Economy Analysis of Electricity Production From Hydrogen in Combination With Nuclear Power Plant

Author(s):  
Jurij Avsec ◽  
Peter Virtic´ ◽  
Tomazˇ Zˇagar ◽  
Luka Sˇtrubelj

Efficient and sustainable methods of clean fuel and energy production are needed in all countries of the world in the face of depleting oil reserves and the need to reduce carbon dioxide emissions. Some countries are developing technologies that could be named zero carbon technologies. The presented article will show how hydrogen technologies could be implemented with renewable technologies and nuclear technology. Nuclear technology produce very cheap electricity and could produce also cheap energy like heat and vapour. This technology should be used in nuclear power plants to develop other products like hydrogen, biofuels or district heating. One of the biggest opportunities for nuclear energy technology is to produce hydrogen. Some countries like Canada and US are in preparation to build hydrogen villages. However, a key missing element is a large-scale method of hydrogen production [1–5]. As a carbon-based technology, the predominant existing process (steam-methane reforming (SMR)) is unsuitable. This paper focuses on a production of hydrogen in connection with a nuclear power plant. We will show the technologies which allow the coupling between a nuclear power plant and hydrogen technologies.

2014 ◽  
Vol 521 ◽  
pp. 530-535
Author(s):  
Meng Wang ◽  
Jian Ding ◽  
Tian Tang ◽  
Zhang Sui Lin ◽  
Zhen Da Hu ◽  
...  

The current situation of nuclear power plants at home and abroad is described, and the impact of large-scale nuclear power accessing to the grid is analyzed, specifically in the aspects of nuclear power modeling, simulation, load following, reliability, fault diagnosis, etc. Nuclear power accessing to the grid will bring a series of problems, the causes of each problem, the main solutions and future development directions are summarized.


2019 ◽  
Vol 5 (2) ◽  
pp. 177-182
Author(s):  
Akbar Abbasi ◽  
Fahreddin Sadikoglu

Nowadays, Nuclear Power Plant (NPP) is one of the intended energy resources for the world requirement energy in future, and nuclear power plants provided 11 percent of the world’s electricity production in 2014. Meanwhile, nuclear power plant safety has always been one of the most critical issues in the world. In this paper, the nuclear power plant safety improvement using Soft Computing Techniques were analyzed. For this purpose, the support system based on Neuro-Fuzzy Diagnosis System (NFDs) method and Genetic Algorithms (GAs) approach were used. The obtained result showed that the first symptom is P3 (pressurizer pressure) and second order symptom is P2 (core coolant average temperature) in both approaches. The comparison between the NFDs method and the GAs approaches indicated that the GAs in data test results was faster than the NFDs results.


2014 ◽  
Vol 986-987 ◽  
pp. 315-321
Author(s):  
Wen Bin Xiong ◽  
Hou Ming Zhang ◽  
Bo Ping Zhang ◽  
Hu Wei Li ◽  
Gang Wang ◽  
...  

In recent years, advanced small nuclear power reactors, namely small modular reactors (SMRs), gained widespread attention. In areas where energy can’t be provided by large scale reactors and the nuclear power plants with large scale reactors can’t compete with the non-nuclear power plant technology, SMRs, as a versatile distributed integrated energy source, which result in expanding peaceful applications of nuclear energy, have enormous potential. This article describes the characteristics and analyzes prospects and challenges of SMRs.


Author(s):  
Takashi Kamei

Even after the huge impact of Fukushima Daiichi nuclear power plant accident, Japan has to establish its energy supply system satisfying requirements of both global warming and resistibility of natural disaster. Nuclear power has a potential to reduce carbon emission but large-scale and centralized nuclear power plant may lose large volume of electricity supply at once. Small-scale nuclear power plants will bring solution in Japan. Thorium molten-salt reactor (MSR) is selected to simulate implementation capacity of small reactors in Japan. In order to use thorium as nuclear fuel, fissionable isotope is indispensable since natural thorium does not include fissile material. Japan owns plutonium in spent nuclear fuel of uranium usage. Quantitative evaluation of implementing capacity of thorium MSR in Japan by using plutonium accumulated in Japan. Implementation capacity of thorium MSR will be about 38 GWe and 11.2 GWe in the maximum and minimum cases at 2050, respectively.


Author(s):  
Qingming Yang

With the improvement of nuclear technology and nuclear safety, accidental operating procedure, as an important component of the defence in depth concept for nuclear power plant operation, develops in the way of being more robust and more operator-friendly, especially following the Three Miles Island accident. In China, nuclear power plants try to change from Event Oriented Procedure (EOP) to State Oriented Procedure (SOP) which is a scenario independent approach, developed by French institutes. This paper tries to discuss the principle of the state oriented approach and the composition of SOP. At the same time, comparison between SOP and EOP is made. Having understood the bases of SOP, China Nuclear Power Plants apply it from design to implementation appropriately only.


Author(s):  
D. Sitnikovas ◽  
G. Denafas ◽  
R. Vaikšnorienė ◽  
A. Galinis ◽  
D. Štreimikienė ◽  
...  

Prognosis of environmental quality in Baltic states related with the closure of Ignalina Nuclear Power Plant according to two electricity production scenarios was made. (Scenario 1 - closure date of Block 1 is 2005, closure date of Block 2 is 2011; Scenario 2 - closure date of Block 1 is 2005, exploitation of Block 2 will be extended at least until 2020.) We can see that in accordance with both scenarios CO2 an SO2 emission will increase every year. Although the influence of the largest air pollution sources such as Estonian/Baltic PP, Lithuanian PP Riga CHP and others remains very significant to the situation in Baltic States, new power plants will forward the rise of total emission.


