Improving Cost, Performance, and Security of Memory Encryption and Authentication

Author(s):  
Chenyu Yan ◽  
D. Englender ◽  
M. Prvulovic ◽  
B. Rogers ◽  
Yan Solihin
2006 ◽  
Vol 34 (2) ◽  
pp. 179-190 ◽  
Author(s):  
Chenyu Yan ◽  
Daniel Englender ◽  
Milos Prvulovic ◽  
Brian Rogers ◽  
Yan Solihin

Author(s):  
Mario Werner ◽  
Thomas Unterluggauer ◽  
Robert Schilling ◽  
David Schaffenrath ◽  
Stefan Mangard

1991 ◽  
Vol 30 (01) ◽  
pp. 53-64 ◽  
Author(s):  
R. Schosser ◽  
C. Weiss ◽  
K. Messmer

This report focusses on the planning and realization of an interdisciplinary local area network (LAN) for medical research at the University of Heidelberg. After a detailed requirements analysis, several networks were evaluated by means of a test installation, and a cost-performance analysis was carried out. At present, the LAN connects 45 (IBM-compatible) PCs, several heterogeneous mainframes (IBM, DEC and Siemens) and provides access to the public X.25 network and to wide-area networks for research (EARN, BITNET). The network supports application software that is frequently needed in medical research (word processing, statistics, graphics, literature databases and services, etc.). Compliance with existing “official” (e.g., IEEE 802.3) and “de facto” standards (e.g., PostScript) was considered to be extremely important for the selection of both hardware and software. Customized programs were developed to improve access control, user interface and on-line help. Wide acceptance of the LAN was achieved through extensive education and maintenance facilities, e.g., teaching courses, customized manuals and a hotline service. Since requirements of clinical routine differ substantially from medical research needs, two separate networks (with a gateway in between) are proposed as a solution to optimally satisfy the users’ demands.


Author(s):  
I Made Sukarsa ◽  
I Made Rama Pradana ◽  
Putu Wira Buana

Communication via sockets is used to transmit information between applications or between processes over network or locally. ZeroMQ is a library for sending messages using sockets that are quite well known. Talking about sending data, message security is an important part that needs to be taken into account, especially when sending data over a network. ZeroMQ sends messages openly without securing the messages sent. This is evidenced by research which states that ZeroMQ does not have a security layer for sending messages over the network and direct observation of message packets using the wireshark application. Therefore, this study creates a method of securing and authenticating message delivery using AES (Advanced Encryption Standard) CBC (Cipher Block Chaining) mode combined with an authentication method. The AES CBC mode was chosen because it is faster than other methods and has strong encryption. This encryption and authentication are used so that the sender and recipient of the message are both valid senders and recipients so that no message changes during message delivery and messages can only be opened by the message recipient and the sender of the message. Tests are conducted to measure the effect of encryption and authentication on message delivery performance. Based on the tests conducted, there is an increase of 7% from normal delivery speed and the potential for messages is not up to 0.3% - 1.5%.


Author(s):  
Ahmed Salem Ahmed Marey Alhammadi ◽  
◽  
Aftab Hameed Memon ◽  

UAE construction industry frequently faces poor cost performance which commonly known as cost overrun problem. This problem is resulted from several factors and it is important to identify these cost overrun factors in order to avoid and minimize it. Hence, this paper focused on determined the relevancy of factors affecting cost performance in construction projects of UAE. Through a review of past research works conducted globally, 27 factors of cost overrun were listed and used for developing a structured questionnaire. A survey was conducted with 33 practitioners from client, consultant and contractors organizations involved in handling construction projects in UAE. The respondents were requested to state their perception regarding the relevancy of each of the factors that was perceived in context with cost overrun issue using 5-points Likert scale. The responses were analysed using average index method and the results found that all the 27 factors are relevant with construction industry of UAE in causing cost overrun. These factors can be used for further investigation to uncover critical problems of cost overrun.


Sign in / Sign up

Export Citation Format

Share Document