scholarly journals Analysis of the Critical Safety Thickness for Pretreatment of Mined-Out Areas Underlying the Final Slopes of Open-Pit Mines and the Effects of Treatment

2018 ◽  
Vol 2018 ◽  
pp. 1-8 ◽  
Author(s):  
Zhigang Tao ◽  
Mengnan Li ◽  
Chun Zhu ◽  
Manchao He ◽  
Xiaohui Zheng ◽  
...  

Where a mined-out area underlies a slope, it is a direct threat to slope safety and stability. This is of particular concern where a mined-out area underlies the slope of an open-pit mine, and it has a serious impact on the design and safety measures used for the mine. If a mined-out area underlying the final slope of an open-pit mine is not treated adequately and at the appropriate time, it may cause the slip failure of the final slope during the service life of the mine, posing a serious threat to the safety of personnel and equipment during the stripping phase. In light of the potential for such problems, this paper analyzes the instability mode and failure characteristics of an open-pit slope near a mined-out area in China using geological field survey and the polar stereographic projection method. The scale span method, in combination with engineering analogy and consideration of open-pit mining technology, is then used to determine the critical safety thickness at which pretreatment of mined-out areas should be carried out. A pretreatment process to infill the mined-out area during construction of open-pit mine steps is put forward, and its effects on slope stability and reliability are comprehensively evaluated. The results show that circular sliding is the most appropriate instability mode for a slope near a mined-out area. The failure initiates through breakage in the roof of the mined-out area, which induces subduction sliding of the free face of the slope at the left boundary of the mined-out area and subsequent failure of the entire regional slope. Comprehensive analysis methods are used to determine that the critical safety thickness at which a mined-out area under the final open-pit slope should be pretreated is 24 m. The recommended treatment countermeasure is to transfer filling slurry into the mined-out area through drilling holes in benches. This can satisfy the stability and reliability requirements for the slope under different working conditions.

2020 ◽  
Vol 194 ◽  
pp. 04043
Author(s):  
Guo Xiaoli ◽  
Yan Jiancheng ◽  
Li Xueliang ◽  
Wen Xin ◽  
Li Xingli

The dumps in the open-pit mining area in the eastern grassland are prone to landslides due to the fragile ecological environment, so it is inevitable to reshape the dump slopes. In order to explore a more scientific method for slope shaping of open-pit mine dump, slope stability analysis were used to compare effect of three types of slope-type (wave-shaped, slope-shaped and step-shaped slope shaping method)in outside dumping site of Baori Hiller open-pit mine. The results show that the slope stability is negatively correlated with the slope angle, and the stability of different shaping slopes is realized as wave-shaped slope (F=2.711)> Slope-shaped slope(F=2.513)>Step-shaped slope(F=1.047), in which the wave type and slope type are all within the safe range, but the step type slope is unstable; in consideration of cost, stability and erosion resistance, it is better to set the slope angle of the dump to 15°.The wave-shaped shaping method of the natural dumping of the excavation field outside the Baori Hiller open-pit mine has the best effect and is worth promoting.


Author(s):  
Mohanad F Jwaid, Husam K Salih Juboori

In the Recent times, various technological enhancements in the field of artificial intelligence and big data has been noticed. This advancements coupled with the evolution of the 5G communication and Internet of Things technologies, has helped in the development in the domain of smart mine construction. The development of unmanned vehicles with enhanced and smart scheduling system for open-pit mine transportation is one such much needed application. Traditional open-pit mining systems, which often cause vehicle delays and congestion, are controlled by human authority. The number of sensors has been used to operate unmanned cars in an open-pit mine. The sensors haves been used to prove the real-time data in large quantity. Using this data, we analyses and create an improved transportation scheduling mechanism so as to optimize the paths for the vehicles. Considering the huge amount the data received and aggregated through various sensors or sources like, the GPS data of the unmanned vehicle, the equipment information, an intelligent, and multi-target, open-pit mine unmanned vehicle schedules model was developed. It is also matched with real open-pit mine product to reduce transport costs, overall unmanned vehicle wait times and fluctuation in ore quality. To resolve the issue of scheduling the transportation, we prefer to use algorithms based on artificial intelligence. In addition to four other models we are proposing a decomposition-based restricted genetic dominance (DBCDP-NSGA-II) algorithm, which retains viable and non-facilitating solutions in small areas in order to improve the convergence, distribution and diversity of traditional high-dimensional multi-objective fast-dominated genetic sorting Algorithms (NSGA-II).


2020 ◽  
pp. 55-58
Author(s):  
I. O. Temkin ◽  
◽  
A. V. Myaskov ◽  
S. A. Deryabin ◽  
U. A. Rzazade ◽  
...  

This article discusses modern modeling technologies which open up new capabilities for creating a digital platform for open pit mining management. The specific details of the construction of an intelligent digital platform for the management of transport processes during mineral mining are discussed. A brief overview of the methods and tools for modeling technological processes in open pit mining is given. The stages to be overcome on the path of digital transformation of mines using dynamic 3D models are presented. It is proposed to use software environments of the gaming industry platforms and virtual reality systems as tools for the dynamic 3D modeling of objects. The classes of agents are introduced for the convenience of structuring the tasks to be solved. The basic functional and instrumental elements of the intelligent platform being developed at the present time are given, and also a simplified structure of the technological process control system in an open pit mine, including the prediction module, is presented. The principles of work are described, and the advantages of the specific tool for creating digital 3D models are also discussed. The results obtained in modeling a stage of a transport cycle in an open pit mine are reported. The research was supported by the Russian Science Foundation, Grant No. 19-17-00184.


