scholarly journals An Order Insertion Scheduling Model of Logistics Service Supply Chain Considering Capacity and Time Factors

2014 ◽  
Vol 2014 ◽  
pp. 1-16 ◽  
Author(s):  
Weihua Liu ◽  
Yi Yang ◽  
Shuqing Wang ◽  
Yang Liu

Order insertion often occurs in the scheduling process of logistics service supply chain (LSSC), which disturbs normal time scheduling especially in the environment of mass customization logistics service. This study analyses order similarity coefficient and order insertion operation process and then establishes an order insertion scheduling model of LSSC with service capacity and time factors considered. This model aims to minimize the average unit volume operation cost of logistics service integrator and maximize the average satisfaction degree of functional logistics service providers. In order to verify the viability and effectiveness of our model, a specific example is numerically analyzed. Some interesting conclusions are obtained. First, along with the increase of completion time delay coefficient permitted by customers, the possible inserting order volume first increases and then trends to be stable. Second, supply chain performance reaches the best when the volume of inserting order is equal to the surplus volume of the normal operation capacity in mass service process. Third, the larger the normal operation capacity in mass service process is, the bigger the possible inserting order’s volume will be. Moreover, compared to increasing the completion time delay coefficient, improving the normal operation capacity of mass service process is more useful.

2012 ◽  
Vol 2012 ◽  
pp. 1-18 ◽  
Author(s):  
Weihua Liu ◽  
Yi Yang ◽  
Xiang Li ◽  
Haitao Xu ◽  
Dong Xie

With the increasing demand for customized logistics services in the manufacturing industry, the key factor in realizing the competitiveness of a logistics service supply chain (LSSC) is whether it can meet specific requirements with the cost of mass service. In this case, in-depth research on the time-scheduling of LSSC is required. Setting the total cost, completion time, and the satisfaction of functional logistics service providers (FLSPs) as optimal targets, this paper establishes a time scheduling model of LSSC, which is constrained by the service order time requirement. Numerical analysis is conducted by using Matlab 7.0 software. The effects of the relationship cost coefficient and the time delay coefficient on the comprehensive performance of LSSC are discussed. The results demonstrate that with the time scheduling model in mass-customized logistics services (MCLSs) environment, the logistics service integrator (LSI) can complete the order earlier or later than scheduled. With the increase of the relationship cost coefficient and the time delay coefficient, the comprehensive performance of LSSC also increases and tends towards stability. In addition, the time delay coefficient has a better effect in increasing the LSSC’s comprehensive performance than the relationship cost coefficient does.


2014 ◽  
Vol 2014 ◽  
pp. 1-22 ◽  
Author(s):  
Weihua Liu ◽  
Yi Yang ◽  
Haitao Xu ◽  
Xiaoyan Liu ◽  
Yijia Wang ◽  
...  

In mass customization logistics service, reasonable scheduling of the logistics service supply chain (LSSC), especially time scheduling, is benefit to increase its competitiveness. Therefore, the effect of a customer order decoupling point (CODP) on the time scheduling performance should be considered. To minimize the total order operation cost of the LSSC, minimize the difference between the expected and actual time of completing the service orders, and maximize the satisfaction of functional logistics service providers, this study establishes an LSSC time scheduling model based on the CODP. Matlab 7.8 software is used in the numerical analysis for a specific example. Results show that the order completion time of the LSSC can be delayed or be ahead of schedule but cannot be infinitely advanced or infinitely delayed. Obtaining the optimal comprehensive performance can be effective if the expected order completion time is appropriately delayed. The increase in supply chain comprehensive performance caused by the increase in the relationship coefficient of logistics service integrator (LSI) is limited. The relative concern degree of LSI on cost and service delivery punctuality leads to not only changes in CODP but also to those in the scheduling performance of the LSSC.