scholarly journals Fuzzy Comprehensive Evaluation on the Effect of Measures Operation for Oil-Water Well

2011 ◽  
Vol 2011 ◽  
pp. 1-5 ◽  
Author(s):  
Zhi-Bin Liu ◽  
Wei Qing ◽  
Xin-Hai Kong

The measures operation is an important component of borehole operation, and the operation effects directly affect the increase of oil and gas production. In perspective of the present reality of borehole operation company, the authors analyze the commonly used type of measures on the oil field, summarize six indicators to evaluate the measures operation effect, and give the quantitative calculation method for six evaluation indicators. Through the experts grading method, we can obtain all the weights of indicators and then establish the fuzzy comprehensive evaluation model of operation effect of measures. The evaluation model can be used to evaluate the operation effect of single well, oil block, or the branch company. Based on the actual data of measures operation of a branch company, using the fuzzy comprehensive evaluation approach to evaluate each block in the branch company, this paper obtained the same conclusion as the qualitative analysis.

2014 ◽  
Vol 1044-1045 ◽  
pp. 1859-1862
Author(s):  
Zhi Zhao ◽  
Zhuo Nan Feng

This article in view of the oil and gas production and operation plan evaluation indexes both depend on each other, and contradictory, difficult to conduct a comprehensive evaluation of characteristics. Using the fuzzy mathematics method to establish calculation model, through the fuzzy comprehensive evaluation, selected from several schemes out a best solution, to help managers to make right decisions and judgments.


2020 ◽  
Vol 58 (3) ◽  
pp. 397-424
Author(s):  
Jesse Salah Ovadia ◽  
Jasper Abembia Ayelazuno ◽  
James Van Alstine

ABSTRACTWith much fanfare, Ghana's Jubilee Oil Field was discovered in 2007 and began producing oil in 2010. In the six coastal districts nearest the offshore fields, expectations of oil-backed development have been raised. However, there is growing concern over what locals perceive to be negative impacts of oil and gas production. Based on field research conducted in 2010 and 2015 in the same communities in each district, this paper presents a longitudinal study of the impacts (real and perceived) of oil and gas production in Ghana. With few identifiable benefits beyond corporate social responsibility projects often disconnected from local development priorities, communities are growing angrier at their loss of livelihoods, increased social ills and dispossession from land and ocean. Assuming that others must be benefiting from the petroleum resources being extracted near their communities, there is growing frustration. High expectations, real and perceived grievances, and increasing social fragmentation threaten to lead to conflict and underdevelopment.


2021 ◽  
Author(s):  
David Russell ◽  
Price Stark ◽  
Sean Owens ◽  
Awais Navaiz ◽  
Russell Lockman

Abstract Reducing well costs in unconventional development while maintaining or improving production continues to be important to the success of operators. Generally, the primary drivers for oil and gas production are treatment fluid volume, proppant mass, and the number of stages or intervals along the well. Increasing these variables typically results in increased costs, causing additional time and complexity to complete these larger designs. Simultaneously completing two wells using the same volumes, rates, and number of stages as for any previous single well, allows for more lateral length or volume completed per day. This paper presents the necessary developments and outcomes of a completion technique utilizing a single hydraulic fracturing spread to simultaneously stimulate two or more horizontal wells. The goal of this technique is to increase operational efficiency, lower completion cost, and reduce the time from permitting a well to production of that well—without negatively impacting the primary drivers of well performance. To date this technique has been successfully performed in both the Bakken and Permian basins in more than 200 wells, proving its success can translate to other unconventional fields and operations. Ultimately, over 200 wells were successfully completed simultaneously, resulting in a 45% increase in completion speed and significant decrease in completion costs, while still maintaining equivalent well performance. This type of simultaneous completion scenario continues to be implemented and improved upon to improve asset returns.


