scholarly journals Safety Analysis against Tsunami Attacks at a Nuclear Power Plant Site

2013 ◽  
Vol 2013 ◽  
pp. 1-9 ◽  
Author(s):  
Jeong-Wook Seo ◽  
Jin Woo Lee ◽  
Yong-Sik Cho

Several nuclear power plants are now under operation, and more plants will be built along the eastern coast of the Korean Peninsula. These nuclear power plant sites may be vulnerable to unexpected tsunami attacks. In this study, a coupled numerical model based on the shallow-water theory was employed to analyze the safety of the Uljin Nuclear Power Plant site against three historical and eleven virtual tsunami attacks. The numerical model consisted of a transoceanic propagation and an inundation model. Both models were discretized by the finite difference method. Maximum and minimum tsunami heights were estimated for the three historical and eleven virtual tsunamis. The obtained results showed that the Uljin Nuclear Power Plant site would be safe against the tsunami attacks included in this study.

2017 ◽  
Vol 2017 ◽  
pp. 1-7 ◽  
Author(s):  
T. J. Katona ◽  
A. Vilimi

Nuclear power plants shall be designed to resist the effects of large earthquakes. The design basis earthquake affects large area around the plant site and can cause serious consequences that will affect the logistical support of the emergency actions at the plant, influence the psychological condition of the plant personnel, and determine the workload of the country’s disaster management personnel. In this paper the main qualitative findings of a study are presented that have been performed for the case of a hypothetical 10−4/a probability design basis earthquake for the Paks Nuclear Power Plant, Hungary. The study covers the qualitative assessment of the postearthquake conditions at the settlements around the plant site including quantitative evaluation of the condition of dwellings. The main goal of the recent phase of the study was to identify public utility vulnerabilities that define the outside support conditions of the nuclear power plant accident management. The results of the study can be used for the planning of logistical support of the plant accident management staff. The study also contributes to better understanding of the working conditions of the disaster management services in the region around the nuclear power plant.


KnE Energy ◽  
2016 ◽  
Vol 1 (1) ◽  
Author(s):  
Sri Kuntjoro

<p>The atmosphere is an important pathway in the transfer of radionuclides from nuclear power plants into the environment and population. Acceptance of radiation dose to the environment and population affected by the radionuclides release and site conditions surrounding of the nuclear power plant. The radionuclides release in the atmosphere is determined by the dispersion coefficient parameter. The aim of this paper is to obtain dispersion coefficient and radionuclide released in Sebagin (West Bangka district) caused by severe accident condition from the PWR Nuclear Power Plant. Dispersion analysis of radionuclides into the environment from nuclear power PWR on severe accident conditions have been done using MACCS program. Reference for the calculation of source term fraction is selected from calculation results of the MELCOR computer code and it is implemented to PWR reactors Westinghouse 3411 MWth subject. The calculation of radionuclides release performed using MACCS program for aspiring nuclear power plant site in West Bangka. Simulation calculations for the area radius from 0.80 kmup to 20 km from the nuclear power plant site are performed. Meteorological datas used in calculation are the meteorology data from Sebagin meteorological stations for the years of 2012 period. The result is the dispersion coefficient decreases as a function of time and distance. The concentration of radionuclides through soil pathway decreases as a function of the distance, and the dominant contributor of radionuclide radiation Xe-133 and   I-131. Radionuclide concentrations obtained through the air pathway decreases as a function of distance, and dominant contributors of radionuclide radiation is contributed also from I-131 and Xe-133. The presence of I-131 radionuclides are giving dangerous to humans, it is necessary to further treatment for prevent its impacts. </p>


