Chasing Perfection: The Proactive IMP PDCA (+E) Review

Author(s):  
Phillip Nidd ◽  
Terence Thorn ◽  
Monica K. Porter

Aiming for zero — zero leaks, zero ruptures, zero third party damage hits, zero-harm to the public may be considered by some to be unrealistic, but it is definitely a goal worth chasing. Striving for this level of perfection is key in achieving pipeline operational excellence and avoiding operational mediocrity. Central to safe operations is a pipeline integrity management plan (IMP) that establishes processes for assessing and mitigating risk within a framework structured to ensure the long-term integrity of pipeline system assets. When properly implemented in compliance with regulation and industry practice, an IMP will reduce both the likelihood and consequences of incidents. It remains the cornerstone in the management of pipeline risk and safety performance and is critical in preventing system failures, injuries, property damage, and other serious consequences. But a sustainable process for managing risk and improving performance must go beyond relying on regulatory compliance and following generic industry practices. In this respect, too often IMPs are judged only from a compliance perspective that provides little insight into how well the IMP is being executed or whether the management systems are actually effective. Integrity management can also be examined in context of the larger corporate culture and with the specific corporate processes that impact employees’ decisions and behaviors in ways that transcend procedures printed in a manual. A culture of adherence to compliance as an ultimate goal can lead to complacency, and a company cannot achieve a zero incident level adhering only to regulations. The focus on meeting regulatory requirements should be replaced by an integrated broader view on risk management derived in part from emerging industry best practices and standards. Benchmarking against these standards can establish a performance baseline, identify opportunities for improvements, set targets, measure performance, and instill a continuous improvement process. An approach to assess the degree to which an IMP is regulatory compliant, technically adequate, implemented and effective is to apply a “Plan,” “Do,” “Check,” “Act” (PDCA) based approach. This framework, while confirming basic regulatory compliance, also allows an operator to determine the degree to which the IMP is being executed in alignment with corporate management system objectives and accepted best practice guidelines relating to the 4 P’s — “People, Process, Product and Performance.” When applied as the basis for an extra stage “E” review, this PDCA process helps determine the health and risk-reducing “effectiveness” of the IMP through application of record reviews, subject matter expertise, supporting personnel interviews, industry consensus standard benchmarking and assessment of lagging and / or leading indicators as follows: • Are the workflows required to satisfy IMP objectives and the corresponding personnel accountabilities clearly defined? • Are technical procedures in place to meet IMP objectives and satisfy IMP work flow requirements? • Are the procedures adequate, up to date and readily available to integrity management personnel? • Have the procedures been effectively implemented? • Are records indicating work flow process completion available? • Is a management of change process embedded within the procedure and work flow process? • Is there a process to receive input from personnel to provide suggestions for continuous improvement? • Is the IMP as structured and implemented in alignment with corporate management system and enterprise risk management objectives? • Is the IMP effective in reducing pipeline risk and providing a sound and defensible basis for risk-based decisions and investment planning? Traditional integrity management provides focus on assessing risks and addressing those risks through mitigation activities, while ensuring compliance with laws and regulations designed to continually improve safety. The challenge today is to go beyond determining if an IMP is simply in compliance. An effective risk management system is one where there is a strong safety culture; decisions at all levels of the organization are based on an understanding and consideration of risks; there is continuous monitoring of risk levels and adjustment of responses; and continuous improvement is embedded in the procedures and processes.

Author(s):  
Mario Pezzi Filho ◽  
Jose´ Flavio A. Carvalho ◽  
Mike Gloven ◽  
Elaine Hendren ◽  
Steve Gosse

This paper covers some challenges encountered in the development of a risk management system for onshore natural gas and hazardous liquid pipelines. This system is based on the premises of PID – Petrobras Pipeline Integrity Management Program that defines rules for risk calculation and risk mitigation actions to be carried out whenever risk is above a level defined as tolerable. Commercial risk assessment software was customized to PID and is being upgrade with an algorithm able to assist in optimizing risk mitigation projects based on proposed scenarios. This study presents the challenges and benefits of implementing such a risk management system on a prototype pipeline system and the difficulties faced along the development of a scenario optimization algorithm, which is still in progress at the date of its publication.


