Optimal Design for High and Steep Slope Angle of Open-pit Mine

Author(s):  
Guiping Chang ◽  
Ming Zhu ◽  
Rui Tang ◽  
Zhiyun Tian ◽  
Lixin Ai ◽  
...  
2014 ◽  
Vol 716-717 ◽  
pp. 248-251
Author(s):  
Xiao Long Ma ◽  
Guang Zhang ◽  
Qing Guo Ren ◽  
Xiu Ling Jiang

With the rapid advance of industrialization,the consumption of mineral resources is increasing.For open pit mine,many of them went into deep mining.The current,widespread adoption of open pit slope angle makes deep concave mining has a huge stripping ratio.So many mines in trouble,on the premise of guarantee the deep sunken open pit slope stability increase slope toe can bring huge economic benefits,and a lot of research work has been done.This paper describes the factors affecting the stability of open-pit mine slope,the slope rock mass stress analysis,to calculate the lower steep slope economic benefits,puts forward reasonable suggestions the future research direction of the slope stability of open-pit mine.


2021 ◽  
Vol 2021 ◽  
pp. 1-10
Author(s):  
Zhiyu Zhang ◽  
Qingyun Qian ◽  
Jianguo Wang ◽  
Haoshan Liu ◽  
Ke Liang ◽  
...  

In order to prevent rockfall caused by open-pit blasting on the high and steep slope and ensure that the passive protective net structure has sufficient impact resistance, the mechanism of blasting flyrock causing rockfall is analyzed by using ANSYS/AUTODYN to establish the model of rockfall and passive protective net; at the same time, the influences of protective net size, rockfall kinetic energy, and rockfall size to the protective effect were also studied. The results show that under the condition of the same rockfall kinetic energy and rockfall size, the larger the size of the protective net, the longer the buffer time, and the impact force that net can sustain is greater; by assuming the protective net size and rockfall size to be a constant, the greater the rockfall kinetic energy, the less the interaction time between rock and net, and the greater the impulse force that net can suffer; similarly, by keeping the protective net size and the kinetic energy of rockfall to be a constant, it is found that the larger the size of the rockfall, the larger the interaction area and longer interaction time with the net, and the less net will be disrupted; the protective net used in the mine can intercept the rockfall caused by flyrock in blasting process effectively and ensure the safety of villager at the foot of the mountain.


2020 ◽  
Vol 194 ◽  
pp. 04043
Author(s):  
Guo Xiaoli ◽  
Yan Jiancheng ◽  
Li Xueliang ◽  
Wen Xin ◽  
Li Xingli

The dumps in the open-pit mining area in the eastern grassland are prone to landslides due to the fragile ecological environment, so it is inevitable to reshape the dump slopes. In order to explore a more scientific method for slope shaping of open-pit mine dump, slope stability analysis were used to compare effect of three types of slope-type (wave-shaped, slope-shaped and step-shaped slope shaping method)in outside dumping site of Baori Hiller open-pit mine. The results show that the slope stability is negatively correlated with the slope angle, and the stability of different shaping slopes is realized as wave-shaped slope (F=2.711)> Slope-shaped slope(F=2.513)>Step-shaped slope(F=1.047), in which the wave type and slope type are all within the safe range, but the step type slope is unstable; in consideration of cost, stability and erosion resistance, it is better to set the slope angle of the dump to 15°.The wave-shaped shaping method of the natural dumping of the excavation field outside the Baori Hiller open-pit mine has the best effect and is worth promoting.


2013 ◽  
Vol 734-737 ◽  
pp. 656-660 ◽  
Author(s):  
Shao Jie Feng ◽  
Shi Guo Sun ◽  
Ya Nan Yi

The critical slip field theory is applied to optimization design of the slope angle. An intelligent matching optimization of the slope angle design is carried out based on the strata distribution, mechanics parameters of rock mass and a given security reserve. That is the implementation of the maximum allowable slope angle of slope rock mass under the given conditions. Optimized by the final highwall of Buzhaoba Open-Pit Mine, the overall slope angle increased 3°compared to the original design. Which implement the optimum slope angle of final highwall, modified the shortcoming in the original design and ensure the maximization of mine safety and the resource exploitation.


Sign in / Sign up

Export Citation Format

Share Document