2012 ◽  
Author(s):  
Amer Badr Merdhah ◽  
Abu Azam Mohd Yassin

Kerak pemendapan merupakan satu daripada masalah paling penting dan serius dalam sistem suntikan air. Kerak kadangkala mengehadkan atau menghalang penghasilan gas dan minyak melalui penyumbatan matrik atau perpecahan pembentukan minyak dan jeda yang berlubang. Makalah ini mengetengahkan kesimpulan pengukuran makmal bagi kerak terbentuk di dalam keterlarutan medan minyak biasa dalam sintetik air masin (pembentukan air dan air laut) bagi pembentukan air yang mengandungi barium dan kandungan garam yang tinggi pada suhu 40 hingga 90°C pada tekanan atmosfera. Keputusan uji kaji mengesahkan pola kebergantungan keterlarutan bagi kerak medan minyak biasa pada keadaan ini. Pada suhu yang lebih tinggi, kerak bagi CaCO3, CaSO4, dan SrSO4 meningkat manakala kerak BaSO4 menurun disebabkan oleh keterlarutan CaCO3, CaSO4, dan SrSO4 menurun dan keterlarutan BaSO4 meningkat dengan kenaikan suhu. Kata kunci: Masalah pengskalaan; skala keterlarutan; paras kandungan garam tinggi; logam barium tinggi Scale deposition is one of the most important and serious problems which water injection systems are generally engaged in. Scale sometimes limits or blocks oil and gas production by plugging the oil–producing formation matrix or fractures and the perforated intervals. This paper presents a summary of the laboratory measurements of the solubility of common oil field scales in synthetic brines (formation water and sea water) of high–barium and high–salinity formation waters at 40 to 90°C and atmospheric pressure. The experimental results confirm the general trend in solubility dependencies for common oil field scales at these conditions. At higher temperatures the deposition of CaCO3, CaSO4 and SrSO4 scale increases and the deposition of BaSO4 scale decreases since the solubilities of CaCO3, CaSO4 and SrSO4 scales decreases and the solubility of BaSO4 increases with increasing temperature. Key words: Scaling problems; solubility of scale; high salinity; high barium


2012 ◽  
Vol 155-156 ◽  
pp. 722-725
Author(s):  
Wen Bin Cai ◽  
Guo Wei Qin ◽  
Yan He

In the oil and gas production process, serious sand production causes reservoir and pipe blocked, which makes productivity declined, even stopped. It's the efficient means of sand washing and plug removal by using high-pressure foam fluid jet. The structure and performance of sand washing device determines the efficiency of sand washing and plug removal. The device's nozzle consists of anti-blocking valves, three kinds of nozzles with self-drive, rotation characteristics during the operation. The nozzles include sand washing nozzle, couple nozzle and power nozzle. This device can be used in horizontal wells with complex well bore situation to carry out sand and plug removal. The device has a good effect on sand washing and plug removal in the oil field.


2012 ◽  
Vol 241-244 ◽  
pp. 1396-1399
Author(s):  
Gui Min Nie ◽  
Dan Guo ◽  
Yan Wang ◽  
Xiao Wei Cheng

With the depletion of shallow-layer oil and gas pools inLiaohe oilfield, buried hill stratigraphic reservoirs in Liaohe oil field are becoming main objectives for exploration in recent years, especially in high-risk areas of Xinglongtai deep the Hing ancient buried hill resources are particularly rich. Since 2007, Liaohe oilfield increased investment for Buried Hill reservoirs with deep horizontal drilling developt the buried hill reservoir. Liaohe has completed 36 deep horizontal, with a total footage of 183920m, the average depth of 5109m. Improving drilling speed of "buried hill deep horizontal and branch horizontal wells”, and reducing drilling costs are of great urgency. “Hing buried hill deep horizontal, horizontal wells,” with composite drilling technology, supporting the optimization of PDC bits, the high-pressure jet drilling, the MWD borehole trajectory control and optimization of drilling parameters, the new drilling fluid technology and so on. With a large number of horizontal wells put into Buried Hill stratigraphic reservoirs, oil and gas production of average deep horizontal well increase of 2-5 times. Besides, the previous recovery and production of oil and gas reservoirs significantly improved to create an objective economic and social benefits.


Author(s):  
Yaroslav Adamenko ◽  
◽  
Mirela Coman ◽  
Oleh Adamenko ◽  

Environmentally safe oil and gas production demands permanent control for the development of ecological situation which should be managed on the basis of existing nature protection requirements and corresponding instruction documents. Purpose of the research and formulation of the problem is to select landscape complexes at the hierarchical levels of locations and facies in the Bykiv oil and gas field to make landscape map with morphological genetic and age features of landscape structure as the basis of environmental assessment of oil and gas field impact on the natural geosystems. Presentation of the main research material with full justification of the received scientific results. Landscape analysis of the investigated area allowed to select, ground and make mapping the following landscape complexes: landscape localities, foothill landscape complexes. Characteristic feature of the Bytkiv oil and gas field and neighborhoods is their high-altitude stratification from middle and lowmountainous to foothills and lowlands. The genesis or origin of the area under study is various - from denudation relics of the top peneplenization surface of leveling much younger pedyplenization surface pediments on the transition from mountainous to foothill relief, to deeply portioned erosionally active steep slopes and stairstepping of the river terraces. Age boundaries of the created landscape structures were determined on the availability of adjoint sedimentary formations from the producents of bedrock destruction, resedimented eolivan, deluvial, proluvial and alluvial processes.


