Short-term Load Forecasting by Using Improved GEP and Abnormal Load Recognition

2021 ◽  
Vol 21 (4) ◽  
pp. 1-28
Author(s):  
Song Deng ◽  
Fulin Chen ◽  
Xia Dong ◽  
Guangwei Gao ◽  
Xindong Wu

Load forecasting in short term is very important to economic dispatch and safety assessment of power system. Although existing load forecasting in short-term algorithms have reached required forecast accuracy, most of the forecasting models are black boxes and cannot be constructed to display mathematical models. At the same time, because of the abnormal load caused by the failure of the load data collection device, time synchronization, and malicious tampering, the accuracy of the existing load forecasting models is greatly reduced. To address these problems, this article proposes a Short-Term Load Forecasting algorithm by using Improved Gene Expression Programming and Abnormal Load Recognition (STLF-IGEP_ALR). First, the Recognition algorithm of Abnormal Load based on Probability Distribution and Cross Validation is proposed. By analyzing the probability distribution of rows and columns in load data, and using the probability distribution of rows and columns for cross-validation, misjudgment of normal load in abnormal load data can be better solved. Second, by designing strategies for adaptive generation of population parameters, individual evolution of populations and dynamic adjustment of genetic operation probability, an Improved Gene Expression Programming based on Evolutionary Parameter Optimization is proposed. Finally, the experimental results on two real load datasets and one open load dataset show that compared with the existing abnormal data detection algorithms, the algorithm proposed in this article have higher advantages in missing detection rate, false detection rate and precision rate, and STLF-IGEP_ALR is superior to other short-term load forecasting algorithms in terms of the convergence speed, MAE, MAPE, RSME, and R 2 .

2011 ◽  
Vol 219-220 ◽  
pp. 1395-1398
Author(s):  
Yan Mei Li ◽  
Jing Min Wang

Applying the improved gene expression programming arithmetic to optimization plan,the convergence rate and precision of the model can be improved,which can be used to load forecasting. Preprocessing the load sample data,and applying the flexible skills of the improved gene expression programming arithmetic ,the paper forecasts the whole point load of future short-term to see the same point load sequence of different work-day as sample.Through a case analysis,the improved gene expression programming arithmetic has been proved to have more efficiency and faster convergence rate than optimization methods.


Sign in / Sign up

Export Citation Format

Share Document