2020 ◽  
Vol 8 (1) ◽  
pp. 895-906
Author(s):  
Herlinawati Herlinawati ◽  
Anang Sofyan Zulfikar

Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) adalah bagian dari sistem manajemen perusahaan secara keseluruhan dalam rangka pengendalian risiko yang berkaitan dengan kegiatan kerja guna terciptanya tempat kerja yang aman, efisien dan produktif. Dikeluarkan PP RI Nomor 50 Tahun 2012 tentang Penerapan Sistem Manajeman Keselamatan dan Kesehatan Kerja, pasal 5 UU tersebut mewajibkan setiap perusahaan menerapkan SMK3 di perusahaanya, berlaku bagi perusahaan yang mempekerjakan pekerja/buruh paling sedikit 100 (seratus) orang atau mempunyai tingkat potensi bahaya tinggi. Tujuan penelitian ini adalah untuk mengetahui analisis penerapan Sitem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) di PT Japfa Comfeed Indonesia Tbk Unit Cirebon Tahun 2016. Jenis penelitian yang digunakan adalah kualitatif dengan metode penelitian studi kasus, teknik pengambilan sampel menggunakan purposive sampling dan Snowball Sampling dengan sampel yaitu Kepala Unit, Kepala seksi K3LH, Ka.Sub.Dept. Teknik, Operator IPAL dan Personil Security, pengumpulan data dengan cara wawancara mendalam sedangkan instrumen yang digunakan berupa kuesioner, lembar chek list serta dokumentasi dan recorder. Hasil penelitian ini adalah secara umum penerapan SMK3 di PT Japfa Comfeed Indonesia Tbk Unit Cirebon hampir semua kriteria terpenuhi namun ada beberapa kriteria yang belum terpenuhi. Penerapan penetapan kebijakan K3, penerapan perencanaan K3, penerapan pelaksanaan rencana K3 hampir semua kriteria terpenuhi namun ada beberapa kriteria yang belum terpenuhi dan pemantauan dan evaluasi kinerja K3 sudah terpenuhi semua.Kata kunci              : Analisis, Penerapan SMK3   ABSTRACTOccupational Health and Safety Management System  are part of corporate management system as a whole in order to operation run the risk that gets bearing with utilised job activity most composes safe workshop it, efficient and productive. Issued by PP RI Number 50 Years 2012 about Manajeman's System Implement safety and job healths, section 5 UU that makes compulsory one each company apply  SMK3 at company, apply to firm that employ employ / least labour 100 (a hundred) person or has tall lurching potency zoom. To the effect this research is subject to be knowanalisis is Sitem's implement Occupational Health and Safety Management System  at PT Japfa Comfeed Indonesian Tbk Unit Cirebon Year 2016 .Observational type that is utilized is kualitatif by methodics case study research, its sample utilizes purposive is sampling and Snowball Sampling  which is Section Head K3LH, Ka.Sub.Dept is Tech, WWTP Operator and Security Personnel data collection by way of depth interviews while the instrument used a questionnaire, sheet chekc list documentation and recorder. The results of this study are in general application SMK3 in PT Japfa Comfeed Indonesian Tbk Unit Cirebon almost all the criteria are met, but there are several criteria that have not been fulfilled. Implementation of the policy-setting K3, K3 planning application, the application of the implementation plan K3 almost all the criteria are met, but there are several criteria that have not been fulfilled, and the monitoring and evaluation of the performance of the K3 has fulfilled all.Key words            : Analisis, The Application Of SMK3  


Author(s):  
Kanako Kitayama ◽  
Christopher Williams ◽  
Seijiro Takeshita

This study explores the relationship between Japanese corporate governance and internationalization strategy by looking at the cases of Suntory and Kirin Breweries. It examines the internationalization activities of the two companies from 1980 to 2015. We find that executing an international strategy can impact the corporate governance of Japanese brewers, especially where the brewer already had pre-existing diversity in its management system. We argue that absorptive capacity allows the brewing company to transform its corporate governance on the basis of its internationalization. Our analysis also suggests that rejuvenation of the firms’ corporate management system can be a motive for expanding abroad in the brewing sector, something that has not been identified in prior research.


