Effects of power supply surges on personal computers

Author(s):  
M.E. Baran ◽  
W. Tocharoenchai ◽  
K. Craven ◽  
A.W. Kelley
2021 ◽  
Vol 12 (4) ◽  
pp. 1279-1283
Author(s):  
Khadka Vikram Thapa Magar ◽  
Aviral Kandel ◽  
Deepak Neupane ◽  
Dipak Rijal

PLC is a medium between electrical systems and personal computers for SCADA to take input and output bits. SCADA and PLC communication systems make it possible to integrate protection control and monitor electrical parameters together for maximum benefit. The idea is to provide continuous power supply to the load, based on the priority by switching the loads. In case any one of the sources is absent i.e., source 1, source 2 and source 3, then automatically the least priority load cuts-off and first priority load gets supply continuously.


Author(s):  
A. Tanaka ◽  
M. Yamaguchi ◽  
T. Hirano

The plasma polymerization replica method and its apparatus have been devised by Tanaka (1-3). We have published several reports on its application: surface replicas of biological and inorganic specimens, replicas of freeze-fractured tissues and metal-extraction replicas with immunocytochemical markers.The apparatus for plasma polymerization consists of a high voltage power supply, a vacuum chamber containing a hydrocarbon gas (naphthalene, methane, ethylene), and electrodes of an anode disk and a cathode of the specimen base. The surface replication by plasma polymerization in negative glow phase on the cathode was carried out by gassing at 0.05-0.1 Torr and glow discharging at 1.5-3 kV D.C. Ionized hydrocarbon molecules diffused into complex surface configurations and deposited as a three-dimensionally polymerized film of 1050 nm in thickness.The resulting film on the complex surface had uniform thickness and showed no granular texture. Since the film was chemically inert, resistant to heat and mecanically strong, it could be treated with almost any organic or inorganic solvents.


Author(s):  
David C. Joy

Personal computers (PCs) are a powerful resource in the EM Laboratory, both as a means of automating the monitoring and control of microscopes, and as a tool for quantifying the interpretation of data. Not only is a PC more versatile than a piece of dedicated data logging equipment, but it is also substantially cheaper. In this tutorial the practical principles of using a PC for these types of activities will be discussed.The PC can form the basis of a system to measure, display, record and store the many parameters which characterize the operational conditions of the EM. In this mode it is operating as a data logger. The necessary first step is to find a suitable source from which to measure each of the items of interest. It is usually possible to do this without having to make permanent corrections or modifications to the EM.


2019 ◽  
Vol 2 (1) ◽  
pp. 8-16 ◽  
Author(s):  
P. A. Khlyupin ◽  
G. N. Ispulaeva

Introduction: The co-authors provide an overview of the main types of wind turbines and power generators installed into wind energy devices, as well as advanced technological solutions. The co-authors have identified the principal strengths and weaknesses of existing wind power generators, if applied as alternative energy sources. The co-authors have proven the need to develop an algorithm for the selection of a wind generator-based autonomous power supply system in the course of designing windmill farms in Russia. Methods: The co-authors have analyzed several types of wind turbines and power generators. Results and discussions: The algorithm for the selection of a wind generator-based autonomous power supply system is presented as a first approximation. Conclusion: The emerging algorithm enables designers to develop an effective wind generator-based autonomous power supply system.


2019 ◽  
Vol 5 (1) ◽  
pp. 35-45
Author(s):  
Markus Dwiyanto Tobi ◽  
Alimuddin Mappa

The role of the power supply device is to produce, process and distribute energy sources. Telecommunication equipment can only operate if it has continuous supply. Therefore, to maintain the continuity of the supply, a UPS (Uninterruptable Power Supply) device system is needed so that the supply to the Essential Load device will remain available so that continuity will be maintained. This research designs and proposes how a series of automatic redundant switch systems on UPS to ensure the availability of power supply for the main equipment of telecommunications systems. The Auto switch circuit is designed to have 3 (three) working stages which will trigger the relay driver as control circuit, namely the normal working condition of the contactor input K1 is present, the input condition is zero (lost), and the input condition is present. This system can automatically supply power to telecommunications equipment.


2020 ◽  
Vol 20 (3) ◽  
pp. 209-215
Author(s):  
Hyun-Seok Song ◽  
Min-Ho Son ◽  
Sung-Ju Yoo ◽  
Do-Hyun Jung ◽  
Boo-Hee Park

Sign in / Sign up

Export Citation Format

Share Document