2002 ◽  
Vol 20 (5) ◽  
pp. 347-364
Author(s):  
I. Lerche ◽  
S. Noeth

The influence of two fundamentally different types of uncertainty on the value of oil field production are investigated here. First considered is the uncertainty caused by the fact that the expected value estimate is not one of the possible outcomes. To correctly allow for the risk attendant upon using the expected value as a measure of worth, even with statistically sharp parameters, one needs to incorporate the uncertainty of the expected value. Using a simple example we show how such incorporation allows for a clear determination of the relative risk of projects that may have the same expected value but very different risks. We also show how each project can be risked on its own using the expected value and variance. This uncertainty type is due to the possible pathways for different outcomes even when parameters categorizing the system are taken to be known. Second considered is the risk due to the fact that parameters in oil field estimates are just estimates and, as such, have their own intrinsic errors that influence the possible outcomes and make them less certain. This sort of risk depends upon the uncertainty of each parameter, and also the type of distribution the parameters are taken to be drawn from. In addition, not all uncertainties in parameter values are of equal importance in influencing an outcome probability. We show how can determine the relative importance for the parameters and so determine where to place effort to resolve the dominant contributions to risk if it is possible to do so. Considerations of whether to acquire new information, and also whether to undertake further studies under such an uncertain environment, are used as vehicles to address these concerns of risk due to uncertainty. In general, an oil filed development project has to contend with all the above types of risk and uncertainty. It is therefore of importance to have quantitative measures of risk so that one can compare and contrast the various effects, and so that corporate decision-makers can use the information in a rational manner as they seek to enhance corporate profit. This paper provides such methods and measures of assessing risk.


1991 ◽  
Vol 14 (1) ◽  
pp. 33-42 ◽  
Author(s):  
C. A. Knutson ◽  
I. C. Munro

AbstractThe Beryl Field, the sixth largest oil field in the UK sector of the North Sea, is located within Block 9/13 in the west-central part of the Viking Graben. The block was awarded in 1971 to a Mobil operated partnership and the 9/13-1 discovery well was drilled in 1972. The Beryl A platform was emplaced in 1975 and the Beryl B platform in 1983. To date, ninety-five wells have been drilled in the field, and drilling activity is anticipated into the mid-1990s.Commercial hydrocarbons occur in sandstone reservoirs ranging in age from Upper Triassic to Upper Jurassic. Structurally, the field consists of a NNE orientated horst in the Beryl A area and westward tilted fault blocks in the Beryl B area. The area is highly faulted and complicated by two major and four minor unconformities. The seal is provided by Upper Jurassic shales and Upper Cretaceous marls.There are three prospective sedimentary sections in the Beryl Field ranked in importance as follows: the Middle Jurassic coastal deltaic sediments, the Upper Triassic to Lower Jurassic continental and marine sediments, and the Upper Jurassic turbidites. The total ultimate recovery of the field is about 800 MMBBL oil and 1.6 TCF gas. As of December 1989, the field has produced nearly 430 MMBBL oil (primarily from the Middle Jurassic Beryl Formation), or about 50% of the ultimate recovery. Gas sales are scheduled to begin in the early 1990s. Oil and gas production is forecast until licence expiration in 2018.The Beryl Fields is located 215 miles northeast of Aberdeen, about 7 miles from the United Kingdom-Norwegian boundary. The field lies within Block 9/13 and covers and area of approximately 12 000 acres in water depths ranging from 350-400 ft. Block 9/13 contains several hydrocarbon-bearing structures, of which the Beryl Fields is the largest (Fig. 1). The field is subdivided into two producing areas: the Beryl Alpha area which includes the initial discovery well, and the Beryl Bravo area located to the north. The estimated of oil originally in place is 1400 MMBBL for Beryl A and 700 MMBBL for Beryl B. The fiel has combined gas in place of 2.8 TCF, consisting primarily of solution gas. Hydrocarbon accumulations occur in six reservoir horizons ranging in age from Upper Triassic to Upper Jurassic. The Middle Jurassic (Bathonian to Callovian) age Beryl Formation is the main reservoir unit and contains 78% of the total ultimate recovery.The field was named after Beryl Solomon, the wife of Charles Solomon, who was president of Mobil Europe in 1972 when the field was discovered. The satellite fields in Block 9/13 (Nevis, Ness and Linnhe) are named after Scottish lochs.


Sign in / Sign up

Export Citation Format

Share Document