Online Scheduling on a Single Machine with Grouped Processing Times
Keyword(s):
We consider the online scheduling problem on a single machine with the assumption that all jobs have their processing times in[p,(1+α)p], wherep>0andα=(5-1)/2. All jobs arrive over time, and each job and its processing time become known at its arrival time. The jobs should be first processed on a single machine and then delivered by a vehicle to some customer. When the capacity of the vehicle is infinite, we provide an online algorithm with the best competitive ratio of(5+1)/2. When the capacity of the vehicle is finite, that is, the vehicle can deliver at mostcjobs at a time, we provide another best possible online algorithm with the competitive ratio of(5+1)/2.
Keyword(s):
2014 ◽
Vol 25
(06)
◽
pp. 745-761
◽
2013 ◽
Vol 2013
◽
pp. 1-7
◽
2015 ◽
Vol 32
(06)
◽
pp. 1550047
Keyword(s):
Keyword(s):
2010 ◽
Vol 110
(8-9)
◽
pp. 325-330
◽
Keyword(s):
2014 ◽
Vol 31
(05)
◽
pp. 1450038
◽
2016 ◽
Vol 33
(04)
◽
pp. 1650027
Keyword(s):
2013 ◽
Vol 787
◽
pp. 1020-1024
2018 ◽
Vol 35
(04)
◽
pp. 1850026
Keyword(s):