Lin Xu ◽  
Yong Xiao ◽  
NingBo Zhang

A coal mine in Datong is an integrated mine. At present, there is goaf in the upper and lower part of the mining coal seam. There is a lot of ponding in the goaf, which has great potential safety hazards for production. In order to find out the scope and location of ponding in goaf, the comprehensive geophysical exploration method combining transient electromagnetic method and high-density resistivity method is used to carry out the research. Firstly, the time-base, turn-off time, receiving delay, current, superposition times, and other parameters of the instrument are tested on the surface of known goaf to obtain the best instrument parameters, and the parameters are used to verify the feasibility of the research scheme; then, the transient electromagnetic method is used for large-area exploration on the surface of the mine, the suspected goaf ponding area is found through comprehensive analysis, and the high-density resistivity exploration is arranged in the suspected goaf ponding area. According to the obtained results, the scope and location of the goaf ponding area are accurately located through comprehensive analysis. The results show that there are two goaf ponding areas in the exploration area, which are located above the 8# coal seam currently mined; the range and location of goaf ponding area can be accurately obtained by using the comprehensive geophysical method of high-density electrical method and transient electromagnetic method. This method can provide reference for mine water prevention and control in Datong area and has great practical significance to ensure coal mine safety production.


Sign in / Sign up

Export Citation Format

Share Document