Fast designing of the circular harmonic filter using simulated annealing

1992 ◽  
Author(s):  
Guy Premont ◽  
Yunlong Sheng
1993 ◽  
Vol 104 (1-3) ◽  
pp. 32-34 ◽  
Author(s):  
Oscar Gualdron ◽  
Henri H. Arsenault

2014 ◽  
Vol 971-973 ◽  
pp. 1752-1755
Author(s):  
Zhan Rong Zhou ◽  
Xuan Ke Zhao ◽  
Chao Shan Liu ◽  
Ai Jun Li

A method of determining expansion center and expansion order is proposed in optical pattern recognition. To the reference image, choose an expansion center of one order, and works out optimal order by means of the expansion center. If the optimal order is equal to the selected order, the selected expansion center and order are the optimum; or else do it again choosing another order. Computer simulation results show that the method yields a sharper correlation peak, higher signal-to-noise ration and better correlation discrimination compared with the circular-harmonic filter.


Author(s):  
Rosnani Ginting ◽  
Chairul Rahmadsyah Manik

Penjadwalan merupakan aspek yang sangat penting karena didalamnya terdapat elemen perencanaan dan pengendalian produksi bagi suatu perusahaan yang dapat mengirim barang sesuai dengan waktu yang telah ditentukan, untuk memperoleh waktu total penyelesaian yang minimum. Masalah utama yang dihadapi oleh PT. ML adalah keterlambatan penyelesaian order yang mempengaruhi delivery time ke tangan costumer karena pelaksanaan penjadwalan produksi dilantai pabrik belum menghasilkan makespan yang sesuai dengan order yang ada. Oleh kaena itu dituntut untuk mencari solusi pemecahan masalah optimal dalam penentuan jadwal produksi untuk meminimisasi total waktu penyelessaian (makespan) semua order. Dalam penelitian ini, penjadwalan menggunakan metode Simulated Annealing (SA) diharapkan dapat menghasilkan waktu total penyelesaian lebih cepat dari penjadwalan yang ada pada perusahaan.   Scheduling is a very important aspect because in it there are elements of planning and production control for a company that can send goods in accordance with a predetermined time, to obtain a minimum total time of completion. The main problem faced by PT. ML is the delay in completing orders that affect delivery time to customer because the implementation of production scheduling on the factory floor has not produced the makespan that matches the existing order. Therefore, it is required to find optimal problem solving solutions in determining the production schedule to minimize the total time of elimination (makespan) of all orders. In this study, scheduling using the Simulated Annealing (SA) method is expected to produce a total time of completion faster than the existing scheduling in the company.


Sign in / Sign up

Export Citation Format

Share Document