Author(s):  
Yujie Sun ◽  
Changzhi Chen

Abstract In order to make a comprehensive evaluation of many influencing factors on the site selection of nuclear power plants, and to make a quantitative judgment on the rank of candidate sites, a method of site selection based on analytic hierarchy process (AHP) and fuzzy evaluation is proposed. Firstly, based on the characteristics of design and research institute, the factors influencing the site selection of nuclear power plants are analyzed. The indicator of criterion layer and index layer influencing the site selection of nuclear power plant are determined based on specialty, and the decision-making system of site selection scheme is established. Secondly, based on AHP operation rules, the weights of system indicator are calculated. Thirdly, by determining the evaluation set, the evaluation matrix based on fuzzy theory was established, and the evaluation level of candidate sites was determined based on the principle of maximum membership degree. Finally, a practical nuclear power plant site selection project is used for theoretical verification. The candidate sites of nuclear power plants are ranked by the first and second level fuzzy comprehensive evaluation. The results show that the quantitative ranking of site based on AHP and fuzzy evaluation is consistent with the previous qualitative ranking of the project. The site selection method based on AHP -fuzzy evaluation is efficient.


2020 ◽  
Vol 39 (5) ◽  
pp. 6339-6350
Author(s):  
Esra Çakır ◽  
Ziya Ulukan

Due to the increase in energy demand, many countries suffer from energy poverty because of insufficient and expensive energy supply. Plans to use alternative power like nuclear power for electricity generation are being revived among developing countries. Decisions for installation of power plants need to be based on careful assessment of future energy supply and demand, economic and financial implications and requirements for technology transfer. Since the problem involves many vague parameters, a fuzzy model should be an appropriate approach for dealing with this problem. This study develops a Fuzzy Multi-Objective Linear Programming (FMOLP) model for solving the nuclear power plant installation problem in fuzzy environment. FMOLP approach is recommended for cases where the objective functions are imprecise and can only be stated within a certain threshold level. The proposed model attempts to minimize total duration time, total cost and maximize the total crash time of the installation project. By using FMOLP, the weighted additive technique can also be applied in order to transform the model into Fuzzy Multiple Weighted-Objective Linear Programming (FMWOLP) to control the objective values such that all decision makers target on each criterion can be met. The optimum solution with the achievement level for both of the models (FMOLP and FMWOLP) are compared with each other. FMWOLP results in better performance as the overall degree of satisfaction depends on the weight given to the objective functions. A numerical example demonstrates the feasibility of applying the proposed models to nuclear power plant installation problem.


2019 ◽  
Vol 7 (2B) ◽  
Author(s):  
Vanderley Vasconcelos ◽  
Wellington Antonio Soares ◽  
Raissa Oliveira Marques ◽  
Silvério Ferreira Silva Jr ◽  
Amanda Laureano Raso

Non-destructive inspection (NDI) is one of the key elements in ensuring quality of engineering systems and their safe use. This inspection is a very complex task, during which the inspectors have to rely on their sensory, perceptual, cognitive, and motor skills. It requires high vigilance once it is often carried out on large components, over a long period of time, and in hostile environments and restriction of workplace. A successful NDI requires careful planning, choice of appropriate NDI methods and inspection procedures, as well as qualified and trained inspection personnel. A failure of NDI to detect critical defects in safety-related components of nuclear power plants, for instance, may lead to catastrophic consequences for workers, public and environment. Therefore, ensuring that NDI is reliable and capable of detecting all critical defects is of utmost importance. Despite increased use of automation in NDI, human inspectors, and thus human factors, still play an important role in NDI reliability. Human reliability is the probability of humans conducting specific tasks with satisfactory performance. Many techniques are suitable for modeling and analyzing human reliability in NDI of nuclear power plant components, such as FMEA (Failure Modes and Effects Analysis) and THERP (Technique for Human Error Rate Prediction). An example by using qualitative and quantitative assessesments with these two techniques to improve typical NDI of pipe segments of a core cooling system of a nuclear power plant, through acting on human factors issues, is presented.


