Optimal solution for the connectivity of PV systems on a scheduled availability of the grid: Case study for Lebanon

Author(s):  
Imad Mougharbel ◽  
Ahmad Makkawi ◽  
Hassan Ghazal
Keyword(s):  
2020 ◽  
Vol 21 (2) ◽  
pp. 225-234
Author(s):  
Ananda Noor Sholichah ◽  
Y Yuniaristanto ◽  
I Wayan Suletra

Location and routing are the main critical problems investigated in a logistic. Location-Routing Problem (LRP) involves determining the location of facilities and vehicle routes to supply customer's demands. Determination of depots as distribution centers is one of the problems in LRP.  In LRP, carbon emissions need to be considered because these problems cause global warming and climate change. In this paper, a new mathematical model for LRP considering CO2 emissions minimization is proposed. This study developed a new  Mixed Integer Linear Programming (MILP)  model for LRP with time windows and considered the environmental impacts.  Finally, a case study was conducted in the province of Central Java, Indonesia. In this case study, there are three depot candidates. The study results indicated that using this method in existing conditions and constraints provides a more optimal solution than the company's actual route. A sensitivity analysis was also carried out in this case study.


Author(s):  
Ruá María José ◽  
Huedo Patricia ◽  
Cabeza Manuel ◽  
Saez Beatriz ◽  
Civera Vicente

In the urban context, buildings play a key role as they are energy consumers. In well-established cities with a high percentage of aged building stock, the focus should lie on sensitive urban areas where the weakest population sectors and the worst physico-economic conditions are usually encountered. In this work, the energy refurbishment of social housing is proposed. A block of municipally owned buildings is selected as a case study to consider that public buildings play an exemplary role according to Directive 2012/27/EU. The group is formed by 12 buildings, which account for 120 dwellings.This study is grounded on two levels. First the urban level. The building is located in a prioritised urban Area of Rehabilitation, Renovation and Urban Regeneration (ARRU), according to the new local Land Plan. This area presents multidimensional vulnerability and considers urban, building, socio-demographic and socio-economic features. Second, the building presents very low energy performance. It was built in 1959 when a high demand of dwellings and the economic resources then available led to low-quality buildings that are far from meeting today’s standards.Some proposals are made, having in mind the specific features of the urban context. The energy refurbishment of the building is proposed, selecting the optimal solution, considering technical, environmental and economic criteria. The energy performance simulation shows a remarkable improvement of the energy performance, resulting in an improvement of the thermal comfort of the dwellers. Besides, a reduction in the energy consumption is reached, which would reduce the energy bills and, on the other hand, a reduction of the carbon emissions to the atmosphere, contributing to a better environment quality. Having in mind that the building is intended for social housing, energy poverty situations could be avoided, as dwellings are inhabited by low-income dwellers.


Author(s):  
Ahmed T. Sadiq Al-Obaidi ◽  
Hasanen S. Abdullah ◽  
Zied O. Ahmed

<p>Evolutionary computation and swarm intelligence meta-heuristics are exceptional instances that environment has been a never-ending source of creativeness. The behavior of bees, bacteria, glow-worms, fireflies and other beings have stirred swarm intelligence scholars to create innovative optimization algorithms. This paper proposes the Meerkat Clan Algorithm (MCA) that is a novel swarm intelligence algorithm resulting from watchful observation of the Meerkat (Suricata suricatta) in the Kalahari Desert in southern Africa. This animal shows an exceptional intelligence, tactical organizational skills, and remarkable directional cleverness in its traversal of the desert when searching for food. A Meerkat Clan Algorithm (MCA) proposed to solve the optimization problems through reach the optimal solution by efficient way comparing with another swarm intelligence. Traveling Salesman Problem uses as a case study to measure the capacity of the proposed algorithm through comparing its results with another swarm intelligence. MCA shows its capacity to solve the Traveling Salesman’s Problem. Its dived the solutions group to sub-group depend of meerkat behavior that gives a good diversity to reach an optimal solution. Paralleled with the current algorithms for resolving TSP by swarm intelligence, it has been displayed that the size of the resolved problems could be enlarged by adopting the algorithm proposed here.</p>


