scholarly journals A New Multicriteria Decision-Making Method for the Selection of Sponge City Schemes with Shapley–Choquet Aggregation Operators

2021 ◽  
Vol 2021 ◽  
pp. 1-16
Author(s):  
Yuanying Chi ◽  
Guoqing Bai ◽  
Hua Dong

The construction of sponge cities is of great strategic significance to solving the urban water resource problem in the future. According to the policy guidance of sponge city construction, the evaluation index system of sponge city construction projects is constructed. In order to overcome the interference caused by the interaction between indexes, a nonadditive measure and Shapley function are combined to determine the weights of attribute indexes, and the generalized Shapley interval-valued intuitionistic uncertain linguistic Choquet averaging (GS-IVIULCA) operator is used to calculate the comprehensive evaluation value of the schemes. On this basis, a new evaluation method of sponge city construction project selection under an uncertain information environment is presented and empirically evaluated. The results show that the index weight of rainwater collection and utilization is the largest, indicating that decision makers pay more attention to the ecological and environmental benefits of this item in the sponge city construction process.

2021 ◽  
Author(s):  
xueying bao ◽  
Zhenxia He

Abstract The current bid evaluation method can no longer meet the needs of green construction of railway construction projects, so a bid evaluation method based on an improved PCA-gray variable weight clustering model is proposed. A bid evaluation index system for railway green construction projects with a hierarchical structure was constructed from three aspects: basic construction ability, business ability and green construction ability, and the index evaluation criteria were given. Considering the high dimensional complexity of the bid evaluation system, the improved PCA method was used to reduce the dimension of the bid evaluation system, and on this basis, an improved linear weighted comprehensive evaluation function was constructed to preliminarily evaluate the construction ability of bidders. Then, the grey variable weight clustering model is used to construct the definite weighted function to further analyze the green construction ability of the bidders and select the optimal bidder. Finally, the method was applied to the bid evaluation of railway engineering projects from Lanzhouxi to Zhongchuan Airport, and the conclusion is consistent with the actual bidders, which proves the applicability and effectiveness of the model.


2013 ◽  
Vol 859 ◽  
pp. 511-514 ◽  
Author(s):  
Jing Jing Wan ◽  
Ying Hua Song

This paper has put forward a comprehensive assessment model of the emergency management capability of the coal mine accidents which is based on AHP and fuzzy comprehensive evaluation, and has made an empirical analysis. Firstly, the meaning and the key contents of the emergency management capability of coal mine accidents was elaborated. Secondly, the comprehensive evaluation index system of coal mine accidents emergency management capability was established. And then, the first class index weights were determined by AHP. Finally, this paper made a comprehensive evaluation of a certain regions emergency management capability of coal mine accidents by means of the fuzzy comprehensive evaluation.


2014 ◽  
Vol 638-640 ◽  
pp. 2446-2449 ◽  
Author(s):  
Bo Liu ◽  
Ju Qin Shen ◽  
Gao Yan Xu ◽  
Liang Tang ◽  
Zi Lin Xu ◽  
...  

With the aim to improve the controlling efficiency of engineering project, this essay probes into the comprehensive evaluation of controlling efficiency of engineering project and put forward scientific comprehensive evaluation method to provide support to reasonable comprehensive evaluation of controlling efficiency of engineering project. Complete comprehensive evaluation index system of controlling efficiency of engineering project is constructed from three aspects, i.e. implementation efficiency of construction objective, external coordination efficiency and professional qualification enhancement efficiency; based on matter-element analytical method, mathematic model that could evaluate controlling efficiency of engineering project comprehensively is constructed.


Water Policy ◽  
2018 ◽  
Vol 20 (2) ◽  
pp. 410-428 ◽  
Author(s):  
Yongnan Zhu ◽  
Lei Li ◽  
Yong Zhao ◽  
Zhongmin Liang ◽  
Haihong Li ◽  
...  

Abstract We used system theory to analyze the structure of a regional drought disaster system and separated the drought disaster risk system into three subsystems. These were drought disaster-causing factors, disaster-inducing environments, and disaster-bearing bodies. Analysis of the main factors of these subsystems allowed the establishment of a regional comprehensive drought disaster risk evaluation index system. To simultaneously evaluate the distribution and development trends of the regional comprehensive drought disaster risk, we established a dynamic evaluation model. Based on the ideas of the projection pursuit clustering method and the dynamic comprehensive evaluation method, the model can make use of multi-dimensional space–time drought disaster information. The model was applied to evaluate comprehensive drought disaster risk in the Xuzhou region, China. The evaluation results show that the method was able to illustrate the development trend and distribution of the comprehensive drought disaster risk in the Xuzhou region. The clustering zoning results show that Pizhou City is the area with the highest risk in Xuzhou, while Fengxian has the lowest. The development trend of comprehensive drought disaster risk with time is not significant.


