scholarly journals The Risk Management Mode of Construction Project Management in the Multimedia Environment of Internet of Things

2021 ◽  
Vol 2021 ◽  
pp. 1-8
Author(s):  
Hai Xie ◽  
Zhihui Yang

The construction industry is the pillar industry of China’s national economy. According to the statistics of the National Bureau of Statistics, the GDP in 2016 was 744.127 billion yuan, while the total construction output value was 193.567 billion yuan, accounting for 6.5 percent of China’s GDP. The construction industry has played a pivotal role in promoting social development. Construction projects have always belonged to typical high-risk industries, and they will be affected by many factors, and these factors are mostly from the social environment and the natural environment, which makes it difficult to realize the expected construction period, cost, quality, safety, etc., of the construction project. The objectives, especially for large- and medium-sized construction projects, involve a lot of specialties, a wide range, a long construction period, and a huge amount of investment. Once the risks appear, the consequences are unimaginable. In addition, construction projects will be affected by accidental factors during the implementation process. If not handled in time, it will seriously affect the normal operation of construction projects. In view of the above problems, this article aims to study the risk management research of construction project management under the multimedia environment of the Internet of Things. Combining the characteristics of mobile construction projects, various problems are analyzed in the construction process of construction projects. This paper proposes a multimedia-based construction project management system, construction project quality management objectives and principles, and schedule risk prediction. The experimental results of this paper show that taking the construction project under the multimedia environment as an example, the communication management and quality control management of the construction project under the multimedia environment are studied. Through the combination of theory and practice, the work of construction projects under the multimedia environment of the Internet of Things is guaranteed to be completed on time and with high quality.

2017 ◽  
Vol 21 ◽  
pp. 587-595 ◽  
Author(s):  
Ion Șerbanoiu ◽  
Marina Verdeș ◽  
Adrian Alexandru Şerbănoiu ◽  
Bogdan Vasile Șerbanoiu ◽  
Mihaela Munteanu

The current trends in the construction industry, considering the magnitude and complexity of construction projects required the development of an appropriate methodology in the design, commissioning work and completion of works. The objective imposed creation of the "Office of Project Management" and all processes, tools and techniques of project management respects besides applicable standards and legislation construction, also imposed code of ethics and professional conduct of the PMI that guides practitioners professional project management, construction engineers, installers, architects etc. and describes the expectations that they have of themselves and of others.


2021 ◽  
Vol 19 (17) ◽  
Author(s):  
Yew-Hou Tung ◽  
Fah-Choy Chia ◽  
Felicia Yan-Yan Yong

Digital technologies have recently started to enter the construction industry, gradually changing how infrastructure, real estate and other built assets are designed, constructed, operated and maintained. Being among the least digitalized sectors, it is predicted that digital technologies will substantially increase the productivity, decrease the costs, and improve site safety of construction projects. Thus, the primary objective of this pilot study is to explore the usage of digital technologies for the 12 components of construction project management. A total of 32 respondents participated in the online survey. The results indicate that the usage of digital technologies was significantly higher in the management of scheduling, documenting, designing, and assigning costs. The aspects for digitalized safety, stakeholders, equipment, and materials are room for further improvement.


Author(s):  
Tomáš Mandičák ◽  
Peter Mesároš ◽  
Mária Kozlovská

Abstract The issue of cloud computing is a highly topical issue. Cloud computing represents a new model for information technology (IT) services based on the exploitation of Web (it represents a cloud) and other application platforms, as well as software as a service. In general, the exploitation of cloud computing in construction project management has several advantages, as demonstrated by several research reports. Currently, research quantifying the exploitation of cloud computing in the Slovak construction industry has not yet been carried out. The article discusses the issue of exploitation of cloud computing in construction project management in Slovakia. The main objective of the research is to confirm whether factors such as size of construction enterprise, owner of construction enterprise and participant of construction project have any impact on the exploitation level of cloud computing in construction project management. It includes confirmation of differences in use between different participants of the construction project or between construction enterprises broken down by size and shareholders.


