New construction method of bidirectional associative memory for object recognition

1996 ◽  
Author(s):  
Te-Shin Chen ◽  
Kang-Ping Lin ◽  
Being-Tau Chung
2021 ◽  
Author(s):  
Yingying Li ◽  
Junrui Li ◽  
Jie Li ◽  
Shukai Duan ◽  
Lidan Wang ◽  
...  

2011 ◽  
Vol 368-373 ◽  
pp. 2711-2715 ◽  
Author(s):  
De Yun Ding ◽  
Xiu Ren Yang ◽  
Wei Dong Lu ◽  
Wei Ning Liu ◽  
Mei Yan ◽  
...  

In more and more complicated urban building environment, a new construction method that metro engineering is constructed by large-diameter shield and shallow mining method can be regarded as a great attempt in China. By taking the Gaojiayuan station of Beijing metro line 14 as an engineering background, the main construction steps for the platform of the metro station built by a large-size shield with an outer diameter of 10 m and the Pile-Beam-Arch (PBA) method are introduced. Based on the soil-structure interaction theory, a two-dimensional finite element model is used to simulate the shield tunneling and the platform construction by the PBA method to enlarge the shield tunnel. The ground deformation and structural stress of the platform are predicted. The numerical results can be regarded as a valuable reference for the application of the new construction method in Beijing metro line 14.


Author(s):  
Y Wang ◽  
P Hu

In this paper, the problem of global robust stability is discussed for uncertain Cohen-Grossberg-type (CG-type) bidirectional associative memory (BAM) neural networks (NNs) with delays. The parameter uncertainties are supposed to be norm bounded. The sufficient conditions for global robust stability are derived by employing a Lyapunov-Krasovskii functional. Based on these, the conditions ensuring global asymptotic stability without parameter uncertainties are established. All conditions are expressed in terms of linear matrix inequalities (LMIs). In addition, two examples are provided to illustrate the effectiveness of the results obtained.


Sign in / Sign up

Export Citation Format

Share Document