Investigation of Steam Turbine Warm-Keeping by Use of Air

2019 ◽  
Vol 141 (11) ◽  
Author(s):  
Dennis Toebben ◽  
Piotr Luczynski ◽  
Manfred Wirsum ◽  
Wolfgang F. D. Mohr ◽  
Klaus Helbig

AbstractThe changing energy landscape leads to a rising demand of more flexible power generation. A system for steam turbine (ST) warm-keeping provides the ability to shutdown conventional power plants during periods with a high share of renewable power. Simultaneously, these power plants are ready for grid stabilization on demand without an excessive consumption of lifetime during the start-up. One technical solution to keep a ST warm is the use of hot air, which is passed through the turbine. In addition, the air supply prevents corrosion during standstill and also enables the prewarming after maintenance or long outages. This paper investigates the warm-keeping process of an intermediate pressure (IP) ST (double-shell configuration) through the use of dynamic numerical finite element (FE) simulations. As a representative test case, warm-keeping calculations during a weekend shutdown (60 h) are conducted to investigate the temperatures, their distribution, and gradients within the rotor and the casing. For this purpose, an improved numerical calculation model is developed. This detailed three-dimensional FE model (including blades and vanes) uses heat transfer correlations conceived for warm-keeping with low air mass flows in gear mode operation. These analytical correlations take heat radiation, convection, and contact heat transfer at the blade roots into account. The thermal boundary conditions (BCs) at the outer walls of the rotor and casing are determined by use of experimental natural cool-down data. The calculation model is finally compared and verified with this dataset. The results offer valuable information about the thermal condition of the ST for a subsequent start-up procedure. The warm-keeping operation with air is able to preserve hot start conditions for any time period. Most of the heat is transferred close to the steam inlet of the turbine, which is caused by similar flow directions of air and steam. Thus, temperatures in the last stages and in the casing remain well below material limits. This allows higher temperatures at the first blade groove of the turbine, which is highly loaded during a turbine startup and thus crucial to the lifetime.

Author(s):  
Dennis Toebben ◽  
Piotr Luczynski ◽  
Manfred Wirsum ◽  
Wolfgang F. D. Mohr ◽  
Klaus Helbig

Abstract The changing energy landscape leads to a rising demand of more flexible power generation. A system for steam turbines warm-keeping provides the ability to shutdown conventional power plants during periods with a high share of renewable power. Simultaneously, these power plants are ready for grid stabilization on demand without an excessive consumption of lifetime during the start-up. One technical solution to keep a steam turbine warm is the use of hot air which is passed through the turbine. In addition, the air supply prevents corrosion during standstill and also enables the pre-warming after maintenance or long outages. This paper investigates the warm-keeping process of an intermediate pressure steam turbine (double shell configuration) through the use of dynamic numerical Finite-Elements (FE) simulations. As a representative test-case, warm-keeping calculations during a weekend shutdown (60h) are conducted to investigate the temperatures, their distribution and gradients within the rotor and the casing. For this purpose an improved numerical calculation model is developed. This detailed 3D FE model (including blades and vanes) uses heat transfer correlations conceived for warm-keeping with low air mass flows in gear mode operation. These analytical correlations take heat radiation, convection and contact heat transfer at the blade roots into account. The thermal boundary conditions at the outer walls of rotor and casing are determined by use of experimental natural cool-down data. The calculation model is finally compared and verified with this data set. The results offer valuable information about the thermal condition of the steam turbine for a subsequent start-up procedure. The warm-keeping operation with air is able to preserve hot start conditions for any time period. Most of the heat is transferred close to the steam inlet of the turbine, which is caused by similar flow directions of air and steam. Thus, temperatures in the last stages and in the casing stay well below material limits. This allows higher temperatures at the first blade groove of the turbine, which are highly loaded during a turbine startup and thus crucial to the lifetime.


Author(s):  
Y. Kostenko ◽  
D. Veltmann ◽  
S. Hecker

Abstract Growing renewable energy generation share causes more irregular and more flexible operational regimes of conventional power plants than in the past. It leads to long periods without dispatch for several days or even weeks. As a consequence, the required pre-heating of the steam turbine leads to an extended power plant start-up time [1]. The current steam turbine Hot Standby Mode (HSM) contributes to a more flexible steam turbine operation and is a part of the Flex-Power Services™ portfolio [2]. HSM prevents the turbine components from cooling via heat supply using an electrical Trace Heating System (THS) after shutdowns [3]. The aim of the HSM is to enable faster start-up time after moderate standstills. HSM functionality can be extended to include the pre-heating option after longer standstills. This paper investigates pre-heating of the steam turbine with an electrical THS. At the beginning, it covers general aspects of flexible fossil power plant operation and point out the advantages of HSM. Afterwards the technology of the trace heating system and its application on steam turbines will be explained. In the next step the transient pre-heating process is analyzed and optimized using FEA, CFD and analytic calculations including validation considerations. Therefor a heat transfer correlation for flexible transient operation of the HSM was developed. A typical large steam turbine with an output of up to 300MW was investigated. Finally the results are summarized and an outlook is given. The results of heat transfer and conduction between and within turbine components are used to enable fast start-ups after long standstills or even outages with the benefit of minimal energy consumption. The solution is available for new apparatus as well as for the modernization of existing installations.