Author(s):  
Ali Fathalizadeh ◽  
Parviz Ghoddousi ◽  
Ali Akbar Shirzadi Javid ◽  
M. Reza Hosseini ◽  
Arka Ghosh

This paper is an attempt to explore the barriers to integrating sustainability into construction project management in developing countries. To this end, a comprehensive review of the literature is conducted, as a result of which a list of 30 barriers is culled from existing studies. The list of barriers is subsequently assessed in terms of relative importance index (RII) through a survey questionnaire administered to Iranian construction industry experts, resulting in a dataset of 176 completed questionnaires. Findings bring to light the most influential barriers to incorporating sustainability in construction projects for a developing country. These were: (1) lack of understanding of the potential selfbenefits of proactivity and high economic risks that unsustainable practices may carry, (2) inadequate assessment of risks and a silo-based approach, namely, insufficient cooperation among practitioners, research institutions and environmental organisations and (3) the lack of a systematic approach to planning and acting for the fulfilment of sustainability goals. As one of the first studies in its kind, the paper offers invaluable insight for researchers, practitioners, and policy makers, in supporting the transition of construction project management practices towards fulfilling sustainable development goals.


2021 ◽  
Vol 2 (2) ◽  
Author(s):  
Yongjun Luo

The construction project serves as one of the most important projects in the construction industry. The high cost and the particularity in the implementation generate high risks in the investment and construction process. Over the years, the development of construction project management methods has promoted the management of risk factors. This paper reviews the suggestions of risk management of follow-up audit in construction stage and evaluates its application in construction projects.


2021 ◽  
pp. 2141007
Author(s):  
Mengyi Lian ◽  
Xiaowei Liu

Building information modeling (BIM) is one of the most exciting recent construction, engineering, and architecture developments. Built environments play a significant role in Smart City worldwide, and they are used to convey useful information to achieve smart city strategic goals. In modern project management, optimizing resources, BIM data integration, and data sharing in a smart city environment is challenging. Hence, in this paper, IoT-based Improved Building Information modeling (IoT-IBIM) has been proposed to overcome the challenges in building information modeling in modern project management for sustainable smart city applications. This paper discusses the efforts to create and integrate built-in environment data with IoT sensors for effective communication. The Internet of Things provides efficient resource control, increased efficiency, and improved human quality of life. As a result, the Internet of Things is a critical enabler of smart societies, including smart homes, smart cities, and smart factories. Building Information Modeling is an advanced asset allocation framework that generates high-quality output, reduces resource use, reduces environmental effects of development, and secures resources and availability for future generations. The experimental results show that the proposed IoT-IBIM method enhances the performance ratio and improves data integration and data sharing in a smart city environment.


Mathematics ◽  
2019 ◽  
Vol 7 (12) ◽  
pp. 1149 ◽  
Author(s):  
Tingting He ◽  
Guiwu Wei ◽  
Jianping Lu ◽  
Cun Wei ◽  
Rui Lin

Since the reform and opening up, Chinese economic and social development has undergone great changes, and the people’s living standards have improved markedly. For the national economy, the engineering construction is not only a carrier for specific economic tasks, but also a driving force for rapid and sustained economic development. With the continuous expansion of the scale of construction projects, safety management problems of construction projects are constantly exposed. How to effectively avoid accidents has become an important issue to be solved urgently in the construction industry. This paper mainly evaluates human factors in the process of construction project management, such as workers’ proficiency, workers’ safety awareness, technical workers’ quality, and workers’ emergency capacity, with the purpose of helping China’s construction projects proceed smoothly. In this research, we provide a multiple attribute group decision-making (MAGDM) technique based on Pythagorean 2-tuple linguistic numbers (P2TLNs) and the VIseKriterijumska Optimizacija I KOmpromisno Resenje (VIKOR) method for evaluating the human factors of construction projects. P2TLNs are used to represent the performance assessments of decision makers. Relying on a P2TLWA operator, P2TLWG operator, and the essential VIKOR method, a general framework is established. An application is presented to test the validity of the new method, and a comparative analysis with two algorithms and the P2TL-TODIM method is illustrated with detail.


2019 ◽  
Vol 50 (2) ◽  
pp. 226-242 ◽  
Author(s):  
José I. Ortiz ◽  
Eugenio Pellicer ◽  
Keith R. Molenaar

This research describes the managerial approaches that contractors follow to determine different types of contingencies in construction project management. Two large Spanish general contractors were selected for an in-depth analysis. Interviews and surveys were conducted with six additional companies to explore the external validity of the findings. Managers constrain time and cost buffers through project objectives, applying heuristics to determine inventory buffers. The management of capacity buffers is entrusted to subcontractors. The contractors take advantage of scope and quality buffers to meet project objectives but rarely share these buffers with the owner, unless the owner is an internal client.


Sign in / Sign up

Export Citation Format

Share Document