Author(s):  
M. Robb Isaac ◽  
Saleh Al-Sulaiman ◽  
Monty R. Martin ◽  
Sandeep Sharma

In early 2005, Kuwait Oil Company (KOC) initiated a Total Pipeline Integrity Management System (TPIMS) implementation in order to carry out a major integrity assessment of its operating facilities, equipment, buried plant piping and pipeline network and to establish a continuing integrity management program. KOC Transit System is a complex infrastructure consisting of over three hundred pipelines, thousands of wellhead flow lines, and consumer and offshore lines for which there was a significant loss of data when the facilities were destroyed during a military invasion in 1990. An initial pipeline system assessment identified issues and actions regarding condition of the pipelines, corridors, requirements on in-line inspection (ILI), documentation, RISK assessment, status of international code compliance, and overall state of the system. Following recommendations from that initial assessment led to the development of a long term strategy; the execution of which required the implementation of a comprehensive integrity management program. This case study discusses the results obtained after five years of implementation of TPIMS at KOC. It will demonstrate some of the complex components involved in managing the integrity of the Transit System that have been made possible through the implementation of the system. The general concept and structure of TPIMS will be described, and how it deals with the complexity of the KOC pipeline system. The system made it possible to integrate and manage data from various sources, by conducting integrity assessment using ILI, Direct Assessment and hydrostatic testing, as well as structure a comprehensive RISK & Decision Support mechanism. This is one of the world’s first implementations of this magnitude which encompasses such a wide range of services and variables; all being managed in a single environment and utilized by a multitude of users in different areas at KOC. The biggest challenge in a project of this scope is data management. Examples will be shown of the integration structure to illustrate the benefits of using a single comprehensive and versatile platform to manage system requirements; ultimately providing system reliability and improving overall operational efficiency.


BMJ ◽  
2013 ◽  
Vol 346 (jan15 4) ◽  
pp. f212-f212
Author(s):  
C. C. Lees

2020 ◽  
Vol 15 (2) ◽  
pp. 321-326
Author(s):  
M. Capela ◽  
A. Santos ◽  
A. Luís

Abstract In the second half of the 2000s, EPAL developed an integrated approach to asset management, designed according to the logic of PAS 55. Since then, asset management has been recognized as an invaluable function within the company and the portfolio of measures identified in the above-mentioned integrated approach has been implemented. With the release, in 2014, of ISO 55001, certification of the asset management system was made possible. Given the work already developed towards the deployment of asset management at EPAL, and because this had been based in the PAS 55 philosophy, EPAL was well positioned to obtain the ISO certification. The key challenges regarding the above-mentioned process were associated more with the implementation of the asset management at EPAL, rather than with the certification in itself. Because asset management was already an established practice at EPAL, key benefits of the certification are related to the documentation of such practice, which is something very important that was missing. Preparing for the certification also enabled the redesign of the Corporate Management System in order to meet the ISO and appendix SL requirements, making it more robust. And, of course, ISO 55001 certification became an asset in terms of image and reputation for EPAL!.


Author(s):  
Reena Sahney ◽  
Mike Reed ◽  
Darren Skibinsky

The Canadian Energy Pipeline Association (CEPA) is a voluntary, non-profit industry association representing major Canadian transmission pipeline companies. With the advent of changes in both CSA Z6621 as well as the National Energy Board Onshore Pipeline Regulations (OPR)2, the membership determined a Recommended Practice regarding a Management Systems Approach for Facilities Integrity was needed. As such, the Pipeline Integrity Working Group (PIWG) within CEPA formed a task group to support the initiative. The outlined approach was intended to have two main philosophical underpinnings: it must comprehensively support safe pipeline system operations and it must provide a practical mechanism for implementing a management systems approach for Facilities Iintegrity. The main challenge in developing a framework for a Facilities Integrity Management System lies in the broad range of equipment and system types that the management system must encompass. That is, equipment, in the context of Facilities Integrity Management, must encompass not only station equipment (such as rotating equipment, valves, meters etc.,) but also categories such as high pressure station piping and fuel lines. Further, there was the recognition that Operators already have an array of tools, processes and techniques in place to manage their various equipment and systems. In light of these observations, the Recommended Practice describes a framework that uses major equipment types as a key differentiator. This is an approach that can be easily aligned with existing corporate computerized maintenance management systems (CMMS) such as SAP™ or Maximo™. Once the equipment categorization has been established, the Recommended Practice then provides guidance regarding the specific requirements that should be addressed for each equipment category based on the framework in CSA Z662-11 Annex N. Specific suggestions are provided in the areas of: alignment with corporate goals and objectives, scope, definitions, performance metrics, risk assessments, competency of personnel, change management as well as documentation. The approach also maximizes the opportunity to leverage existing systems and processes to the extent possible. Overall the Recommended Practice should provide operators with a practical way to achieve a greater degree of rigor and alignment of facilities integrity management while ensuring detailed study and analysis is focused in the most appropriate areas.