2020 ◽  
Author(s):  
Jihyun Moon ◽  
Heejeong Seo ◽  
Hoonyol Lee

<p>Musan mine in North Korea is the largest open-pit iron mine in Asia with the proved reserves of about 2.06 billion tons and more than 9 square kilometers. Open-pit mining is one of the surface mining technique extracting minerals from the surface. Vegetation is rarely distributed at the mining site because the topsoil is removed and the ore is mined directly from the surface. Therefore, it is effective to observe surface displacement at the mining site using Interferometric Synthetic Aperture Radar (InSAR) technology. InSAR coherence detects random surface change that measures the activity or stability of the interferometric phase of InSAR data. High coherence will be maintained on the surface where there is no movement and only surface scattering. On the other hand, the surface where there is a lot of movement and volumetric scattering has low coherence value. Therefore, using 12-days InSAR coherence images from Sentinel-1 satellites, for example, it is possible to analyze how active the open-pit mine is during the 12 days. Sentinel-1A satellite images were acquired from June 11, 2015 to May 24, 2016, followed by Sentine-1B satellite images from September 27, 2016 to April 21, 2019. A total of 102 SAR images were downloaded from European Space Agency (ESA) portal. There is a gap between May 24 and September 27, 2016 due to the transition of the data acquisition plan. Over 100 12-days coherence data were obtained by applying InSAR. Stable spots and target spots were selected through average and standard deviation of the entire coherence time series data. Coherence values include not only the mining activity but also the effects of perpendicular baseline, temporal baseline, and weather. Therefore, NDAI (Normalized Difference Activity Index) was newly defined to remove the noise and only the coherence value due to the influence of the mining activity was extracted. The degree of activities can be observed by the time series coherence and NDAI images. This study needs other references related to mining activities in order to analyze the mining activities in more detail. This method can be applied to other open-pit mine.</p>


2011 ◽  
Vol 84-85 ◽  
pp. 729-732 ◽  
Author(s):  
Jun Guo ◽  
De Qing Gan ◽  
Yu Zhang ◽  
Wei Hang Zhang

The paper analyzed major factors that influence the stability of open-pit slope and established the GM (1, N) model based on the program of Xingshan strip mine, which provided an effective method for evaluating the slope stability.


2021 ◽  
Vol 24 (1) ◽  
pp. 47-56
Author(s):  
Tandidatu Deny ◽  
◽  
Sundek Hariyadi ◽  

The stability of slope, both on the slope of work and the final slope, is a very important aspect of slope stability, both on the slope of work and the final slope in open pit mining activities. The inconsistency of the slopes will result in the collapse of rocks around the excavation site. This happens because the condition of the rock when it has not been excavated is generally balanced. However, due to the discontinuous patterns that occur other than naturally and also due to the mining activities such as excavation, blasting and others, cause a reduction in the retaining force of the rock on the slope results in the equilibrium of the force tends to shift and is not balanced. Study of the stability of the open pit highwall slope at PIT 22 GN PT Kitadin Site Embalut, Kutai Kartanegara Regency, East Kalimantan Province was carried out with the aim to know the rock characteristics, to calculate slope geometry stable safety factors, and to recognize the type of landslide using a bishop method. The results of the modeling consist of several heights and slopes, as well as angles that is formed. Section AA’ has a safety factor value of 1.387, section BB has a safety factor of 1.482, section BB' has a safety factor value of 1.390, section DD' has a safety factor value of 1.318, section EE has a safety factor value of 2,381, section FF' has a safety factor value of 2.426, section GG' has a safety factor value of 2.424, section HH 'has a safety factor value of 2.339.


Metals ◽  
2021 ◽  
Vol 11 (11) ◽  
pp. 1681
Author(s):  
Yong Wang ◽  
Song-Tao Ni ◽  
Fa-Wu Yang ◽  
Zhong-Xin Wang ◽  
Hong Zhang ◽  
...  

The stability of open-pit mining is a hot issue in geotechnical engineering. A mining railroad is in operation on the slope where the east exhaust inclined shaft and the east sand injection inclined shaft on the Laohutai Mine are located, and it was necessary to determine whether railroad vibration would have an impact on the safety of the inclined shafts. With this project as the background, the dynamic response of the slope with inside two inclined shafts was conducted under train loading. A three-dimensional numerical model by using PLAXIS 3D was established to analyze the stability of the slope. The results show that the dynamic reaction caused by the full-loaded train is significantly greater than the no-load train. The safety factor of the slope under the dynamic load is 1.201, and the maximum displacement of the slope which occurred in the gravel layer directly beneath the train track is about 5 mm. The acceleration responses of the two inclined shafts are almost consistent. The maximum horizontal and vertical acceleration occur at the epidote weak layer. The acceleration directly below the load increases significantly. Therefore, it can be considered that the slopes are stable under the action of train vibration, and the influence on the two inclined shafts is small and negligible.