Linkages among project management maturity, PMO, and project success

Author(s):  
Vittal Anantatmula ◽  
Parviz Rad
2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Aqsa Ameer ◽  
Farah Naz ◽  
Bushra Gul Taj ◽  
Iqra Ameer

Purpose The purpose of this study is to determine the effect of conscientiousness and extraversion personality traits on project success. The relationship is mediated by affective professional commitment, whilst the relationship between personality traits and project success is moderated by organizational project management maturity. Design/methodology/approach The deductive approach is used to achieve the objectives of this study. Data were collected through a purposive sampling technique from 250 respondents with the help of questionnaires from information technology sectors. The structural equation modelling (SEM) in partial least squares-SEM and SPSS is used to analyse the data and to examine the hypothesis. Findings The outcomes demonstrate the partial mediating impact of affective professional commitment between the relationship of conscientiousness and extraversion personalities with project success. Additionally, it proves the moderating effects of project management maturity between the relationship of conscientiousness and extraversion personalities with project success. Practical implications This study reflects that employee personality appears to be a reliable indicator of how an employee is faithful to his profession. This faithfulness or duty decides the employee’s execution in terms of offering a successful project. Thus, achieving employee commitment needs to be done by completing the project successfully by the organizations in the presence of project management maturity systems. Originality/value It is the first study of its kind to provide experimental proof of the impact of a manager’s personality traits on project success in the presence of affective professional commitment (mediator) and organizational project management maturity (moderator).


2005 ◽  
Vol 36 (1) ◽  
pp. 37-50 ◽  
Author(s):  
Mark Ives

Change within organizations is becoming the rule rather than the exception as businesses seek to respond to an increasingly fluid, complex, and global business environment. This drive demands that organizations embrace a more strategic response to avoid being leap-frogged by more nimble competitors. As Cicmil points out (1997, 1999), strategic organizational change is most likely facilitated and managed through an organization's use of the project management disciplines. This study attempts to develop a greater understanding of the contextual aspects of project management in an organizational change setting. In reviewing the current literature, I have found an increasing use of project management within organizations and an attendant poor rate of success among these projects; interestingly, I also found only limited research on the context and fit of projects within organizations. I have addressed this void with an essentially exploratory research project that utilizes inductive strategy. The process I have used is qualitative and based on in-depth interviews with four people.


2019 ◽  
Vol 9 (2) ◽  
pp. 56-65
Author(s):  
Michael Pace

Abstract This non-experimental correlational study extends previous research investigating the relationship between project management methodology and reported project success, as well as the moderating variables of industry and project manager experience. The sample included North American project managers with five years’ experience, 25 years of age or older, and experience with multiple project management methodologies. The survey instrument consisted of 58 questions, utilizing a 5-point Likert scale to record responses. The survey contained three sections, including demographic information, questions related to a successful project, and questions related to a less-than successful (failed / challenged) project. 367 usable responses were received. The examination of the constructs included Pearson’s correlation coefficient as well as linear regression to determine the impact of moderating variables. Results indicated that project management methodology has a weak correlation with reported project success, and this correlation is not moderated by industry nor project manager experience. The results did not align with previously conducted studies, illustrating a need to continue the study of methods impacting success including investigating additional moderating variables.


Author(s):  
Ahmed Fraz ◽  
Asim Waris ◽  
Saad Afzal ◽  
Mohsin Jamil ◽  
Syed Tasweer Hussain Shah ◽  
...  

2019 ◽  
Vol 25 (6) ◽  
pp. 531-550
Author(s):  
Mariela Sjekavica Klepo ◽  
Mladen Radujković

There is a continuous need to improve existing project management decision-making support models, particularly those for monitoring and control are needed to increase chances for success. In this paper, potential of early warning in project management was focused, along with its connection to project success via project success factors. First, a systematic literature review was conducted, along with the focus group method, in order to identify project success factors. The selected success factors were also collected on 93 water infrastructure projects through a survey. By the means of linear regression analysis, critical success factors were finally determined. The results were integrated in the early warning system algorithm, composed by three modules – detection, validation and response module. The response module is composed by three dimensions: 1) risk, constraint and change management, 2) incorporation of project management competences and 3) application of project management methods, tools and techniques. The proposed early warning system was tested on three infrastructure projects. The results confirmed that improved early warning system can contribute in increase of project management success. As original database is composed by projects from only one country (Croatia), in the final stage of the research proposed approach was checked in five countries from the Central or South East Europe (Czech Republic, Slovenia, Serbia, North Macedonia, Bosnia and Herzegovina). The results from the final stage confirmed potential of the proposed approach as declared originally, so it is reasonable to expect success in early warning system’s implementation due to similarities of critical success factors on projects as well as project management problems in general, that countries in regions share. This research presents new and creative way in linking early warning and project success, as well as interpretation of early response through different dimensions in project management. Also, based on the results of this research, it is possible to create a useful practical tool for managing other types of projects.


2015 ◽  
Vol 764-765 ◽  
pp. 895-899
Author(s):  
Shiow Luan Wang ◽  
Thi Hoa Vu

Construction projects are becoming ever more complex and time driven, especially as the amount of project data and active project participants’ increase. For achieving a project success, project management not only must to meet time, cost, quality objectives, but also satisfies the project stakeholders needs related to the project management process. Project managers were difficult to effectively seizing, collecting and handling information which are generated from different systems. The elements of information presentation in web-based was contributed an important role to project management success. The purpose of this study is to provide a background to denote the enhancing project management via information presentation based on effective information technology/information systems which are emphasized in web-based.