Author(s):  
Piotr Łuczyński ◽  
Lukas Pehle ◽  
Manfred Wirsum ◽  
Wolfgang F. D. Mohr ◽  
Jan Vogt ◽  
...  

Abstract Motivated by the urgent need for flexibility and start-up capability improvements of conventional power plants in addition to extending their life cycle, General Electric provides its customers with a product to pre-warm steam turbines using hot air. In this paper, the transient thermal and structural analyses of a 19-stage IP steam turbine in various start-up operating modes are discussed in detail. The presented research is based on previous investigations and utilises a hybrid (HFEM - numerical FEM and analytical) approach to efficiently determine the time-dependent temperature distribution in the components of the steam turbine. The simulation strategy of the HFEM model applies various analytical correlations to describe heat transfer in the turbine channel. These are developed by means of extensive unsteady multistage conjugate heat transfer simulations for both start-up turbine operation with steam and pre-warming operation with hot air. Moreover, the complex numerical setup of the HFEM model also considers the thermal contact resistance (TCR) on the surfaces between vane and casing as well as blades and rotor. Prior to the analysis of other turbine start-up operating modes, the typical start-up turbine process is calculated and validated against an experimental data as a benchmark for subsequent analysis. In addition to heat transfer correlations, the simulation of a turbine start-up from cold state uses an innovative analytic pressure model to allow for a consideration of condensation effects during first phase of start-up procedure.


Author(s):  
Dennis Toebben ◽  
Tobias Burgard ◽  
Sebastian Berg ◽  
Manfred Wirsum ◽  
Liu Pei ◽  
...  

Abstract Combined cycle power plants (CCPP) have many advantages compared to other fossil power plants: high efficiency, flexible operation, compact design, high potential for combined heat and power (CHP) applications and fewer emissions. However, fuel costs are relatively high compared to coal. Nevertheless, major qualities such as high operation flexibility and low emissions distinctly increase in relevance in the future, due to rising power generation from renewable energy sources. An accelerated start-up procedure of CCPPs increases the flexibility and reduces the NOx-emissions, which are relatively high in gas turbine low load operation. Such low load operation is required during a cold start of a CCPP in order to heat up the steam turbine. Thus, a warm-keeping of the thermal-limiting steam turbine results in an accelerated start-up times as well as reduced NOx-emissions and lifetime consumption. This paper presents a theoretical analysis of the potential of steam turbine warm-keeping by means of hot air for a typical CCPP, located in China. In this method, the hot air passes through the steam turbine while the power plant is shut off which enables hot start conditions at any time. In order to investigate an improved start-up procedure, a physical based simplified model of the water-steam cycle is developed on the basis of an operation data set. This model is used to simulate an improved power plant start-up, in which the steam turbine remains hot after at least 120 hours outage. The results show a start-up time reduction of approximately two-thirds in comparison to a conventional cold start. Furthermore, the potential of steam turbine warm-keeping is discussed with regards to the power output, NOx-emissions, start-up costs and lifetime consumption.


Author(s):  
Mingya Chen ◽  
Weiwei Yu ◽  
Fei Xue ◽  
Francis Ku ◽  
Zhilin Chen ◽  
...  

The objective of this study is to correct installation non-conformance of a surge line using the excavation and re-weld method which is widely used in nuclear power plants. The surge line with a backslope was not at the required design level after initial installation. In order to solve the problem, a repairing technology is shown as follows: the weld was successively excavated and welded again while the surge line slope was corrected with the help of jacks. Because many of the degradation mechanisms relevant to power plant components can be accelerated by the presence of welding residual stresses (WRS), the WRS caused by the repairing process need to be studied. In this paper, the WRS simulation technique employed in this project is sophisticated. It utilizes a 3-D finite element (FE) model, and simulates the weld sequencing and excavation. Moreover, the WRS simulation performed in this project not only uses the un-axisymmetric model, but also considers the deformation caused by the external jacking loads. The results show that the repairing process is effective, and strain damage induced by the welding repair is also acceptable.


Author(s):  
Yifeng Hu ◽  
Puning Jiang ◽  
Xingzhu Ye ◽  
Gang Chen ◽  
Junhui Zhang ◽  
...  

Nowadays, in order to accommodate electrical grids that include fluctuating supplies of green energy, more and more fossil power plants are increasingly required to start up and shut down frequently. The increased number of stress cycles leads to a significant reduction of lifetime. In this paper, numerous load cycles of steam turbine casing including various start up and shut down conditions were numerically investigated by using the finite element analysis (FEA). The total strain throughout the cycles was directly calculated by the elastic-plastic material model. The delta equivalent total strain was determined by rainflow count method, and the assessment of lifetime was evaluated.


