Best Practices for the Strain Relief Excavation by Geotechnical Movements in Ocensa
This article aims to describe the best industry practices followed by the line maintenance area of the Ocensa pipeline, which can be divided into 4 large steps that follow a PHVA cycle of the activity, which includes relief planning, the execution of the same, the verification and geotechnical monitoring, closure and feedback.