Stakeholder analysis of a centralized biogas plant in China — The case of Yangling
2017 ◽
Vol 20
(1)
◽
pp. 314-322
◽
Keyword(s):
2011 ◽
Vol 27
(3)
◽
pp. 405-414
◽
2017 ◽
2007 ◽
Vol 6
(6)
◽
pp. 491-495
◽
2015 ◽
Vol 14
(4)
◽
pp. 745-749