Modeling Characteristics of an Operational Probabilistic Safety Assessment (PSA)

Author(s):  
Richard C. Anoba ◽  
Yehia Khalil ◽  
J. J. Fluehr ◽  
Richard Kellogg ◽  
Alan Hackerott

Probabilistic Safety Assessments (PSAs) are increasingly being used as a tool for supporting the acceptabilty of design, procurement, construction, operation, and maintenance activities at nuclear power plants. Since the issuance of Generic Letter 88-20 [1] and subsequent Individual Plant Examinations (IPEs)/Individual Plant Examinations for External Events (IPEEEs) [2], the NRC has issued several Regulatory Guides such as RG 1.182 [3] to describe the use of PSA in risk informed regulation activities. The PSA models developed for the IPEs were typically based on a “snapshot” of the the risk profile at the nuclear power plant. The IPE models contain implicit assumptions and simplifications that limit the ability to realistically assess current issues. For example, IPE modeling assumptions related to plant configuration limit the ability to perform online equipment out-of-service assessments. The lack of model symmetry results in skewed risk results. IPE model simplifications related to initiating events have resulted in non-conservative estimates of risk impacts when equipment is removed from service. The IPE models also do not explicitly address all external events that are potentially risk significant as equipment is removed from service.

Energies ◽  
2021 ◽  
Vol 14 (4) ◽  
pp. 929
Author(s):  
Gyun Seob Song ◽  
Man Cheol Kim

Monte Carlo simulations are widely used for uncertainty analysis in the probabilistic safety assessment of nuclear power plants. Despite many advantages, such as its general applicability, a Monte Carlo simulation has inherent limitations as a simulation-based approach. This study provides a mathematical formulation and analytic solutions for the uncertainty analysis in a probabilistic safety assessment (PSA). Starting from the definitions of variables, mathematical equations are derived for synthesizing probability density functions for logical AND, logical OR, and logical OR with rare event approximation of two independent events. The equations can be applied consecutively when there exist more than two events. For fail-to-run failures, the probability density function for the unavailability has the same probability distribution as the probability density function (PDF) for the failure rate under specified conditions. The effectiveness of the analytic solutions is demonstrated by applying them to an example system. The resultant probability density functions are in good agreement with the Monte Carlo simulation results, which are in fact approximations for those from the analytic solutions, with errors less than 12.6%. Important theoretical aspects are examined with the analytic solutions such as the validity of the use of a right-unbounded distribution to describe the uncertainty in the unavailability/probability. The analytic solutions for uncertainty analysis can serve as a basis for all other methods, providing deeper insights into uncertainty analyses in probabilistic safety assessment.


2021 ◽  
Author(s):  
Yuhang Zhang ◽  
Zhijian Zhang ◽  
He Wang ◽  
Lixuan Zhang ◽  
Dabin Sun

Abstract To ensure nuclear safety and prevent or mitigate the consequences of accidents, many safety systems have been set up in nuclear power plants to limit the consequences of accidents. Even though technical specifications based on deterministic safety analysis are applied to avoid serious accidents, they are too poor to handle multi-device managements compared with configuration risk management which computes risks in nuclear power plants based on probabilistic safety assessment according to on-going configurations. In general, there are two methodologies employed in configuration risk management: living probabilistic safety assessment (LPSA) and risk monitor (RM). And average reliability databases during a time of interest are employed in living probabilistic safety assessment, which may be naturally applied to make long-term or regular management projects. While transient risk databases are involved in risk monitor to measure transient risks in nuclear power plants, which may be more appropriate to monitor the real-time risks in nuclear power plants and provide scientific real-time suggestions to operators compared with living probabilistic safety assessment. And this paper concentrates on the applications and developments of living probabilistic safety assessment and risk monitor which are the mainly foundation of the configuration risk management to manage nuclear power plants within safe threshold and avoid serious accidents.


Author(s):  
Pengyi Peng ◽  
Weidong Liu ◽  
Zhichao Yang

Instrumentation and control (I&C) systems in nuclear power plants (NPPs) have the ability to initiate the safety-related functions necessary to shut down the plants and maintain the plants in a safe shutdown condition. I&C systems of low reliability will bring risks to the safe operation of NPPs. A sufficient level of redundancy and diversity of I&C design to ensure the safety is a major focus when designing a new reactor. Usually multiple signal paths are included in an I&C system design. Meanwhile, besides the protection and safety monitoring system (PMS), other sub-systems of I&C such as the diverse actuation system (DAS) will be included as a diverse backup of PMS to perform the functions of reactor trip and engineered safety features actuation systems (ESFAS). However, the construction costs increase as the level of system redundancy and diversity grows. In fact, from the perspective of deterministic theory, an I&C system of only two chains can meet the single failure criterion. So how to obtain the balance of safety and economy is a challenging problem in I&C system designing. Probabilistic Safety Assessment (PSA) is the most commonly used quantitative risk assessment tool for decision-making in selecting the optimal design among alternative options. In this paper, PSA technique was used to identify whether the I&C system design offers adequate redundancy, diversity, and independence with sufficient defense-in-depth and safety margins in the design of a new reactor. Firstly, detailed risk assessment criteria for I&C design were studied and identified in accordance with nuclear regulations. Secondly, different designs were appropriately modeled, and the risk insights were provided, showing the balance of safety and economy of each design. Furthermore, potential design improvements were evaluated in terms of the current risk assessment criterion. In the end, the optimal design was determined, and uncertainty analyses were performed. The results showed that all four designs analyzed in this paper were met the safety goals in terms of PSA, but each design had a different impact on the balance of risk. As the support systems of the NPP we analyzed were relatively weak, loss of off-site power and loss of service water were two main risk contributors. The common cause failure of reactor trip breakers and the sensors of containment pressure were risk-significant. After identifying the major risk factors, the I&C design team can perform subsequent optimizations in the further design based on the PSA results and achieve an optimal balance between safety and economy.


2020 ◽  
Vol 6 ◽  
pp. 39
Author(s):  
Jean-Pierre Van Dorsselaere ◽  
Ahmed Bentaib ◽  
Thierry Albiol ◽  
Florian Fichot ◽  
Alexei Miassoedov ◽  
...  

The Fukushima-Daiichi accidents in 2011 underlined the importance of severe accident management (SAM), including external events, in nuclear power plants (NPP) and the need of implementing efficient mitigation strategies. To this end, the Euratom work programmes for 2012 and 2013 was focused on nuclear safety, in particular on the management of a possible severe accident at the European level. Relying upon the outcomes of the successful Euratom SARNET and SARNET2 projects, new projects were launched addressing the highest priority issues, aimed at reducing the uncertainties still affecting the main phenomena. Among them, PASSAM and IVMR project led by IRSN, ALISA and SAFEST projects led by KIT, CESAM led by GRS and sCO2-HeRO lead by the University of Duisburg-Essen. The aim of the present paper is to give an overview on the main outcomes of these projects.


2011 ◽  
Vol 241 (9) ◽  
pp. 3967-3976 ◽  
Author(s):  
Antonio César Ferreira Guimarães ◽  
Celso Marcelo Franklin Lapa ◽  
Maria de Lourdes Moreira