Development of Global Contract for In-Line Inspection

Author(s):  
Stephen R. Gower ◽  
Jude Moore

In-Line inspection has increasingly been used across the oil and gas industry over the past 30 years as a key part of pipeline integrity programmes. Whilst the industry has started to develop standards through the ILI Association and the Pipeline Operators Forum the way in which the industry selects tools and contractors has not developed to the same extent. A significant amount of time is spent managing the procurement process rather than focusing on the selection of the right tools and ensuring they perform to expectations. The challenge is further exacerbated when operations are dispersed globally and involve many different operating relationships. BP has been a user of ILI technology since its introduction in the late 1970s and it has consistently grown in importance to BP in managing the integrity of an aging pipeline asset base. In 2006/2007 BP’s Exploration and Production Technology Group (EPTG) in conjunction with the Procurement and Supply Chain Management group (PSCM) carried out a review of its procurement arrangements across the globe for pipeline ILI to ascertain best practice and capture key lessons. It also gathered experience from other strategic long term supply chain initiatives around the BP Group to help inform and develop the ILI strategy. Early discussions held with ILI Suppliers confirmed that, whilst regional frameworks have been in place in some countries, extending this to a global operation would be breaking new ground in engaging ILI services and would be of benefit to both ends of the supply chain. The process not only needed to follow rigorous supply chain procedures that would meet EU Procurement Directives and BP Group requirements, it also had to meet the specific requirements of many Countries around the world. It was recognised that flexibility would be required to accommodate the introduction of new tools, developing technology and accommodate new areas of operation. BP also wanted to stimulate continuous improvement in ILI tool performance and application of innovative improved technology. More significantly a key objective of the Global Contract was to drive inspection quality and consistency, whilst maintaining a competitive but equitable pricing strategy. Successful implementation was not just about delivering a contract scope of work; it required the development of relationships and a common understanding so that when problems arise they can be resolved quickly and efficiently. This required a significant amount of work engaging both the ILI Contractors and Operating Units across the world in the process. Work on developing the Global ILI Contract was successfully concluded with contract awards in late 2007. The paper explores some of the challenges, lessons learnt and benefits of developing a Global Contract for ILI.

2018 ◽  
Vol 4 (5-6) ◽  
pp. 223-264
Author(s):  
Carolina Barreira Lins

This work examines the subject of jurisdiction and arbitrability of issues related to energy and natural resources in the world, in order to enhance the arbitration institute in Brazil. The study is based on a recent case pending in Brazilian courts, named “Lula case”, which refer to a dispute between the State and concessionaires that grant the right to explore and produce oil and gas in a determined area. The presence of arbitration clauses in the concession contracts for exploration and production of oil and gas in Brazil raises questions related to the disposability of the rights concerned. It is paramount to set benchmarks on arbitral tribunals’ power to decide on these matters and to define to what extent arbitral awards may defy public policy, national sovereignty over natural resources and national courts’ jurisdiction to render decisions in this regard. Otherwise, the randomness of judicial decisions makes the arbitration clause ineffective. Moreover, the Lula case arises substantive issues related to the necessity to protect investors in the oil and gas industry, since acts arguably connect to the State policy power may cause damages to the private parties. The work critically examines the decision given by national courts so far and proposes an international approach to face situations involving the State and the necessity to protect investors in the oil and gas industry.


Author(s):  
Nguyen Thi Duc Nguyen ◽  
Le Tran Chinh

This study aims to: (1) Summarize the criteria for selecting 3PL Provider in supply chain management from literature review and apply these criteria to build the criteria model in choosing 3PL Provider for oilfield services company X for the purpose of expanding their market in the oil and gas industry and (2) Analyze, evaluate two 3PL Providers, along with a new 3PL Provider and suggest the strategy for selecting the suitable 3PL Provider to meet the specific requirements from company X. By arranging in-depth interviews with ten people with different positions, including Operation Manager, Supply Chain Manager, Logistics Manager, Base Manager and Logistics Specialist, along with AHP approach and expert choice 11.0 software support in collecting, processing and synthesizing data to evaluate and determine the appropriate 3 PL Provider for company X. In this study, three 3PL Providers have been chosen for analyzing and evaluating – 3PL Providers A, B, and C. The final results demonstrate that there are six main criteria and 13 sub-criteria in choosing 3PL Provider for oilfield services company X. The six main criteria are Performance, Price, Services, Quality assurance, IT system and Intangible values. The results and hypothetical situations have also been presented and discussed again with the expert logistics group to get their feedback about the practicability of the built model. The expert logistics group has agreed that the built criteria model and results are appropriate and adequate for evaluating and selecting a suitable 3PL Provider from the company’s specific demands. Consequently, this study can also be applied for similar purposes in other companies and shipping agents who need to work with outsourcing logistics services in oil and gas industry by using this built criteria model and synthesis results to find out the right decision for selecting 3PL Provider.


