Attracting wind generators to the wholesale market by mitigating individual exposure to intermittent outputs: An adaptation of the Brazilian experience with hydro generation

Author(s):  
Guilherme L. Susteras ◽  
Dorel S. Ramos ◽  
Jose Roberto de A. Chaves ◽  
Alexandra C. V. J. Susteras
Human Ecology ◽  
2017 ◽  
pp. 3-8 ◽  
Author(s):  
L. B. Masnavieva ◽  
I. V. Kudaeva ◽  
N. V. Efimova ◽  
О. М. Zhurba
Keyword(s):  

Author(s):  
S. I. Nefedkin ◽  
A. O. Barsukov ◽  
M. I. Mozgova ◽  
M. S. Shichkov ◽  
M. A. Klimova

The paper proposes an alternative scheme of guaranteed electricity and heat supply of an energy-insulated facility with a high potential of wind energy without the use of imported or local fuel. The scheme represents a wind power complex containing the park of wind generators located at the points with high wind potential. The wind generators provide guaranteed power supply even in periods of weak wind. For heat supply of the consumer, all surplus of the electric power goes on thermoelectric heating of water in tanks of accumulators, and also on receiving hydrogen by a method of electrolysis of water. The current heat supply is carried out with the use of hot water storage tanks, and the heat supply during the heat shortage is carried out by burning the stored hydrogen in condensing hydrogen boilers. We have developed the algorithm of calculation and the program "Wind in energy" which allows calculating annual balance of energy and picking up necessary quantity of the equipment for implementation of the scheme proceeding from the annual schedule of thermal and electric loading, and also potential of wind energy in the chosen region. The calculation-substantiation of the scheme proposed in relation to the real energy-insulated object Ust-Kamchatsk (Kamchatka) is carried out. The equipment for the implementation of an alternative energy supply scheme without the use of imported fuel is selected and compared with the traditional energy supply scheme based on a diesel power plant and a boiler house operating on imported fuel. With the introduction of an alternative power supply scheme, the equipment of the traditional scheme that has exhausted its resource can be used for backup power supply. Using climate databases, a number of energy-insulated facilities in the North and East of Russia with high wind energy potential are considered and the conditions for the successful implementation of the energy supply scheme are analyzed. This requires not only a high average annual wind speed, but also a minimum number of days of weak wind. In addition, it is necessary that the profile of the wind speed distribution in the annual section coincides with the profile of the heat load consumption.


2020 ◽  
Vol 10 (10) ◽  
pp. 59-67
Author(s):  
Victor N. ANTIPOV ◽  
◽  
Andrey D. GROZOV ◽  
Anna V. IVANOVA ◽  
◽  
...  

The overall dimensions and mass of wind power units with capacities larger than 10 MW can be improved and their cost can be decreased by developing and constructing superconducting synchronous generators. The article analyzes foreign conceptual designs of superconducting synchronous generators based on different principles: with the use of high- and low-temperature superconductivity, fully superconducting or only with a superconducting excitation system, and with the use of different materials (MgB2, Bi2223, YBCO). A high cost of superconducting materials is the main factor impeding commercial application of superconducting generators. In view of the state of the art in the technology for manufacturing superconductors and their cost, a conclusion is drawn, according to which a synchronous gearless superconducting wind generator with a capacity of 10 MW with the field winding made of a high-temperature superconducting material (MgB2, Bi-2223 or YBCO) with the «ferromagnetic stator — ferromagnetic rotor» topology, with the stator diameter equal to 7—9 m, and with the number of poles equal to 32—40 has prospects for its practical use in the nearest future.


Author(s):  
E. V. Kovalevskiy ◽  
J. . Schuz ◽  
S. V. Kashanskiy

In 2019, with the aim of assessing mortality risks, the formation of the world’s largest cohort of chrysotile asbestos miners and millers was completed at the largest developed chrysotile mine in the world, including a large proportion of working women with extensive data to assess individual exposure and vital status.


Sign in / Sign up

Export Citation Format

Share Document