Optimal Operation of a Gas Turbine Cogeneration Plant in Consideration of Equipment Minimum Up and Down Times

Author(s):  
Ryohei Yokoyama

It has become important for operators to determine operational strategies of energy supply plants appropriately corresponding to energy demands varying with season and time from the viewpoints of economics, energy saving, and reduction in CO2 emission. Especially, cogeneration plants produce heat and power simultaneously, which increases alternatives for operational strategies. This makes it more important for operators to determine operational strategies of cogeneration plants appropriately. In this paper, for the purpose of assisting operators or operating plants automatically, an optimal operational planning method based on the mixed-integer linear programming is developed to determine the operational strategy of equipment so as to minimize the operational cost, in consideration of equipment minimum up and down times for each piece of equipment to be operated with appropriate numbers of startups and shutdowns. In the numerical study, the proposed method is applied to the daily operational planning of a gas turbine cogeneration plant for district energy supply. It is clarified how the constraints for minimum up and down times affect the operational strategy and cost. Through the study, the validity and effectiveness of the proposed method is ascertained.

Author(s):  
Ryohei Yokoyama

It has become important for operators to determine operational strategies of energy supply plants appropriately corresponding to energy demands varying with season and time from the viewpoints of economics, energy saving, and recently reduction in CO2 emission. Especially, cogeneration plants produce heat and power simultaneously, which increases alternatives for operational strategies. This makes it more important for operators to determine operational strategies of cogeneration plants appropriately. In this paper, for the purpose of assisting operators or operating plants automatically, an optimal operational planning method based on the mixed-integer linear programming is developed to determine the operational strategy of equipment so as to minimize the operational cost, in consideration of equipment minimum up and down times for each piece of equipment to be operated with appropriate numbers of startups and shutdowns. In the numerical study, the proposed method is applied to the daily operational planning of a gas turbine cogeneration plant for district energy supply. It is clarified how the constraints for minimum up and down times affect the operational strategy and cost. Through the study, the validity and effectiveness of the proposed method is ascertained.


Author(s):  
Ryohei Yokoyama ◽  
Koichi Ito

A rational method of determining the operational strategy of energy supply plants in consideration of equipment startup/shutdown cost is proposed. The operational planning problem is formulated as a large-scale mixed-integer linear programming one, in which on/off status and energy flow rates of equipment are determined so as to minimize the sum of energy supply and startup/shutdown costs over the period considered. By utilizing a special structure of the problem, an algorithm of solving the problem efficiently is proposed. Through a numerical study on the daily operational planning of a gas turbine cogeneration plant for district heating and cooling, the effectiveness of the proposed algorithm is ascertained in terms of computation time, and the influence of equipment startup/shutdown cost on the operational strategy and cost is clarified.


Author(s):  
Ryohei Yokoyama ◽  
Masashi Ohkura ◽  
Tetsuya Wakui

Some optimal operation methods based on the mixed-integer linear programming (MILP) have been proposed to operate energy supply plants properly from the viewpoints of economics, energy saving, and CO2 emission reduction. However, most of the methods are effective only under certain energy demands. In operating an energy supply plant actually, it is necessary to determine the operational strategy properly based on predicted energy demands. In this case, realized energy demands may differ from the predicted ones. Therefore, it is necessary to determine the operational strategy so that it is robust against the uncertainty in energy demands. In this paper, an optimization method based on the MILP is proposed to conduct the robust optimal operation of energy supply plants under uncertain energy demands. The uncertainty in energy demands is expressed by their intervals. The operational strategy is determined to minimize the maximum regret in the operational cost under the uncertainty. In addition, a hierarchical relationship among operation modes and on/off states of equipment, energy demands, and energy flow rates of equipment is taken into account. First, a general formulation of a robust optimal operation problem is presented, which is followed by a general solution procedure. Then, in a numerical study, the proposed method is applied to a gas turbine cogeneration plant for district energy supply. Through the study, some features of the robust optimal operation are clarified, and the validity and effectiveness of the proposed method are ascertained.


1999 ◽  
Vol 121 (4) ◽  
pp. 254-261 ◽  
Author(s):  
R. Yokoyama ◽  
K. Ito

A rational method of determining the operational strategy of energy supply plants in consideration of equipment startup/shutdown cost is proposed. The operational planning problem is formulated as a large-scale mixed-integer linear programming one, in which on/off status and energy flow rates of equipment are determined so as to minimize the sum of energy supply and startup/shutdown costs over the period considered. By utilizing a special structure of the problem, an algorithm of solving the problem efficiently is proposed. Through a numerical study on the daily operational planning of a gas turbine cogeneration plant for district heating and cooling, the effectiveness of the proposed algorithm, is ascertained in terms of computation time, and the influence of equipment startup/shutdown cost on the operational strategy and cost is clarified.


