Developing life cycle management plans for power plant components

Author(s):  
Srinath Raghavan ◽  
Badrul Chowdhury
2018 ◽  
Vol 1074 ◽  
pp. 012153
Author(s):  
Jie Yang ◽  
Liang Yuan ◽  
Lin Su ◽  
Qiang Qin ◽  
Rudong Wang

Author(s):  
Xinjian Duan ◽  
Michael J. Kozluk ◽  
Ming Li

This paper discusses the comprehensive integrity assessment of feeders fabricated from normalized pipe and elbow piping items subject to Flow Accelerated Corrosion (FAC) during in-service conditions. The arguments are based on the improved mechanistic understanding of FAC; review of international piping rupture events; examinations of removed feeders; burst-pressure tests of prototypical and ex-service feeder piping sections, the minimum acceptable wall thickness for feeder piping; and station feeder life cycle management plans. It is concluded that rupture of feeder pipe due to FAC is a very low probability event.


2021 ◽  
Vol 252 ◽  
pp. 02075
Author(s):  
Yang Jie ◽  
Yuan Liang ◽  
Yang Wu ◽  
Qin Qiang

Daya Bay Nuclear Power Plant has been running for above 20 years. main condensers have begun to run during the commissioning phase before the official commercial operation, so it is imminent to carry out the life cycle management of main condensers combined with demonstration of the operation license extended to 60 years. A life cycle management system for main condensers in nuclear power plant is established in this paper, which is applied to management practices of Daya Bay Nuclear Power Plant.


Sign in / Sign up

Export Citation Format

Share Document