Electronics ◽  
2020 ◽  
Vol 9 (9) ◽  
pp. 1467
Author(s):  
Sangdo Lee ◽  
Jun-Ho Huh ◽  
Yonghoon Kim

The Republic of Korea also suffered direct and indirect damages from the Fukushima nuclear accident in Japan and realized the significance of security due to the cyber-threat to the Republic of Korea Hydro and Nuclear Power Co., Ltd. With such matters in mind, this study sought to suggest a measure for improving security in the nuclear power plant. Based on overseas cyber-attack cases and attacking scenario on the control facility of the nuclear power plant, the study designed and proposed a nuclear power plant control network traffic analysis system that satisfies the security requirements and in-depth defense strategy. To enhance the security of the nuclear power plant, the study collected data such as internet provided to the control facilities, network traffic of intranet, and security equipment events and compared and verified them with machine learning analysis. After measuring the accuracy and time, the study proposed the most suitable analysis algorithm for the power plant in order to realize power plant security that facilitates real-time detection and response in the event of a cyber-attack. In this paper, we learned how to apply data for multiple servers and apply various security information as data in the security application using logs, and match with regard to application of character data such as file names. We improved by applying gender, and we converted to continuous data by resetting based on the risk of non-continuous data, and two optimization algorithms were applied to solve the problem of overfitting. Therefore, we think that there will be a contribution in the connection experiment of the data decision part and the optimization algorithm to learn the security data.


2021 ◽  
Author(s):  
S. W. Glass ◽  
Leonard S. Fifield ◽  
Mychal P. Spencer

Abstract Nuclear power plant cables were originally qualified for 40 year life and generally have not required specific test verification to assure service availability through the initial plant qualification period. However, license renewals to 60 and 80 years of operation require a cable aging management program that depends on some form of test and verification to assure fitness for service. Environmental stress (temperature, radiation, chemicals, water, and mechanical) varies dramatically within a nuclear power plant and, in some cases, cables have degraded and required repair or replacement before their qualified end-of-life period. In other cases, cable conditions have been mild and dependable cable performance confirmed to extend well beyond the initial qualified life. Most offline performance-based testing requires cables to be decoupled and de-energized for specially trained technicians to perform testing. These offline tests constitute an expensive operational burden that limits the economic viability of nuclear power plants. Although initial investment may be higher, new online test practices are emerging as options or complements to offline testing that avoid or minimize the regularly scheduled offline test burden. These online methods include electrical and fiber-optic partial discharge measurement, spread spectrum time or frequency domain reflectometry, distributed temperature profile measurements, and local interdigital capacitance measurement of insulation characteristics. Introduction of these methods must be supported by research to confirm efficacy plus either publicly financed or market driven investment to support the start-up expense of cost-effective instrumentation to monitor cable condition and assure reliable operation. This work summarizes various online cable assessment technologies plus introduces a new cable motor test bed to assess some of these technologies in a controlled test environment.


2021 ◽  
Author(s):  
Li Liang ◽  
Pan Rong ◽  
Ren Guopeng ◽  
Zhu Xiuyun

Abstract Almost all nuclear power plants in the world are equipped with seismic instrument system, especially the third generation nuclear power plants in China. When the ground motion measured by four time history accelerometers of containment foundation exceeds the preset threshold, the automatic shutdown trigger signal will be generated. However, from the seismic acceleration characteristics, isolated and prominent single high frequency will be generated the acceleration peak, which has no decisive effect on the seismic response, may cause false alarm, which has a certain impact on the smooth operation of nuclear power plant. According to the principle of three elements of ground motion, this paper puts forward a method that first selects the filtering frequency band which accords with the structural characteristics of nuclear power plants, then synthesizes the three axial acceleration time history, and finally selects the appropriate acceleration peak value for threshold alarm. The results show that the seismic acceleration results obtained by this method can well represent the actual magnitude of acceleration, and can solve the problem of false alarm due to the randomness of single seismic wave, and can be used for automatic reactor shutdown trigger signal of seismic acceleration.


Sign in / Sign up

Export Citation Format

Share Document