2018 ◽  
Vol 4 (5-6) ◽  
pp. 223-264
Author(s):  
Carolina Barreira Lins

This work examines the subject of jurisdiction and arbitrability of issues related to energy and natural resources in the world, in order to enhance the arbitration institute in Brazil. The study is based on a recent case pending in Brazilian courts, named “Lula case”, which refer to a dispute between the State and concessionaires that grant the right to explore and produce oil and gas in a determined area. The presence of arbitration clauses in the concession contracts for exploration and production of oil and gas in Brazil raises questions related to the disposability of the rights concerned. It is paramount to set benchmarks on arbitral tribunals’ power to decide on these matters and to define to what extent arbitral awards may defy public policy, national sovereignty over natural resources and national courts’ jurisdiction to render decisions in this regard. Otherwise, the randomness of judicial decisions makes the arbitration clause ineffective. Moreover, the Lula case arises substantive issues related to the necessity to protect investors in the oil and gas industry, since acts arguably connect to the State policy power may cause damages to the private parties. The work critically examines the decision given by national courts so far and proposes an international approach to face situations involving the State and the necessity to protect investors in the oil and gas industry.


2021 ◽  
Vol 5 (3) ◽  
pp. 54-68
Author(s):  
Oluwarotimi Odunayo Akintokunbo ◽  
Biebele Emmanuel Arimie

Nigeria has abundant deposit and supply of accessible crude oil and gas resources and it remains the mainstay of her economy. The oil and gas industry in Nigeria is a part of the global oil and gas market which depends on effective and efficient supply-chain management system for the seamless procurement of goods and services (domestic and international), logistics, operations and production management, warehousing, storage of goods from organisations supplier’s suppliers to the customer’s customers with the help of adequate use of modern information and communication technology. The purpose of this study was to examine supply chain management: a game changer in the oil and gas industry in Nigeria. The paper is largely a literature review, hence a desk research methodology was adopted. The paper revealed that the industry offers a classic model for changing the competition game in the sector through a lean, innovative and environmentally sustainable integrated supply chain management system, as today’s competition is no longer between organizations, but among supply chains that compete to reduce their cost of acquisition, production, logistics and warehousing along the chain while delivering customers products and services of quality at the right time, quantity and quality, at the right place and total cost, and creating value throughout the chain.


2017 ◽  
Vol 4 (5-6) ◽  
pp. 223-264
Author(s):  
Carolina Barreira Lins

This work examines the subject of jurisdiction and arbitrability of issues related to energy and natural resources in the world, in order to enhance the arbitration institute in Brazil. The study is based on a recent case pending in Brazilian courts, named “Lula case”, which refer to a dispute between the State and concessionaires that grant the right to explore and produce oil and gas in a determined area. The presence of arbitration clauses in the concession contracts for exploration and production of oil and gas in Brazil raises questions related to the disposability of the rights concerned. It is paramount to set benchmarks on arbitral tribunals’ power to decide on these matters and to define to what extent arbitral awards may defy public policy, national sovereignty over natural resources and national courts’ jurisdiction to render decisions in this regard. Otherwise, the randomness of judicial decisions makes the arbitration clause ineffective. Moreover, the Lula case arises substantive issues related to the necessity to protect investors in the oil and gas industry, since acts arguably connect to the State policy power may cause damages to the private parties. The work critically examines the decision given by national courts so far and proposes an international approach to face situations involving the State and the necessity to protect investors in the oil and gas industry.