2018 ◽  
Vol 7 (4) ◽  
pp. 62-99 ◽  
Author(s):  
P.Senthil Kumar

This article proposes a method for solving intuitionistic fuzzy solid transportation problems (IFSTPs) in which only the transportation costs are represented in terms of intuitionistic fuzzy numbers (IFNs). The remaining parameters, namely: supply, demand and conveyance capacity, are all considered into crisp numbers. This type of STP is called a type-2 IFSTP. When solving the real life solid transportation problems (STPs) those tend to face the uncertainty state as well as hesitation due to many uncontrollable factors. To deal with uncertainty and hesitation many authors have suggested the intuitionistic fuzzy representation for the data. In this article, the author tried to categorise the STPs under the uncertain environment. He formulates the intuitionistic fuzzy STPs and utilizes the triangular intuitionistic fuzzy number (TIFN) to deal with uncertainty and hesitation. The PSK (P.Senthil Kumar) method for finding an intuitionistic fuzzy optimal solution for fully intuitionistic fuzzy transportation problem (FIFTP) is extended to solve the type-2 IFSTP and the optimal objective value of type-2 IFSTP is obtained in terms of TIFN. The main advantage of this method is that the optimal solution of type-2 IFSTP is obtained without using the basic feasible solution and the method of testing optimality. Moreover, the proposed method is computationally very simple and easy to understand. A case study is presented to illustrate the procedure of the proposed method.


2017 ◽  
Vol 8 (4) ◽  
pp. 1-17
Author(s):  
Han Huang ◽  
Hongyue Wu ◽  
Yushan Zhang ◽  
Zhiyong Lin ◽  
Zhifeng Hao

Running-time analysis of ant colony optimization (ACO) is crucial for understanding the power of the algorithm in computation. This paper conducts a running-time analysis of ant system algorithms (AS) as a kind of ACO for traveling salesman problems (TSP). The authors model the AS algorithm as an absorbing Markov chain through jointly representing the best-so-far solutions and pheromone matrix as a discrete stochastic status per iteration. The running-time of AS can be evaluated by the expected first-hitting time (FHT), the least number of iterations needed to attain the global optimal solution on average. The authors derive upper bounds of the expected FHT of two classical AS algorithms (i.e., ant quantity system and ant-cycle system) for TSP. They further take regular-polygon TSP (RTSP) as a case study and obtain numerical results by calculating six RTSP instances. The RTSP is a special but real-world TSP where the constraint of triangle inequality is stringently imposed. The numerical results derived from the comparison of the running time of the two AS algorithms verify our theoretical findings.


2018 ◽  
Vol 2018 ◽  
pp. 1-9 ◽  
Author(s):  
Jinjin Gao ◽  
Yuan Zheng ◽  
Jianming Li ◽  
Xiaoming Zhu ◽  
Kan Kan

An optimization model for the complementary operation of a photovoltaic-wind-pumped storage system is built to make full use of solar and wind energy. Apart from ensuring the maximum economic benefit which is normally used as the only objective, the stable objectives of minimizing the output fluctuation and variation of load and output difference are added to form the multiobjective problems because of lack of study on access capacity of photovoltaic and wind power. The model aims to increase the power benefit and reduce the output fluctuation and variation of load and output difference under the constraints of station, output balance, and transmission limitation. In a case study, four schemes including single-objective independent operation, single-objective complementary operation, and multiobjective complementary operation are compared to discuss the effect of pumped storage station on economic objective and stable objectives. Furthermore, the opposite trend of the two objectives is proved and a compromise optimal solution is given. The results indicate that the pumped storage station can effectively increase power benefit and access capacity of photovoltaic and wind power. The study can provide references to the complementary optimization of the pumped storage station and the intermittent renewable energy.


Energy ◽  
2020 ◽  
Vol 208 ◽  
pp. 118149
Author(s):  
Yao K. Azoumah ◽  
Alain K. Tossa ◽  
Rock A. Dake

Sign in / Sign up

Export Citation Format

Share Document