Extended
TODIM‐PROMETHEE II
method with hesitant probabilistic information for solving potential risk evaluation problems of water resource carrying capacity
Keyword(s):
2017 ◽
Vol 74
◽
pp. 012003
◽
Keyword(s):
2020 ◽
Vol 27
(17)
◽
pp. 21590-21603
◽
2020 ◽
Vol 27
(29)
◽
pp. 37057-37073
◽
2016 ◽
Vol 10
(12)
◽
pp. 955-962
Keyword(s):
2020 ◽
Vol 710
◽
pp. 136324
◽
Keyword(s):
2014 ◽
Vol 955-959
◽
pp. 3075-3078
2017 ◽
Vol 11
(1)
◽
pp. 258-269
◽