2005 ◽  
Vol 45 (1) ◽  
pp. 213
Author(s):  
M.R. Puzey ◽  
S.Q. Benson

The objective of this paper is to provide food for thought to executives on how governance initiatives can deliver value—and not just be a compliance cost—with the focus on oil and gas organisations in Australia.We have seen increased governance legislation around the world following the collapse of companies such as Enron. In Australia we have the ASX governance principles.We will explore the lessons learnt from the implementation of compliance by US-listed companies with their Sarbanes-Oxley legislation and what it means to us in Australia.Governance initiatives can be costly—there is, therefore, a need for us to leverage off these initiatives, driving business value where we can, by proactively focussing in the right areas.This paper focusses on practical suggestions for obtaining value from governance initiatives, and is accessible to readers without a strong financial background.


2018 ◽  
Vol 4 (5-6) ◽  
pp. 223-264
Author(s):  
Carolina Barreira Lins

This work examines the subject of jurisdiction and arbitrability of issues related to energy and natural resources in the world, in order to enhance the arbitration institute in Brazil. The study is based on a recent case pending in Brazilian courts, named “Lula case”, which refer to a dispute between the State and concessionaires that grant the right to explore and produce oil and gas in a determined area. The presence of arbitration clauses in the concession contracts for exploration and production of oil and gas in Brazil raises questions related to the disposability of the rights concerned. It is paramount to set benchmarks on arbitral tribunals’ power to decide on these matters and to define to what extent arbitral awards may defy public policy, national sovereignty over natural resources and national courts’ jurisdiction to render decisions in this regard. Otherwise, the randomness of judicial decisions makes the arbitration clause ineffective. Moreover, the Lula case arises substantive issues related to the necessity to protect investors in the oil and gas industry, since acts arguably connect to the State policy power may cause damages to the private parties. The work critically examines the decision given by national courts so far and proposes an international approach to face situations involving the State and the necessity to protect investors in the oil and gas industry.


2020 ◽  
Vol 26 (1) ◽  
pp. 35-45 ◽  
Author(s):  
A. G. Kazanin

The modern oil and gas industry is heavily dependent on the processes and trends driven by the accelerating digitalization of the economy. Thus, the digitalization of the oil and gas sector has become Russia’s top priority, which involves a technological and structural transformation of all production processes and stages.Aim. The presented study aims to identify the major trends and prospects of development of the Russian oil and gas sector in the context of its digitalization and formation of the digital economy.Tasks. The authors analyze the major trends in the development of the oil and gas industry at a global scale and in Russia with allowance for the prospects of accelerated exploration of the Arctic; determine the best practices of implementation of digital technologies by oil and gas companies as well as the prospects and obstacles for the subsequent transfer of digital technologies to the Russian oil and gas industry.Methods. This study uses general scientific methods, such as analysis, synthesis, and scientific generalization.Results. Arctic hydrocarbons will become increasingly important to Russia in the long term, and their exploration and production will require the implementation of innovative technologies. Priority directions for the development of many oil and gas producers will include active application of digital technologies as a whole (different types of robots that could replace people in performing complex procedures), processing and analysis of big data using artificial intelligence to optimize processes, particularly in the field of exploration and production, processing and transportation. Digitalization of the oil and gas sector is a powerful factor in the improvement of the efficiency of the Russian economy. However, Russian companies are notably lagging behind in this field of innovative development and there are problems and high risks that need to be overcome to realize its potential for business and society.Conclusions. Given the strategic importance of the oil and gas industry for Russia, its sustainable development and national security, it is recommendable to focus on the development and implementation of digital technologies. This is crucial for the digitalization of long-term projection and strategic planning, assessment of the role and place of Russia and its largest energy companies in the global market with allowance for a maximum number of different internal and external factors.


Author(s):  
Angus Bowie

Double Block and Bleed is a term often used in the oil and gas industry to define a level of isolation sufficient to perform maintenance activities. The true definition relates to incumbent valves providing two proven levels of isolation against the outboard pressure to permit breaching of containment in the isolated pipe. This paper assesses how temporary isolation devices can provide equivalent isolation where incumbent valves do not exist at appropriate locations in the system. It reviews the different interpretations of Double Block and Bleed used within the industry and compares how different isolation devices are assessed in relation to the level of isolation they provide. It will reference several examples from around the world of where temporary isolation devices have been used to replace valves and perform repairs in trunk pipelines without depressurising the whole pipeline. It will also cover examples of isolating live process pipe to perform maintenance activities outside plant shutdown.