Key Performance Indicators for a Capability-Based Application Portfolio Management

Author(s):  
Pouya Aleatrati Khosroshahi ◽  
Jannis Beese ◽  
Fatih Yilmaz ◽  
Florian Matthes ◽  
Robert Winter
2018 ◽  
Vol 10 (2) ◽  
pp. 85-101 ◽  
Author(s):  
Mohsen Shahandashti ◽  
Baabak Ashuri ◽  
Ali Touran ◽  
Reza Masoumi ◽  
Edward Minchin

The purpose of this study is to determine the relative importance of key results areas (KRAs) and develop key performance indicators (KPIs) for construction portfolio performance management. The research methodology consists of the following steps: (1) Designing and conducting a fact-finding survey of owners and contractors to determine the relative importance of KRAs; (2) Designing and conducting structured interviews to develop KPIs; and (3) Assessing the usefulness of the results. Unlike the literature that has consistently highlighted the importance of risk management for construction portfolio performance management, risk management is not among top five KRAs (schedule, cost, cash flow, change management and safety) identified in the survey. This represents the significant gap in how research community and industry look at portfolio performance management. When it comes to dashboard development, contractors and owners have different KRAs within their dashboard for portfolio management. The limited knowledge about the relative importance of KRAs is one of the most important barriers towards managing project portfolios. This study is the first attempt to critically examine the literature and practice of construction portfolio performance management in order to highlight noteworthy differences between KRAs studied by the research community and implemented by the industry.


CCIT Journal ◽  
2012 ◽  
Vol 6 (1) ◽  
pp. 17-34
Author(s):  
Untung Rahardja ◽  
Muhamad Yusup Eva ◽  
Rosyifa Rosyifa

SQL Server Reporting Services is a way to analyze data, create reports using the indicators and gauges. Indicators are minimal gauges that convey the state of a single data value at a glance, and most are used to represent the state of Key Performance Indicators. Manage and harmonize the performance of an institution's educational institutions, especially universities with the performance of individuals or resources, no doubt is one of the essential elements for the success of an entity of the institution. Integrate the performance of an educational institution with individual performance is not an easy process, and therefore required a systematic approach to manage it. Implementation of a strategic management system based Balanced Scorecard can be used as a performance measurement system that will continuously monitor the successful implementation of the strategy of any public educational institution and measure the performance of its resources in a comprehensive and balanced, not the quantity but the emphasis is more concerned with the quality, so the performance of educational institutions at any time can be known clearly. Contribution of Key Performance Indicators to manage and harmonize the performance of any public institution is a solution in providing information to realize the extent of work that has set targets, identify and monitor measures of success, of course, with performance indicators show a clear, specific and measurable.


Author(s):  
W.J. Parker ◽  
N.M. Shadbolt ◽  
D.I. Gray

Three levels of planning can be distinguished in grassland farming: strategic, tactical and operational. The purpose of strategic planning is to achieve a sustainable long-term fit of the farm business with its physical, social and financial environment. In pastoral farming, this essentially means developing plans that maximise and best match pasture growth with animal demand, while generating sufficient income to maintain or enhance farm resources and improvements, and attain personal and financial goals. Strategic plans relate to the whole farm business and are focused on the means to achieve future needs. They should be routinely (at least annually) reviewed and monitored for effectiveness through key performance indicators (e.g., Economic Farm Surplus) that enable progress toward goals to be measured in a timely and cost-effective manner. Failure to link strategy with control is likely to result in unfulfilled plans. Keywords: management, performance


Sign in / Sign up

Export Citation Format

Share Document