scholarly journals A Hybrid Genetic Algorithm to Minimize Total Tardiness for Unrelated Parallel Machine Scheduling with Precedence Constraints

2013 ◽  
Vol 2013 ◽  
pp. 1-11 ◽  
Author(s):  
Chunfeng Liu

The paper presents a novel hybrid genetic algorithm (HGA) for a deterministic scheduling problem where multiple jobs with arbitrary precedence constraints are processed on multiple unrelated parallel machines. The objective is to minimize total tardiness, since delays of the jobs may lead to punishment cost or cancellation of orders by the clients in many situations. A priority rule-based heuristic algorithm, which schedules a prior job on a prior machine according to the priority rule at each iteration, is suggested and embedded to the HGA for initial feasible schedules that can be improved in further stages. Computational experiments are conducted to show that the proposed HGA performs well with respect to accuracy and efficiency of solution for small-sized problems and gets better results than the conventional genetic algorithm within the same runtime for large-sized problems.

2015 ◽  
Vol 2015 ◽  
pp. 1-8 ◽  
Author(s):  
Peng Liang ◽  
Hai-dong Yang ◽  
Guo-sheng Liu ◽  
Jian-hua Guo

This research considers an unrelated parallel machine scheduling problem with energy consumption and total tardiness. This problem is compounded by two challenges: differences of unrelated parallel machines energy consumption and interaction between job assignments and machine state operations. To begin with, we establish a mathematical model for this problem. Then an ant optimization algorithm based on ATC heuristic rule (ATC-ACO) is presented. Furthermore, optimal parameters of proposed algorithm are defined via Taguchi methods for generating test data. Finally, comparative experiments indicate the proposed ATC-ACO algorithm has better performance on minimizing energy consumption as well as total tardiness and the modified ATC heuristic rule is more effectively on reducing energy consumption.


2009 ◽  
Vol 419-420 ◽  
pp. 633-636 ◽  
Author(s):  
James C. Chen ◽  
Wun Hao Jaong ◽  
Cheng Ju Sun ◽  
Hung Yu Lee ◽  
Jenn Sheng Wu ◽  
...  

Resource-constrained multi-project scheduling problems (RCMPSP) consider precedence relationship among activities and the capacity constraints of multiple resources for multiple projects. RCMPSP are NP-hard due to these practical constraints indicating an exponential calculation time to reach optimal solution. In order to improve the speed and the performance of problem solving, heuristic approaches are widely applied to solve RCMPSP. This research proposes Hybrid Genetic Algorithm (HGA) and heuristic approach to solve RCMPSP with an objective to minimize the total tardiness. HGA is compared with three typical heuristics for RCMPSP: Maximum Total Work Content, Earliest Due Date, and Minimum Slack. Two typical RCMPSP from literature are used as a test bed for performance evaluation. The results demonstrate that HGA outperforms the three heuristic methods in term of the total tardiness.


Sign in / Sign up

Export Citation Format

Share Document