Author(s):  
Ryohei Yokoyama ◽  
Masashi Ohkura ◽  
Tetsuya Wakui

Some optimal operation methods based on the mixed-integer linear programming have been proposed to operate energy supply plants properly from the viewpoints of economics, energy saving, and CO2 emission reduction. However, most of the methods are effective only under certain energy demands. In operating an energy supply plant actually, it is necessary to determine the operational strategy properly based on predicted energy demands. In this case, realized energy demands may differ from the predicted ones. Therefore, it is necessary to determine the operational strategy so that it is robust against the uncertainty in energy demands. In this paper, an optimization method based on the mixed-integer linear programming is proposed to conduct the robust optimal operation of energy supply plants under uncertain energy demands. The uncertainty in energy demands is expressed by their intervals. The operational strategy is determined to minimize the maximum regret in the operational cost under the uncertainty. In addition, a hierarchical relationships among operation modes and on/off states of equipment, energy demands, and energy flow rates of equipment are taken into account. First, a general formulation of a robust optimal operation problem is presented, which is followed by a general solution procedure. Then, in a numerical study, the proposed method is applied to a gas turbine cogeneration plant for district energy supply. Through the study, some features of the robust optimal operation are clarified, and the validity and effectiveness of the proposed method are ascertained.


Author(s):  
Koichi Ito ◽  
Ryohei Yokoyama ◽  
Yoshikazu Matsumoto

The effect of installing steam injected gas turbines in a cogeneration plant is analyzed in the aspects of unit sizing and operational planning. An optimization method is used to determine the capacities of gas turbines and other auxiliary machinery in consideration of their operational strategies for variations of electricity and thermal energy demands. Through a numerical study on a plant for district hearing and cooling, it is clarified how the installation of steam injected gas turbines in place of simple cycle ones can improve the economic and energy saving properties. The influence of capital cost of steam injected gas turbines on the unit sizing and the above properties is also clarified.


Author(s):  
Mihael Gabriel Tomšič ◽  
Olgica Perović

The paper deals with optimal sizing of a gas turbine for repowering of cogeneration power plant Ljubljana considering possible plant operational strategy with respect to variations of electric and heat loads and energy costs. CHP plant is a main source for the Ljubljana town district heating system. Existing plant consists of two condensing steam turbines with steam extraction, back pressure turbine with steam extraction, auxiliary steam and hot water boilers for peak heat load production. This system delivers up to 111 MW into the power grid and up to 348 MW of heat. Repowering with gas turbine generator set with additionally fired heat recovery boiler is considered. For uncoupling heat and power generation a heat storage tank is assumed. For sizing of new equipment and plant operational strategy a model based on mixed-integer linear programming was developed. Zero - one integer variables are adopted to indicate the on/off status of operation, continuous variables to indicate the operational level of each constituent equipment and an optimal solution is derived by branch and bound method. Two prospective sizes of TG sets were tested for range of assumptions regarding power purchase tariff schedules. Different optimal operation policies resulted. The study provides background for contract negotiation and for investment decisions.


Author(s):  
Ryohei Yokoyama ◽  
Koichi Ito ◽  
Tatsuhiro Murata

In designing cogeneration plants, the estimation of energy demands is an important work. However, many conditions under which energy demands are estimated have some uncertainty at the design stage. Therefore, designers should consider that energy demands have some uncertainty, evaluate the robustness in the performance under uncertain energy demands, and design plants rationally in consideration of the robustness. The authors have developed a robust optimal design method based on the minimax regret criterion for the single-stage planning of energy supply plants. In this paper, the method is extended for the multistage expansion planning. Under uncertain energy demands increasing stepwise, equipment capacities and utility contract demands as well as energy flow rates for each expansion period are determined in consideration of their sequential relationships to minimize the maximum regret in the annual total cost and satisfy all the possible energy demands for all the expansion periods. Through a case study on a gas turbine cogeneration plant for district energy supply, features of the economic robustness and the robust optimal design are clarified in relation to the uncertainty in energy demands and the numbers of years for the expansion periods.


2004 ◽  
Vol 126 (4) ◽  
pp. 823-830 ◽  
Author(s):  
Ryohei Yokoyama ◽  
Koichi Ito ◽  
Tatsuhiro Murata

In designing cogeneration plants, the estimation of energy demands is an important work. However, many conditions under which energy demands are estimated have some uncertainty at the design stage. Therefore, designers should consider that energy demands have some uncertainty, evaluate the robustness in the performance under uncertain energy demands, and design plants rationally in consideration of the robustness. The authors have developed a robust optimal design method based on the minimax regret criterion for the single-stage planning of energy supply plants. In this paper, the method is extended for the multistage expansion planning. Under uncertain energy demands increasing stepwise, equipment capacities and utility contract demands as well as energy flow rates for each expansion period are determined in consideration of their sequential relationships to minimize the maximum regret in the annual total cost and satisfy all the possible energy demands for all the expansion periods. Through a case study on a gas turbine cogeneration plant for district energy supply, features of the economic robustness and the robust optimal design are clarified in relation to the uncertainty in energy demands and the numbers of years for the expansion periods.


1997 ◽  
Vol 119 (1) ◽  
pp. 131-136 ◽  
Author(s):  
K. Ito ◽  
R. Yokoyama ◽  
Y. Matsumoto

The effect of installing steam-injected gas turbines in a cogeneration plant is analyzed with respect to unit sizing and operational planning. An optimization method is used to determine the capacities of gas turbines and other auxiliary machinery in consideration of their operational strategies for variations of electricity and thermal energy demands. Through a numerical study on a plant for district heating and cooling, it is clarified how the installation of steam-injected gas turbines in place of simple-cycle ones can improve the economic and energy-saving properties. The influence of the capital cost of steam-injected gas turbines on the unit sizing and the above-mentioned properties is also clarified.