2013 ◽  
Vol 357-360 ◽  
pp. 1783-1788
Author(s):  
Chang An Zhou ◽  
Hong Ren ◽  
Jing Yang Zhou

In order to solve the existent problems of incomplete and ambiguous information during the evaluation on the multiple constraints factors of city underground space development and utilization, this paper applies analytic hierarchy process and fuzzy comprehensive evaluation method to construct the comprehensive evaluation index system of the multiple constraint factors of city underground space development and utilization, then Yuzhong District, Yubei District, Beibei District in Chongqing respectively as an example, and comprehensively to evaluate the multiple constraint factors of city underground space development and utilization. Example analysis shows that, it has high feasibility and effectiveness that applies the method of fuzzy comprehensive evaluation to the multiple constraint factors of city underground space development and utilization, and it can contribute to solve fuzziness and uncertainty problems of the evaluation process.


2012 ◽  
Vol 452-453 ◽  
pp. 726-730
Author(s):  
Yao Wu Wei

ERP (Enterprise Resource Planning) is a kind of advanced management method and ideological system, which is an effective tool to improve operating efficiency. In reference to the domestic and foreign relevant research results, this paper attempts to find a set of evaluation index system and method, which is suitable for small and medium-sized enterprises in China implementing ERP system performance evaluation according to characteristics. Then use AHP to determine each index weight and evaluate comprehensively ERP implementation performance of small and medium-sized enterprise employing the fuzzy comprehensive evaluation method. This can provide ERP project methodological guidance and help enterprise to carry out the scientific decision, improve the success rate of ERP implementation, and promote the process of ERP in our country popularity.


2012 ◽  
Vol 503-504 ◽  
pp. 1301-1305
Author(s):  
Xia Chen ◽  
Min Liu ◽  
Lin Li

With respect to airport damage assessment problem, the analysis method is proposed. The airport damage is assessed according to the secondary fuzzy comprehensive evaluation model. Then the evaluation method of target damage level is given by the compare methods of interval numbers. Finally, the example calculations are given to demonstrating the effectiveness of this method.


2013 ◽  
Vol 357-360 ◽  
pp. 2754-2758
Author(s):  
Chang An Zhou ◽  
Can Chen ◽  
Hong Ren

According to constraint elements more and more appearing in the comprehensive forms, and at present it only considers that single constraint element of city underground space development and utilization has been unable to reflect the actual situation. On the basis of the main characteristics of city underground space development and utilization, this paper aims to analyze various factors which may cause the consequence and the frequency of appearance, and to construct evaluation index system of city underground space development and utilization which is composed of 5 one-level indexes, 20 two-level indexes of evaluation index system of multiple constraint factors of city underground space development and utilization, and to use the analytic hierarchy process and fuzzy comprehensive evaluation method to analyze and evaluate the influence on city underground space development and utilization. Analysis of the example application shows that, it only considers single constraint element of city underground space development and utilization is not comprehensive, and not science, and it needs to consider the correlation between various constraint elements.


2013 ◽  
Vol 291-294 ◽  
pp. 2217-2221
Author(s):  
Hai Yan Wang ◽  
Wei Li ◽  
Xin Wei Du ◽  
Quan Ming Zhang ◽  
Song Ling Dai ◽  
...  

With integrated consideration of existing research on power grid development evaluation index system and requirements of power grid development diagnosis, a more comprehensive power grid development diagnostic index system is established from five aspects of power grid security and reliability, high efficiency, coordination, economics and social environment and more than 20 indicators. In addition, a new power grid development diagnostic evaluation method based on hierarchical analysis and multi-level fuzzy comprehensive evaluation is proposed in order to diagnose and assess power grid status quo and the actual level of development comprehensively, objectively and systematically ,which will help power grid enterprises conveniently to find the main reason of affecting the power grid and enterprise development and encourage enterprises to continuously improve the targeted improvement measures and the level of grid development.


Sign in / Sign up

Export Citation Format

Share Document