Author(s):  
Debabrata Mukhopadhyay ◽  
Howard M. Brilliant ◽  
Xiaoqing Zheng

Shell deflection during shutdown, cool-down process is a phenomenon well known to the steam turbine community. The main reason for this phenomenon is slower cooling of the top half shell and a relative faster cooling of the bottom half shell. There are multiple reasons for such thermal behavior of the two half casings, including natural heat convection from the bottom half to the top half, asymmetrical distribution of mass, dissimilar behavior of thermal insulation over the top and the bottom halves, etc. Shell deflection poses considerable challenge to the clearance engineer in terms of configuring operating clearance which ensures rub free operations. Understanding the cool-down process for the rotor is also equally important as the allowable steam inlet temperature during the hot or warm restart will depend on prevailing local temperature of the rotor. This paper describes an exemplary physics-based cool-down prediction methodology capable of accurately capturing the rotor cool-down process. The methodology involves development of a full 3D rotor casing thermal model, integrated conjugate heat transfer FE model and validated with measured field data.


Author(s):  
Yasuhiro Yoshida ◽  
Kazunori Yamanaka ◽  
Atsushi Yamashita ◽  
Norihiro Iyanaga ◽  
Takuya Yoshida

In the fast start-up for combined cycle power plants (CCPP), the thermal stresses of the steam turbine rotor are generally controlled by the steam temperatures or flow rates by using gas turbines (GTs), steam turbines, and desuperheaters to avoid exceeding the thermal stress limits. However, this thermal stress sensitivity to steam temperatures and flow rates depends on the start-up sequence due to the relatively large time constants of the heat transfer response in the plant components. In this paper, a coordinated control method of gas turbines and steam turbine is proposed for thermal stress control, which takes into account the large time constants of the heat transfer response. The start-up processes are simulated in order to assess the effect of the coordinated control method. The simulation results of the plant start-ups after several different cool-down times show that the thermal stresses are stably controlled without exceeding the limits. In addition, the steam turbine start-up times are reduced by 22–28% compared with those of the cases where only steam turbine control is applied.


2006 ◽  
Vol 20 (25n27) ◽  
pp. 4371-4376
Author(s):  
SUNGHO CHANG ◽  
GEEWOOK SONG ◽  
BUMSHIN KIM ◽  
JUNGSEB HYUN ◽  
JEONGSOO HA

The operational mode of thermal power plants has been changed from base load to duty cycle. From the changeover, fossil power plants cannot avoid frequent thermal transient states, for example, start up and stop, which results in thermal fatigue damage at the heavy section components. The rotor is the highest capital cost component in a steam turbine and requires long outage for replacing with a new one. For an optimized power plant operational life, inspection management of the rotor is necessary. It is known in general that the start-up and shutdown operations greatly affect the steam turbine life. The start-up operational condition is especially severe because of the rapid temperature and rotational speed increase, which causes damage and reduction of life of the main components life of the steam turbine. The start-up stress of a rotor which is directly related to life is composed of thermal and rotational stresses. The thermal stress is due to the variation of steam flow temperature and rotational stress is due to the rotational speed of the turbine. In this paper, the analysis method for the start-up stress of a rotor is proposed, which considers simultaneously temperature and rotational speed transition, and includes a case study regarding a 500MW fossil power plant steam turbine rotor. Also, the method of quantitative damage estimation for fatigue-creep damage to operational conditions, is described. The method can be applied to find weak points for fatigue-creep damage. Using the method, total life consumption can be obtained, and can be also be used for determining future operational modes and life extension of old fossil power units.


Author(s):  
Wolfgang Beer ◽  
Lukas Propp ◽  
Lutz Voelker

New flexible operational regimes with fast start-ups and fast-changing load cycles for steam turbines require calculation procedures for determining optimal start-up times in order not to exceed the limits of thermal stress for the steam turbine parts. This work presents a start-up time calculation for various kinds of industrial steam turbines. An analytical approach for estimating the optimal thermal load of a turbine from quasi-steady or steady condition is developed. The geometry of the respective turbine components, the changing of the steam parameters and heat transfer effects during the start-up procedure are taken into account while observing the respective material properties and stress limits. The temperature distributions of the respective turbine parts are calculated with a one-dimensional numerical algorithm of Fourier’s heat conduction equation. Three-dimensional influences of the geometry and of the the heat flux are considered analytically by adjusting the numerical solutions of elementary bodies (e.g. one-dimensional plate). The start-up time calculation is performed in small time steps to guarantee the stability of the numerical solution. The unsteady stress analysis for the start-up procedure does not uniquely identify one critical component. The calculation must be repeated for each time step to identify the component which limits the start-up gradient. Other boundary conditions, such as restricted speed ranges of the rotor with minimum transients and time for synchronization with the electrical grid, are considered by the model too and can further limit the start-up gradient and lead to slower start-up procedures. The one-dimensional calculation models were verified with a three-dimensional FEA of the casing and a two axis symmetrical FEA of the rotor. The results for the temperature distribution are presented and compared to the one-dimensional results. The final result of the analytical approach for an optimized start-up time calculation is verified with two typical start-up calculations, one for a generator drive steam turbine and one for a mechanical-drive steam turbine.