2020 ◽  
Vol 39 (5) ◽  
pp. 6339-6350
Author(s):  
Esra Çakır ◽  
Ziya Ulukan

Due to the increase in energy demand, many countries suffer from energy poverty because of insufficient and expensive energy supply. Plans to use alternative power like nuclear power for electricity generation are being revived among developing countries. Decisions for installation of power plants need to be based on careful assessment of future energy supply and demand, economic and financial implications and requirements for technology transfer. Since the problem involves many vague parameters, a fuzzy model should be an appropriate approach for dealing with this problem. This study develops a Fuzzy Multi-Objective Linear Programming (FMOLP) model for solving the nuclear power plant installation problem in fuzzy environment. FMOLP approach is recommended for cases where the objective functions are imprecise and can only be stated within a certain threshold level. The proposed model attempts to minimize total duration time, total cost and maximize the total crash time of the installation project. By using FMOLP, the weighted additive technique can also be applied in order to transform the model into Fuzzy Multiple Weighted-Objective Linear Programming (FMWOLP) to control the objective values such that all decision makers target on each criterion can be met. The optimum solution with the achievement level for both of the models (FMOLP and FMWOLP) are compared with each other. FMWOLP results in better performance as the overall degree of satisfaction depends on the weight given to the objective functions. A numerical example demonstrates the feasibility of applying the proposed models to nuclear power plant installation problem.


2019 ◽  
Vol 7 (2B) ◽  
Author(s):  
Vanderley Vasconcelos ◽  
Wellington Antonio Soares ◽  
Raissa Oliveira Marques ◽  
Silvério Ferreira Silva Jr ◽  
Amanda Laureano Raso

Non-destructive inspection (NDI) is one of the key elements in ensuring quality of engineering systems and their safe use. This inspection is a very complex task, during which the inspectors have to rely on their sensory, perceptual, cognitive, and motor skills. It requires high vigilance once it is often carried out on large components, over a long period of time, and in hostile environments and restriction of workplace. A successful NDI requires careful planning, choice of appropriate NDI methods and inspection procedures, as well as qualified and trained inspection personnel. A failure of NDI to detect critical defects in safety-related components of nuclear power plants, for instance, may lead to catastrophic consequences for workers, public and environment. Therefore, ensuring that NDI is reliable and capable of detecting all critical defects is of utmost importance. Despite increased use of automation in NDI, human inspectors, and thus human factors, still play an important role in NDI reliability. Human reliability is the probability of humans conducting specific tasks with satisfactory performance. Many techniques are suitable for modeling and analyzing human reliability in NDI of nuclear power plant components, such as FMEA (Failure Modes and Effects Analysis) and THERP (Technique for Human Error Rate Prediction). An example by using qualitative and quantitative assessesments with these two techniques to improve typical NDI of pipe segments of a core cooling system of a nuclear power plant, through acting on human factors issues, is presented.


Electronics ◽  
2020 ◽  
Vol 9 (9) ◽  
pp. 1467
Author(s):  
Sangdo Lee ◽  
Jun-Ho Huh ◽  
Yonghoon Kim

The Republic of Korea also suffered direct and indirect damages from the Fukushima nuclear accident in Japan and realized the significance of security due to the cyber-threat to the Republic of Korea Hydro and Nuclear Power Co., Ltd. With such matters in mind, this study sought to suggest a measure for improving security in the nuclear power plant. Based on overseas cyber-attack cases and attacking scenario on the control facility of the nuclear power plant, the study designed and proposed a nuclear power plant control network traffic analysis system that satisfies the security requirements and in-depth defense strategy. To enhance the security of the nuclear power plant, the study collected data such as internet provided to the control facilities, network traffic of intranet, and security equipment events and compared and verified them with machine learning analysis. After measuring the accuracy and time, the study proposed the most suitable analysis algorithm for the power plant in order to realize power plant security that facilitates real-time detection and response in the event of a cyber-attack. In this paper, we learned how to apply data for multiple servers and apply various security information as data in the security application using logs, and match with regard to application of character data such as file names. We improved by applying gender, and we converted to continuous data by resetting based on the risk of non-continuous data, and two optimization algorithms were applied to solve the problem of overfitting. Therefore, we think that there will be a contribution in the connection experiment of the data decision part and the optimization algorithm to learn the security data.


2021 ◽  
Author(s):  
S. W. Glass ◽  
Leonard S. Fifield ◽  
Mychal P. Spencer

Abstract Nuclear power plant cables were originally qualified for 40 year life and generally have not required specific test verification to assure service availability through the initial plant qualification period. However, license renewals to 60 and 80 years of operation require a cable aging management program that depends on some form of test and verification to assure fitness for service. Environmental stress (temperature, radiation, chemicals, water, and mechanical) varies dramatically within a nuclear power plant and, in some cases, cables have degraded and required repair or replacement before their qualified end-of-life period. In other cases, cable conditions have been mild and dependable cable performance confirmed to extend well beyond the initial qualified life. Most offline performance-based testing requires cables to be decoupled and de-energized for specially trained technicians to perform testing. These offline tests constitute an expensive operational burden that limits the economic viability of nuclear power plants. Although initial investment may be higher, new online test practices are emerging as options or complements to offline testing that avoid or minimize the regularly scheduled offline test burden. These online methods include electrical and fiber-optic partial discharge measurement, spread spectrum time or frequency domain reflectometry, distributed temperature profile measurements, and local interdigital capacitance measurement of insulation characteristics. Introduction of these methods must be supported by research to confirm efficacy plus either publicly financed or market driven investment to support the start-up expense of cost-effective instrumentation to monitor cable condition and assure reliable operation. This work summarizes various online cable assessment technologies plus introduces a new cable motor test bed to assess some of these technologies in a controlled test environment.


Sign in / Sign up

Export Citation Format

Share Document